HomeMy WebLinkAbout1980-04-14 143 AH ORDER143 At
Introduced by Councilor Brwntas, April 14, 1980
_ CITY OF BANGOR
(TITLE.) (]Dr*_,Accepting City. Engi¢eer's ,Report - Final Cost of
Extension on Third Street
By tAs City Coamil of W City ofBanw.
J1;70�1;1dp
TEAT the attached report of the City Engineer showing the
actual cost and recommended assessment for the extension of the
sanitary sewer on Third Street west of Cedar Street be and hereby
is accepted, and be it further _
OBDEREDs that the assessment be levied as noted therein
IN'CITY COUN&L
April 16i 1980
Passed
qa4agz
193 AR
ORDER
Title, .� ppp..y P258
accepeing city. ymgineeYs rse4ost,,,,
NEW ILI
- -0IQiV BANGOR
Final Cost of Sanitary Great nxtension
..... 1.4 .......................
on VKird Street.
I odacfed��f�.ndd ft dby e -
Councilmen
CITY OF BANGOR, MAINE
Engineering Department
April 39 1980
To the Municipal Officers:
Reference is made to City Council Order No. 34 AS passed
November 27, 1978, authorizing the extension of the sanitary
sewer on Third Street west of Cedar Street. All work has been
completed and the final costa determined, as follows:
The sewer extension consisted of the installation of 140
feet of 8 inch pipe extending in a westerly direction on Third
Street from the existing sewer at Cedar Street. The total
actual cost of the sewer installation was $1,994.769 which
compared favorably with the original estimate of $2,000.00.
Of that amount, 50% would be paid by the City of Bangor, and
the remaining amount would be assessed as follows:
North Side
Richard A. LaGrange $498.69
South Side
Non-assesaable (no benefit) 498.69
Total: $997.38
The south aide of Third Street is indicated as non -assessable
since that property is already connected into a sewer -,which lies
further to the south. Furthermore, that property is substantially
below the grade of Third Street so that future connection into
this Third Street sewer would not be possible. In accordance
with previous practice, and as recommended in the initial report
to the City Council, the City, would pay the non -assessable portion
of the sewer cost. It should be noted that Mr. LaGrange prepaid
Me estimated share of $500.00 for the sewer installation, and
would be due a refund on the balance.
A Plan showing the sewer installation is on file in the
Office of the City Engineer.
Respectfully submitted,
-�
John T. Frawley,
City Engineer