Loading...
HomeMy WebLinkAbout1979-12-26 55 AH ORDER55 no Introduced by Councilor Soucy, December 25, 1979 CITY OF BANGOR (TITLE.) (Prb" A99s)? tg Citg_Engineer's.Report Einal Cost of lozmn RRad.S.axaro..Sfouth_of_Interstate 1-95_.. ....... .......__ By lk City Council of e& MW OfBampor: ORDERED, TUT the attached Report of the City Engineer showing the final coats and recommended assessments for the installation of a sanitary sewer on Rogan Road south of Interstate I-95 be and hereby is accepted, and be it further ORDERED, that reimbursements be made to the property canners for the overpayment of estimated assessments as noted therein. .t 55 Go IN CITY COUNCIL O R D E R December 26, 1979 - v� bEC 19 P147 Title CITY OFf'a%IL. CITY r ncF. P. o,. C.py. myineerfa.aeport ,-,ri;�a1 CI IY C(ERMOG 'Coat of Hcgan Road Sewer. ScutlN of Interstate ...................................... . I-95. �, Introduced Ind f d by CITY OF BANGOR, MAINE Engineering Department December 18, 1979 To the MunicipalOfficers Reference is made to City Council Order No. 307 AF passed August 14, 1978 which authorized the installation of a sanitary sewer on Rogan Road between Penjajawoc Stream and Interstate Highway 1-95• All work has been completed, consisting of the following: A used pump station owned by the City was installed on the northeast aide of Hogan Road near Penjajawoc Stream, connected to the existing pump station on the EMVT1 property by 625 feet of.8 inch force main. 1,175 feet of 8 inch gravity sewer was installed in a northwesterly direction along Hogan Road toward the Interstate, with 5 manholes, to serve the properties on the northeast side of Hogan Road who had originally petitioned for the sewer. The total actual cost of the sewer installation was $34,496.009 substantially less than the original estimate of $51,500.00. The City's share is 50%9 or $17,248.00, with the remaining amount to be assessed against the frontage benefited, as follows: Totals: $171248.00 $25,750.00 $ 3,980.44 -1- Actual original Property Owner Frontage Cost Estimate Refund SOUTHWEST SIDE State of Plaine (non -assessable) 1574' $ 9,0E49.45 $137514.00 $ 0 NORTHEAST SIDE Edythe Dyer 120' 689.92 1,030.00 340.08 Chrysler corp. 250' 19437.33 21145.00 707.67 Suljan Corp., 376' 29161.75 35226.00 17064.25 John J. Davis (non -assessable) 20' 114.99 172.00 0 Webber Petroleum 460' 21644.69 31947.00 19302.31 Dexter Shoe 200' 1,149.87 1,716.00 566.13 Totals: $171248.00 $25,750.00 $ 3,980.44 -1- As noted above, the land owned b9 the State of Maine on the southwest side of Hogan Road, being EMVTI, is considered non -assessable, since it is already connected into another sewer for which it was previously assessed. In addition, a 20 foot right-of-way owned by John ➢avis would not benefit by the sewer installation and is considered non -assessable. All of the remaining property owners were required to preflmd their share of the cost, based upon the original estimated cost. Since the actual cost of the sewer was less than the original estimate, refunds to those property owners are due as noted above. Plane showing the actual sewer installation are on file in the Office of the City Engineer. -2- Respectfully submitted, �� John T. Frawley, City Engineer