Loading...
HomeMy WebLinkAbout1978-09-25 388 AF ORDER388 As •- Introduced by Councibv zenlzian, Septmober 25, 19]a aw ;` CITY OF BANGOR (TITLE.) OrbBC, Authorizing Construction of Streets and Sewers - College P9rk Subdivision By the City C 7ofW City OfBd q - ORDERED, TMT the attached report of the City Engineer showing the estimated costs and possible assessments for the construction of the College Park streets and sanitary sewers be and hereby is 'accepted, and be it .further ORDERED, that said streets and sewers be constructed as soon as possible. STATEMENT OF FACT: The funds covering the City's share of this project were previously included in the 1978 Capital Improvement Budget. IN CITY COMM SEPT� 2591970 RASSED G J x -�— Tine, .. P,NTgon,I,EFNq 0omgT7�Uc?,Io�y 9HS7AEWP PND SEWERS COLLEGE. PARR SRRDIVSSION .................................. In=odneed end ffied by - - Councilman N CITY OF BANGOR, MAINE Engineering Department September 21, 1978 To the Municipal Officers: Pursuant to a previous request from Warren C. Sawyer to determine the cost of constructing the streets and sewers within the College Park Subdivision, a previously approved Subdivision on land adjacent to Husson Avenue, the following report is subs mitted: The work will include the construction of two dead-end streets, temporarily referred to. ad 'A' Street and 'B' Street, Add the installation of a sanitary sewer to serve certain lots within the Subdivision. The scope of the work to be performed and the estimated costa thereof are as follows: 'A' Street This street would extend for a distance of 255 feet savth- east from Husson Avenue between Lots 13 and 14, and would consist of a 24 foot wide travel way, including the cul-de-sac. The pavement would consist of 3 inches of bituminous concrete on an 18 inch gravel base. The roadway would have a sod edge, and all disturbed areas would be provided with 3 inches of loam and seed. The total estimated construction cost is $12,600.00. In accordance with our City Ordinances, the City would pay $5.25 per foot of length, or $1,340.00, resulting in a net coat to the Developer of $11,260.00. 'B' Street This street would extend for a distance of 290 feet south- east from Husson Avenue between Lots 19 and 27, end the construc- tion would be basically the same as for !A' Street, described above. The total estimated construction coat is $13,000.00. The City's share would be $1,520.00, with the Developer's share being $11,480.00. Sanitary Sewer . The remaining sanitary sewer to beconstructed to serve Lots 7, 16, 17 and 18 consists of 305 feet. of 8.inch pipe end one manhole. The total estimated cost of construction is $5,500.00. 0£ this amount the City would pay 50%, and the Developer's coat would be $2,750.00. .. ... The total project cost would thus be $31,100.00, with the $25 4Pa ing $59610.00, and the Developer's share estimated at -1- The Developer has been advised that it will be necessary for him to pay his estimated share of the cost in advance. Hr. Sawyer has agreed to the estimates of coat and has agreed to pay in advance. He was further advised that it would be necessary for him to complete the installation of water lines prior to the construction of the roadways. It is recommended that the construction of the streets and the sewer be undertaken as soon as possible after receipt of advance payment from the Developer. Plane showing the construction of the streets arNe on file in the office of the City Engineer. -2- Respectfully submitted, -bG„4. Fya.wL„� John T. Frawley, City Engineer