... Introduced by Councilor Willey, December 12, 1977
r CITY OF BANGOR
QITLFJ 19frbgrI Accepting City,Fn� neer'e_.Report - Final Cost of Union
_.... _ _
Street Sewer Extension
By the CRY Cnaemd of As C:H ofBaayor:
ORDERED, -
TMT the attached report of the City Engineer showing the
actual cost and recommended assea"aments for the extension of the
sanitary sewer on Union Street in a southeasterly direction for
a distance of 620 feet be and hereby is accepted, and be it
further
ORDERED, that since prefunding in the amount of $39500.00
was received from the Midas Realty Corporation for the newer
exothnsion, and since the actual Developers' share of the final
cost isonly$2,330.61,
NOW THEREFORE, be',it
ORDERED, that the sum of $1,16939 be refunded to the
Midas Realty Corporation.
IN CITY CWNCIL
December 12., 1977
Referred to Finance Committee.
Public hearing to be advertised.
Consider next meeting.
�v
CITY RK
IN C19Y COUNCIL
Ceeember 28, 1977
Passed �[cy
65 AF
OR DER
Title,
cCeRinae[ a Re
A tinai Citx EnA �Yt
Final Cost of Union street Newer
......... 4 ............................
Extension
I lea by
Councilman
RECEIVED
CITY Of BMrOR
CITY CLERK Y. v;'RICE
°n Dre a sst 1 58
CITY OF BANGOR-, MAINE
Engineering Department
December 6, 1977
To the Municipal Officers
Reference is made to City Council Order No. 337 AR passed
August 81 1977, authorizing the extension of the sanitary sewer
on Union Street. All work has been completed, and the following
report is submitted:
The sewer installation consisted of 620 feet of 8 inch pipe
and 2 manholes, extending in a southeasterly direction from the
existing terminus of the sewer near the Penobscot Savings Drive -
In Bank to a point near the new Midas Muffler building, presently
under construction. The actual cost of the sewer installation
was $9,322.42, substantially below the estimate of $14,210.00.
Of this amount, the City would pay 50%, with $4,661.21 assessed
against the properties benefited, as follows:
Owner
Frontage
Recommended Assessment
Northeast Side
Albert & Frederick Bean,
Lot No. 2
140
feet
$ 615.63
Lot No. 3
145
feet
637.62
Lot No. 4
145
feet
637.62
Lot No. 5
100
feet
439.74
Southwest Side
City of Bangor (Bangor
International Airport)
530
feet
29330.60
Total $4,661.21
The total actual assessment against the Been property,
Lots 2 through 5, would be $2,330.61{ however, the Developers
were required to prefund their originally estimated share,
which amounted to $3,500.001 and which was paid by the bides
Realty Corporation as part of ea agreement with the Beans.,
Consequently, a refund in the amount of $1,169.39 should he
made to Midas Realty Corporation.
A plan showing the as -built location of the sewer is on
file in the office of the City Engineer.
Respectfully submitted,
Sohn T. Frawley,