HomeMy WebLinkAbout2020-06-16 Infrastructure Committee Minutes
Infrastructure Committee
Minutes
June 16, 2020
ATTENDEES
Councilors: In Council Chamber: Gretchen Schaefer, Susan Hawes, Clare Davitt, Rick Fournier, Sarah
Nichols, Laura Supica, Dan Tremble, Ben Sprague
Staff: John Theriault, Eric Willett
AGENDA
1. Update: FY21 Paving Projects
John Theriault & Eric Willett outlined the Fiscal Year 21 Paving Program with a completion date (weather
dependent) of approximately November 1, 2020. Fourteen streets to be carried over from the FY20 Paving
Program, to be paved by approximately July 1, 2020.
Vote: No vote necessary, informational only.
2. MDOT Agreement: WIN #024623.00, Small Harbor Improvement Program (SHIP) Replacement of Docks at the
Bangor Waterfront
John Theriault outlined that the grant was for replacement of 30 year-old Docks 2 & 3 on Front Street, southerly
of Joshua Chamberlain Bridge. Along with dock replacement, gangways, still arms, electric power pedestals and
seasonal potable water would be included on each dock. Projected City cost $165,661.00, 50% of State funding.
Vote: Motion made and seconded, unanimously.
3. MDOT Agreement: WIN #024591.00, Pedestrian Safety Improvements Along Joshua Chamberlain Bridge
John outlined that the project was for ADA compliance and pedestrian safety along the Joshua Chamberlain
Bridge, starting at Summer Street, along Union Street to Short Street. City cost $12,163.00 or 20% of State
funding.
Vote: No Vote necessary, previously approved and passed.
4. Discussion: MDOT Penobscot Bridge Corridor Improvements, Bangor #023114.00 & Brewer WIN #023112.00
John stated this was for four signals in Bangor and two in Brewer. Public Works would maintain for both sides.
Bangor would draw up an agreement with Brewer for maintenance and their share of the costs. FY23 budget
item.
Vote: Motion made and seconded, unanimously.
Motioned made and seconded to adjourn.
1