HomeMy WebLinkAbout1978-06-12 271 AF ORDERr
271 AP
Introduced by Councilor Soucy, June 12, 1978
CITY OF BANGOR
(TITLE.) fte%......... ... Application _ for focation Permit James W... Sawall Company
....... Water Facilities Constructed in public Ways
..... .............._ ......_._. _._ _._ _......
By fie MY QUOU 1l Of the My OjBal Bar:
ORDERED,
TEAT the attached application for location permit is hereby granted.
On Hain Street (Feats IA) located in the City of Bangor. A waterline on
the easterly side Of refs(Street beginning at the intersection of Cedar
and Main Street and ending at the intersection of Matcher and Main Street.
Portions included are; 1) a 16" water main starting at Cedar Street following
Min Street parallel to the centerline (generally about 28' east of the
enterline) for 2700 feet to Unable Street; 2) a 20" Water Min starting
at Lincoln Street following [A in Street parallel to one centerline (generally
about 30' east of the centerline north of I-95 and 25' east of the center-
line
enterline South of I-95) for 2940 feet to Thatcher Street; 3) TWO Main Street
crossings, one a 79' long 12" pipe at Lincoln Street and the other, a 71'
long 16" pipe at ')Matcher Street' 4) several small pipe Sections (about 10
feet long) for coast ties and hydrantsV and 5) van laterals on side streets -
2000' of 12" waterline on Lincoln Street from Main to Third (Following
Uncoln Street centerline about 11' southerly of and parallel to it) and
1120' of 16" water main on 1Tatcher Street from Main to Crosby (running
about 10' northerly of and parallel to Matcher Street centerline).
Minimum Depth of Cover 5 feet.
291 AF ORDER'` _n
Clo 444 -b 0
Title.
IN CITY COUNCIL SANE 12,1998 AMICATIC FOR LOCATION PERMIT CITY LLEFK $ OFP.-E
REVERED TO PUBLIC WORKS CIN91 SAlffS W SMALL CO. WATER RACbTTIEB
consider next meeting •.. COMORUCf.D IN R O NAM........
Introduced H d by
Gilman
KPjp. [IKC��m.r.
CITY
'IN CITY COUMIL
Sane 26, 1978
Passed
CITY Pli
X71 frP
JAMES W. SEWALL COMPANY ``'�Y�` 147 Center sneer m ...
�yw/( OIDTOWN,MAINE04468
City of Bangor
City Hall
73 Harlow Street
Bangor, Maine 04401
Re: Location Permit Application
Water Main Project on Main Street
Gentlemen
On behalf of the Bangor Water District we respectfully submit
for your approval a location permit for a new water main to be constructed
along the edge of Hain Street from Cedar Street to Thatcher Sfreet along
with connecting laterals on Lincoln Street and Thatcher Street.
As Engineers for this project, we point out'that all werk done
will be in strict accordance with ourcantract specifications and
particular attention wilI be paid to good traffic control, proper
construction procedures, and qual ity:road work.
Due to certain limitations imposed.vpon this project by the grant
agency, we are working under extremely tight timetables, therefore,
we will appreciate any special consideration that can be given to a
prompt approval of the location application.
Please feel free to contact us should you have any questions or
comments or should you wish to discuss this project further.
very truly yours,
J.l,& maedgw .
John McCormack, P.E.
Project Engineer
cc: Mr. Peter L. Caldwell
Mr. John Frawley
Affiliate— UPSALQUITCH HOLDINGS LTO. P.O. Box 433 Old Town, Meine04,168
'M
m,
June
8,
1978
City of Bangor
City Hall
73 Harlow Street
Bangor, Maine 04401
Re: Location Permit Application
Water Main Project on Main Street
Gentlemen
On behalf of the Bangor Water District we respectfully submit
for your approval a location permit for a new water main to be constructed
along the edge of Hain Street from Cedar Street to Thatcher Sfreet along
with connecting laterals on Lincoln Street and Thatcher Street.
As Engineers for this project, we point out'that all werk done
will be in strict accordance with ourcantract specifications and
particular attention wilI be paid to good traffic control, proper
construction procedures, and qual ity:road work.
Due to certain limitations imposed.vpon this project by the grant
agency, we are working under extremely tight timetables, therefore,
we will appreciate any special consideration that can be given to a
prompt approval of the location application.
Please feel free to contact us should you have any questions or
comments or should you wish to discuss this project further.
very truly yours,
J.l,& maedgw .
John McCormack, P.E.
Project Engineer
cc: Mr. Peter L. Caldwell
Mr. John Frawley
Affiliate— UPSALQUITCH HOLDINGS LTO. P.O. Box 433 Old Town, Meine04,168
BANGOR NATER DISTRICT
P.O. Box 804
Danger, helps
LOCATION PERMIT APPLICATION
FOR
HATER FACILITIES CONSTRUCTED IN PUBLIC NAYS
In anobrdaea with Chapter 286 of the 1963 Public Leas of the State of
Haim the Bangor Hater District hereby uwkes written mPliea£ion to the 69ty
Of Bangor, Pine for a location mandit to Construct and lay the following
Nazar Pipes and enter utility facilities:
See attached sketches and description.
RARBOR WATER DISTRICT
Peter L. Caldwell
eawoasu..rorvmnaacmmaaeanemaemaasaaamaensaooavmre.,$ea�nx neneememsrtnmsnnaae
will be
This application Aon A5pm:puylishetl in the Banger Daily Ness M within several days.
Na, abjection to this application Davina been anile by 2Dis
application is granted one
Tim, Date. Place of N¢aring if Pelvises:
In City Council
Date
Passed
A True Copy Attest:
® city 'GieFT—
Ibis perAt is recorded in the rou:rds of Bangor, Naim in Book
Paga�w_
Attest:
clerk
Description of proposed project:
On Main Street (Route IA) located in the City of Bangor. A waterline
n the easterly side of Main Street beginning at the intersection of Cedar
and Main St. and ending at the intersection of Thatcher and Main St.
Portions Included are:
1) a 16" water main starting at Cedar St. following
Main St. parallel to the centerline (generally about 28' east of the
centerline) for 2700 feet to Lincoln St.; 2) a 20" water main starting at
Lincoln St. following Main St. parallel to the centerline (generally about
30' east of the centerline north of 1995 and 25' east of the centerline
south of 1-95) for 2940 feet to Thatcher St.; 3) Two Main St. crossings,
one a 79' long 12" pipe at Lincoln St. and the other, a 71' long 1611 pipe
at Thatcher St.; 4) several small pipe sections (about 10 feet long) for
cross ties and hydrants;; and 5) Two laterals o aide streets - 2000'- of
1211 waterline on Lincoln St. from Main to Third (following Lincoln St.
enterline about ll' southerly of and parallel to it) and 1120' of 16" water
on Thatcher St. from Main to Crosby (running about 10' northerly of
andnparallel to Thatcher St. centerline)
Minimum Depth of Cover 5 feet
Submitted by:
JAMES W. SEWALL COMPANY
Old Town
Engineers for the Bangor Water District
c Irrk
4
fNc A ��/IUHMexo�Q{� 6?
0
'fes O�
0 Cr
2
C
\ si/ PST
IL
a�
rj-�-WAY Mo. sea
ROAD
billDO
DO
• e�r� rya
A y
Opti ` 1 F
Future Extension of 2d' Min
0
µ
PROJECT SITE PLAN
BANGOR WATER DISTRICT
Approx. Scale; 1" = 1000 PROPOSED CONSTRUCTION OF
R NAI NS
February, I978 NEW MAIN
BANGOR, MINE
Used for CAy of P0.Bar - fi.cmek
R/W 59 MAINE DEPARTMENT OF TRANSPORTATION
UTILITY -12 PLAN OF PROPOSEOUTILITY LOCATION
AUGUST -1972 (To accompony oppllcalion lora LIMIT Localion Permll) '
(MAY BE USED FOR ALL UTILITY PLANT)
UTILITY
8¢n r W.f¢r Akt,;ct DATE June $ 19%8
Ave...,. SX[. PROJECT NO,
a.
rhe+herr
ul I Ig �
Over F¢FS
• Show These Disl¢nces
a WFese oppllcable
262 AT
APPLICATION POR 2WiING OSDINANCF. AND NAP AMENDMENT
T0: THE CITY COUNCIL AND DOW Ida
THE PLANNING BOARD OF BANGOR, MAINE:
NO.
l�1l P.
/� 1 Dei not write in this apace
1. I(110 I\iokig(�ef PI -1 (P;z Afy>^ /pCj ,rye
3. of /0 v Addeaep }/I,0 Sl: V�]', 41 CityGor Po M 7Olt //GE2. Telephone JA
hereby Petition to amend the zoning ordinance of the Cipof iBangor, Neine by
reclassifying from G e to the
zone
the property outlined in red on the maps attached hereto,, watch ace Part *I this
application: and described as follows; qq /
B. ADDRESS OF PROPERTY (it any) �/— _� Cxc G� 67 ✓iun /
Total Area (scree or square test)
(14 zl�
4 PROPERTY LOCATION (General Description): Example - South side of State Street
400 yds. Beat of Pine Street.
5. LEGAL DESCRIPTION OF PROPERTY: Aeaessors-MeP No. ``5 d J parrot No. 3
METES and BOUNDE� - (Attach ��ajnn1 separate a[hJa�et)
6. PROPOSED USE: �41.%2u'dR. 1'2='4 2FJ fou;6G
>. NAME AND ADDRESS OP MM OF RECORD: Name
Address��
^^rr
e. NAME AND ADDRESS OF CUNTRACT OdNER -(if such):
9. SIGNATURE OF OWER OR CONTRACT WNEA:
AMRN FORM AND DUPLICATE TO PLANNING DEPARTMENP� CITY HALL. BANGOR. AAINE
Action for a toning change will be initiated with the Bangor City Coun,il and
referred to the Bangor Planning Board. Statutea require a Public Nearing before the
Planning Board, after a public advertising (at least 10 days prior to such public
hearing), for all changes to the toning Ordinance of the City of Bangor. The re-
anmendation of the Planning Bard is than returned to the Bangor City Council for
final action.