Loading...
HomeMy WebLinkAbout2016-09-12 16-336 ORDERCOUNCIL ACTION Item No. 16-336 Date: September 12, 2016 Item/Subject: ORDER, Authorizing Bid Award to ]M Brown General Contractor for Building 456 Fuel Containment Building Modifications Responsible Department: Airport Commentary: On August 31, 2016, the City received five (5) bids for modifications to BIA's fuel containment building 456. The bid prices ranged from $191,658 to $248,957 (see attached bid tabulation). Staff recommends awarding the contract to JM Brown General Contractor, the low bidder. Originally, the airport was working in phases to relocate the aircraft deice fluid tanks and equipment, and budget accordingly with minimal disruption to C&L and to our winter operations. However, through recent developments, the site determined to relocate the tanks and equipment has become available now. The scope of work needed to relocate the tanks/equipment and make modifications to an existing facility includes installing a heat system, installing overheads doors, running a water line, electrical upgrades and general building modifications. Previously, the Council authorized the use of Airport reserves to undertake this work. The bid prices exceed the estimated budget. Airport staff will work with the low bidder to reduce the scope of the work. This bid was reviewed and recommended for approval at the Finance Committee meeting of September 7, 2016. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. De ment Head Manager's Comments: Associated Information: Bid Tabulation Budget Approval: dakLa� Finance Director Legal Approval: (° cam, (\,A City Solicitor Introduced for X Passage First Reading Page _ of _ Referral 16-336 SEPTEMBER 12, 2016 Assigned to Councilor Mocjp;s CITY OF BANGOR (TITLE.) Order, Authorizing Bid Award to ]M Brown General Contractor for Building 456 Fuel Containment Building Modifications By tfhe City Coilndl of the aty of Bangor: THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with JM Brown General Contractor in the amount of $191,658 for modifications to BIA's fuel containment building 456. IN CITY COUNCIL. SEPTEMBER 12, 2016 CO- 16-336 PA SED CITY CLERK 16-336 SEPTEMBER 12, 2016 City of Bangor Bid Tabulation Bid: Bldg 456, Fuel Containment Building Modification Bid Opening: 8/31/16 The Sheridan Corporation Fairfield ME Peachey Builders Augusta, ME Ganneston Construction Corp. Augusta, ME Item Description Total Price Total Price Total Price 1 Modification of Existing Building $205,473 $193,987 $248,957 Warranty: 1 year 1 1 year 1 1 year Number of days to com tete: 1 60 days 1 42 days 1 90 calendar days Bowman Contructors Newport, ME JM Brown General Contractor Hermon ME Item I Description Total Price Total Price 1 Modification of Existing Building $215,500 $191,658 Warranty: 1 year 1 1 year Number of days to com tete: 1 90 days 1 12 working days