Loading...
HomeMy WebLinkAbout1977-12-12 65 AF ORDER65 AF ... Introduced by Councilor Willey, December 12, 1977 r CITY OF BANGOR QITLFJ 19frbgrI Accepting City,Fn� neer'e_.Report - Final Cost of Union _.... _ _ Street Sewer Extension By the CRY Cnaemd of As C:H ofBaayor: ORDERED, - TMT the attached report of the City Engineer showing the actual cost and recommended assea"aments for the extension of the sanitary sewer on Union Street in a southeasterly direction for a distance of 620 feet be and hereby is accepted, and be it further ORDERED, that since prefunding in the amount of $39500.00 was received from the Midas Realty Corporation for the newer exothnsion, and since the actual Developers' share of the final cost isonly$2,330.61, NOW THEREFORE, be',it ORDERED, that the sum of $1,16939 be refunded to the Midas Realty Corporation. IN CITY CWNCIL December 12., 1977 Referred to Finance Committee. Public hearing to be advertised. Consider next meeting. �v CITY RK IN C19Y COUNCIL Ceeember 28, 1977 Passed �[cy 65 AF OR DER Title, cCeRinae[ a Re A tinai Citx EnA �Yt Final Cost of Union street Newer ......... 4 ............................ Extension I lea by Councilman RECEIVED CITY Of BMrOR CITY CLERK Y. v;'RICE °n Dre a sst 1 58 CITY OF BANGOR-, MAINE Engineering Department December 6, 1977 To the Municipal Officers Reference is made to City Council Order No. 337 AR passed August 81 1977, authorizing the extension of the sanitary sewer on Union Street. All work has been completed, and the following report is submitted: The sewer installation consisted of 620 feet of 8 inch pipe and 2 manholes, extending in a southeasterly direction from the existing terminus of the sewer near the Penobscot Savings Drive - In Bank to a point near the new Midas Muffler building, presently under construction. The actual cost of the sewer installation was $9,322.42, substantially below the estimate of $14,210.00. Of this amount, the City would pay 50%, with $4,661.21 assessed against the properties benefited, as follows: Owner Frontage Recommended Assessment Northeast Side Albert & Frederick Bean, Lot No. 2 140 feet $ 615.63 Lot No. 3 145 feet 637.62 Lot No. 4 145 feet 637.62 Lot No. 5 100 feet 439.74 Southwest Side City of Bangor (Bangor International Airport) 530 feet 29330.60 Total $4,661.21 The total actual assessment against the Been property, Lots 2 through 5, would be $2,330.61{ however, the Developers were required to prefund their originally estimated share, which amounted to $3,500.001 and which was paid by the bides Realty Corporation as part of ea agreement with the Beans., Consequently, a refund in the amount of $1,169.39 should he made to Midas Realty Corporation. A plan showing the as -built location of the sewer is on file in the office of the City Engineer. Respectfully submitted, Sohn T. Frawley, City Engineer