HomeMy WebLinkAbout1978-08-14 343 AF ORDER343 AF
[ntroduced by Councilor saucy, Aug t 14, 1978
_HHpp CITY OF BANGOR
(TITLE.) (Orbao Authorizing City Manager to Enter into Attached Agreement
with MOT - State Street and Hogan Road Reconstruction
By City Coyncl of City ofBawy
ORDERED,
THAT WHEREAS, the City has previously entered into an Agreement
with the Maine Department of Transportation for the reconstruction
of the intersection of State Street and Hogan Road under the Federal
Urban Program, and
WHEREAS, MOT is now prepared to advertise for bids for the
construction of said improvements subject to the receipt of an
Agreement with the City, a copy of which is attached,
NOW, THEREFORE, be it
ORDERED, that the City Manager be and hereby is authorized to
sign said Agreement on behalf of the City of Bangor.
J
343 AS
IN. CITY COUNCIL - 0 R 0 E R
August 14, 1978
Referred t0 Public Norte Title,
Committee - Consider next
aae Authorizing City Manager to Enter into
.......................................
t4i, C ✓ Attached Agreement with !�T State
... ..v..
Street and Hogan Road Reconstruction
Introduced and file"
an
IN CITCOUNCIL AUGUST
28,19]88 PASSED
/) � Cllmen
/cam/c�c,d
CI?Y CLEW(
343 AP
B®gar TW -1401(1)
Page 1 of 5 began
sadist 4: 1976
CITY AGAEEHERT
THIS AGRXMNT: made this _ day of : 1976: by andbetween the
State of Heine acting by What through its Department of Transportation, hereinafter
referred to as the State and the City of Bangor: Penobscot County: a body corporate: by
and through its City Reneger hereinafter referred to as the City.
witnesseth: that
WHEREAS, the State I$ planning the reconstruction of the intersection of State Street
(Route No. 2) and Hogm Road, and;
W4DREse, the City agrees such Work is necessary;
NOW THEREFORE, the Parties agree as follawe:
I. The State fees to do the following:
A. To award a contract under Federal Aid Project No. TCR -1401(1) hareirefter
referred to as the Project, and perform Work substantially in .accordance
With the plans prepared. by the State. ®d generally described ae follows:
The Project begi+W on State Street at uta intersection .with Hogan Ross
at Station 10+00end ext Wade northeasterly along State Street 0.123 miles
toStation16 50. On Hagen Road the limit of imprw®ent shell erten! from
State Street at Station 1C+00, 1000 feet to Station 20+00.
The improvement consists of constructing traffic control islands and
realigning the intersection to improve traffic operations. A Fleshing
Beacon Will be installed at the intersection' of Hogan Ross end State Street.
B. To construct a drainage cysten adequate to handle all normal surface are
aubaarface Water for the entire Pmjeat, end to connect a Portion of this
drainmge system into the existing system, eliminating day drainage etructeres
doomed unnecessary, as pest of the Project. -
' S 1
Boor TW -1401(1)
Page 2 of 5 Pages
August 4, 19/8
C. To acquire and pay for all land, rients in lard, and baildiasS necessary
to construct and maintain the Project, except those donated by the city
to the State.
D. To provide striping end traffic control signs asnecessary en a first-
time basis.
II. AFD the City agrees to do and perform the followine:
A. To approve the. layout and coratruction of Federal Aid Project TSM -1401(1)
described in Item 1 above under the State agrees.
B. To donate to the State all land or ifghts in land owned by the City which
are required for the. Project. -
C. To authorise the State to alter or eliminate any drainage or drainage,
structures deenea unnecesaary ac; part of the Project.
D. To pay or snoods any and ;all coats (if required) for the treatment ar,i
ultimate disposal of day discharge from storm drainage oysters constructed
as part of the Project.
E. To furnish, install: and assume all future maintenance area power caste for
street lighting providing a minimum average inteiaity of Adbebrimately .0.2
foot candles.
F. 1. To assnce all maintenance and power costs for the flashing beacon and ar;,y
other signal equipment installed or modified as part of the Projects,
end to erpeditioualy correct any deficiency in the fleshing beacon
when rewired.
2. To preserve the visibility of said flashing beacon causing any impeir-
ant of visibility t0 be assured.
3. Should the Heading beacon be removed or replaced in the future, -avid
equipment shall become the property of the State 'without cost 4o the
State.
Barger TW -1401(1)
Page 3 of 5 Pages
mguet 4, 1978
G.. To pace each ordinances as ray be required to prohibit parking within the
entire limits of the Projects.
H. To eliminate and prohibit disposal of any open sewage within the limits of
the Project.
I. To make such charges within the city fire claim, system, city sewers, city
water and city street lighting, including service conrectione, manhole
adjustments and other city owned and maintained utility fixtures (if
eAeting without expense to the State as may be required as a result of
the Project._ Any Changes made during the construction of the project will
be coordinated. with the contractor's operations.
J. To aeerme all claims for damages to piavate underground utility -type instal -
lotions where the locations may net be shown on the plana for this project;
also to be responsible for the removal, replacement, alteration, or relo.
cation of any existing private underground utility type installation (such
as wires, water, scene, drain pipes) as may be necessary to parent construg-
tion of the Project within the previously described project limits.
R. To be responsible for and to notify all utilities that, encept in the case
of city, emergency, no service opening peamits for opening city pavement within
the limits of the proposed project will be issued for a period of five (5)
years from the date of the Project
1. To regulate (mbere the control of utilities using the highways is delegated
to the City) the use by all public sod private utilities of any portion of
theright of wayofthe highway, within the Pauject in accordance with the
rules, regulations, and policies applied by the State in its control of -
utility use of the highways.
Bangor TW-1401(1)
Page 4 of 5 Pages
August 4r; 1978
M. To hold inviolate the right of way for the Project aml agreethat no ede
vertieing aigno: posters: billboards: roadside stable or other private
installation shall be permitted within the said right of way limits and
soy such befor®entioved items now within the limite of the existing -
right of way shall be removed by or under direction of the City.
R. TO make the attached "Backfilling Requirements" a part Of all geovice-
opening perruts for work vnthin the limits of the Project.
Attach:
"Backfilling Requirments"
Bangor TW -1401(i)
Page 5 of 5 Pages
August 4: 1978
IN.%ITHESS IBERECP THE PARTIES TO THIS AG=ENT HAVE EXECUTED IN TRIPLICATE these
presents on the day and year first above written: the State of Maine by its Comnissioner
of the Department of Transportation: hereunto duly authorized: and the City of Bangor
by its City Manager duly eutbozized by Council Order dated
attested true copy being attached hereto and made a part hereof.
SICHEP: SEALID AND DFbTvEdESs STATE OF MAINE _
M THE PRESENCE OF: DEPARTMENT OF TRANSPORTATION
By:
Commissioner
Boger L.
Mallar
City of Bangor
APPROVED AS. TO IOM:
Assistant Attorney General
Date
I
Deeffi111 material shall be Pine, readily compressible soil or gramilac material, at Or
near opt5mum moisture content, and shall not contain stench larger than 3 inches, frozen
loops, c1cmke of clay, mineral: matter or Way other objectionable material. The material
shall be uniformly distributed in layers of not more than 8 inches, loose measure and
each layer thoroughly compacted by use of approved compaction before successive layers
are placed. When backfill is being placed around a pipe or strocture, operations shall
be so conducted that the fill is always at approximately the same elevation on both aides
of the atrncture. Water shall be added when necessary to increase the moisture content
of the backfill material to obtain compaction. puddling or Jetting of backfill will not
be allowed.
All cheating And bracing used during excavation shall be removed by the utility follow-
ing the completion of the work, and all voids resulting from the Use
of the sheeting and
bracing backfilled slices necessary unless onervide directed by theDepartment'e Engineer.