Introduced by Conncilorswcy, December 12, 1977
_ CITY OF BANGOR
(TITLE) PYrli2r, Accepting City_ Engineer's Report - Final Coat of
6 -Mart Sewer Relocation
By fhe IXhi CoanoU of tie City ofBamyor:
J7g0MRm
TEAT the attached report of the City IDgineer showing the
actual cost and recommended assessment for the relocation of a
portion of the I -Mart Sanitary Sewer through the Danger Mall
Shopping Center be end hereby is accepted, and be it further
ORDERED, that the sum of $351.09 be paid to the Developer,
'Iravco, Inc., which represents the unexpended portion of their
prefunded share of the estimated construction cost.
is Cf'ly CWMIL 43 AF
December 12, 1977
deterred to Finance Committee. 0 R 0 E R
Publichearing to be advertised.
Consider next meeting. Title,
12e"'" '1' - Accepting City engineers Report
cxxx c ............................ R.CI'JkzD
IN CITY COUNCIL Finel Cost Of X-NaYt SNeY RelOCatlon
December 28, 1977 ................................. I.... 01TY OL:z ,.. ., ., iIOE
-. - #77 f, ' 3d
Introduced and 'led
I�
Tom ..............:....... nan
flown
CITY OF BANGOR, MAINE
Engineering Department
November 28, 1977
To the Municipal Officers:
Reference is made to City Council Order No. 340 AE passed
August 8, 1977, authorizing the relocation of a portion of the
fisting K -Mart Sanitary Sewer force main in the vicinity of the
new Bangor Mall Shopping Center. All work has been completed, as
follows:
The work consisted of the relocation of 760 feet of 8 inch
force main around the northeasterly end of the new shopping center
building. The total completed cost was $10,297.83, of which the
City agreed to pay 50%, with the remaining amount to be paid by
Kravco, Inc., the Developer of the shopping center. The original
estimate for the sewer relocation was $11,000.00, and as requested
by the City Council, Kravco's share of $5,500.00 was paid in ad-
vance. Since theactual cost of the sewer installation was less
than the estimate, Kravco's share of the actual cost would be
$51148.91, which would result in a refund of $351.09•
A Plan showing the sewer relocation is on file in the office
of the City Engineer.
Respectfully submitted,
0 �
Sohn Frawley,,
En
City Engineer