Loading...
HomeMy WebLinkAbout1978-09-25 395 AF ORDER395 AF Introduced by Councilor Soacy, September 25, 1978 CITY OF BANGOR (TITLEJ (DrbtrI Approval of Amendment to Location _Permit - Water Lines on Wnstmetlincaln.Stteet and Thatcher Street WHEREAS, on Sane 26, 1978, the Bangor City Council approved a Location Permit (Council Order We. 271 AP)authorizing the construction of water linea on Nein Street, Lincoln Street and Thatcher Street; and WHEREAS. the work on this project is in progress; and WHEREAS, it has been discovered that because of existing concrete pavement there Is a need to change the location of said water mains on that portion of the cute from Cedar Street to the I-395 Overpass as described in the attached letter datedSeptember22, 1978,. from the Jesse W. Sewall Company, Old Town, Mine, .NOW, THEREFORE, By the City Council of the City of Bangor: ORDERED, THAT the Location Permit authorized by Council Order No. 271 AF, is hereby amended and revised to authorize the installation of said water lines in the following locations, subject to my changes that may become necessary as the work progresses, and as are approved by the City Engineer: "Along parts of Hain Street (Route u) bad along the sidewalk on Nein Street located in the City of Bangor. A waterline partly along the sidewalk (from Cedar St. to 1 395 overpass), and partly along Main St, from 1395 to the intersection of Thatcher and Main Street. Portions included are: 1) a 16" water main starting at Cedar St. and following the centerline of the easterly sidewalk of Main St. (generally about 42' east of the Nein St, centerline) for 2700 feet to Lincoln St.; 2) a 20" water main starting at Lincoln St. following along the Center of the sidewalk (generally about 45' east of the Main St. ceute[line north of 1 395 overpass and 25' cast of the Nein St, centerline south of 1 395 overpass) for 290 feet to Thatcher St. Pacts of this section will be in the IN CITYCOUNCILSEPTEMBER 25,1978 ry Passed S�UpICNNNCION OF TEE ROLES !f ? CITY L 395 AF O R DER Title, APPROVAL OF AMPTHENT TO LOCATION 'FjNWATER LANES REE ON MAIN STT LINCOLN N STREET AND -THATCHER BTREET Introduced and filpf by road south of the I 395 overpass; 3) Two Main St. crossings, e a 79' long 12" pipe at Lincoln St. and the other, a 71' long: 16" pipe at Thatcher St.; 6) several small pipe sections (about 10 feet long) for cross ties and hydrants; and 5) two laterals on side streets - 2000' of 12" waterline we Lincoln St. from Min to Third (following Lincoln St. centerline about 11' southerly of and parallel to ft) and 1120' of 16" water main on Thatcher St. from Main to Crosby (running about 10' northerly of and parallel to Thatcher St. centerline). Minimum Depth ofCover5 feet .11 JAMES W. SEWALL COMPANY City of Bangor City Hall 73 Harlow street Bangor, Maine 04401 Attn: Bangor City Council 147 Center street ... OLDTO".10AINEDIP68 September 22, 1978 Re: Location Permit Revision Water Main Project on Main St. Bangor Nater District On June 26, 1978 the Bangor City Council approved a location permit (271 AF) to construct 20", 16", and .1911 water lines on Main St., Lincoln St., and Thatcher St. The contract for this project was signed several weeks ago and Work has begun on the project. Late last week it was discovered that concrete pavement exists along the proposed pipe route from Cedar St. to the 1 395 overpass. This situation was asurprise to all concerned and poses significant potential extra costs to the Bangor Water District. These potential costs may in fact be high enough so that the project i celled. One possible solution may be to change the route of the proposed pipeline and install it along the sidewalk instead of in the road a was previously planned. Other advantages to this proposed routeinclude less traffic problems and reduced street maintenance during construction. If the Bangor Water District can obtain prompt approval from the Council and if the proposed route appears economically feasible, the change will likely be made. On behalf of the District and ourselves, because the contract is already in progress and construction s fast approaching the area in question, we will appreciate any special consideration the Council can offer to our request. Verytrulyyours,'. U h, John McCormack( RE Project Engineer c.. Mr. Peter Caldwell JM:rf Affiliate— UPSALQUITCH HOLDINGS LTO. P.O. Box 433 Old Town. Maim 04968 of 111:... dangar, Maim LOUMOR PERSI T APPLICATION FOP. WATER FACILITIES CMMUCTFO IN PUBLIC HAYS - `r, zctnvxia::ro uith nhaptar 2884 of the 1953 Public La's of the State of KL�,* tM Rauyor Water nietrict hereby rakes WTItten application to the City of c,,.qAev, Ake for a location pcwei: to CenatFuCt and lay the following as'.er Giles and bxtxr utility facilities: See attached 5ketthes and description. BANGOR WATER DISTRICT Peter L. Caldwuii x general 'rn�4dau:aa_xma »mc_ will oatee lois a rl5catiaa kxx xxxw-.;'Ubilshed in the Bechar Gaily Nsws,x.R :'o objoctlm+ 4o this application Noting heel rade by this A,"licanca i5 rjra;:'Gid an vt�M, Bata, pic_e of ;caring if mci.ircd: Ii! City Calved T, r. i. a: Cccy L'cis'b tal -,is p: ;r:.t i_ :e*_arSad in the. —or35 of Larger, Paine 9Y 't xb.�,_,_ Altus Description of Proposed Project: Along parts of Main Street (Route IA) and along the sidewalk on Main Street located In the City of Bangor. A waterline partly along the sidewalk (from Cedar St. to 1 395 overpass), and partly along Main St. from 1 395 to the intersection of Thatcher and Main Street. Portions included a 1) a 16" water ma in starting at Cedar St. and following the centerline of the easterly sidewalk of Main St. (generally about 42' east of the Main St. centerllne) for 2700 feet to Lincoln Sty 2) a 20" water win starting at Lincoln St. foil owing along the center of the sidewalk (generally about 45' east of the Main St. centerline north of 1 395.overpass and 25' east of the Ma in' St. centerllne south of 1 395 overpass) for 2940 feet to Thatcher St. Parts of thissectionwill be in the Dad south of the 1 395 overpass; 3) Two Main St. crossings, one a 79' long 12" pipe at�Li-ncoln St. and the other, a 7ls long 16 pipe at Thatcher St.; 4)ral small pipe sections (about 10 feet long) for < s ties and hydrants; and 5) .two laterals on side streets - 2000' of 12" waterline on Lincoln St. from Main to Third (following Lincoln St. centerline about 11' southerly of and parallel to it) and 1120' of 16" water m on Thatcher St. from Main to Crosby (running about 10' northerly of and parallel to Thatcher St. "centerline): Minimum Depth of Cover 5 fee[ Submitted by; JAMES W. SEWALL COMPANY Old Town Engineers for the Bangor Water District RJW 54 UTILITY -12 AUGUST -1972 UTILITY used Po, Cify of Pn.go. MAINE DEPARTMENT OF TRANSPORTATION PLAN OF PROPOSED UTILITY LOCATION (Toaaompany oppllcolion for a W ility Lacotion PermNi (MAT OE USED FOR ALL UTILITY PLANT) e D15fr-2t DATE 9-2Z 1978 g bah S.H.C. PROJECT NO! �— Cednv_Si: E N•h: TlnF.- relonrvd to !d ,wrc 9/eil e 5-93 o.er Pnss • snow These Oialanan • Where oppllcaele