Loading...
HomeMy WebLinkAbout2020-08-24 20-261 Order 08/24/202020-261 08/24/2020 20-261 Engineering Order 059-025 Title, Order Authorizing the City Manager to Sign a Drainage and Slope Easement to Access Property at 489 State Street to Replace an Existing Culvert Under State Street and Maintain an Existing Roadside Ditch. This Order would allow the City to replace and maintain an existing culvert under State Street at Woodlawn Brook and maintain an existing roadside ditch and culvert. Woodlawn Brook crosses under State Street at the base of a hill near Cascade Park. The existing 4'X4' concrete box is of unknown age and is beginning to fail. The culvert was last repaired in 2002 before State Street was paved. State Street is scheduled to be paved in 2021, and the culvert should be replaced prior to paving. The City has proposed to extend this culvert to allow for the steep slopes of the road to be lengthened for roadway stability, eliminate the need for an existing retaining wall, and to improve the alignment of the culvert with the existing stream flows. The southern end of the proposed culvert will extend onto private property at 489 State Street. This easement will also allow the City to maintain an existing roadside ditch and culvert along the southern side of State Street which is partially on private property. The ditch and culvert serve to drain State Street as well as a portion of the Quincy Parking Lot of Northern Light Eastern Maine Medical Center. The City will access the area to be repaired from the State Street right-of-way, and will restore the property when the work has been completed. Infrastructure Committee 08/18/2020 Recommend for passage Consent 08/24/202020-261 CITY OF BANGOR ORDER 08/24/2020 20-261 Tremble Authorizing the City Manager to Sign a Drainage and Slope Easement to Access Property at 489 State Street to Replace an Existing Culvert Under State Street and Maintain an Existing Roadside Ditch. WHEREAS, the culvert crossing State Street at Woodlawn Brook is failing, WHEREAS, State Street is scheduled to be paved in 2021, WHEREAS, stable side slopes require a longer culvert than is currently in place, WHEREAS, a longer culvert and longer road side slope will need to be installed on private property, WHEREAS, State Street drains to a ditch and culvert that is partially on private property, WHEREAS, said ditch and culvert will need maintenance from time to time, Be it Ordered by the City Council of the City of Bangor that, The City Manager is hereby authorized to execute an easement with the property owner at 489 State Street (M/L R059-025) to install and maintain a culvert on State Street at Woodlawn Brook. IN CITY COUNCIL AUGUST 24,2020 CO 20-261 Motion made and seconded for Passage of Consent Agenda Vote: 9—0 Councilors Voting Yes: Fournier,Hawes,Nichols, Okafor, Schaefer, Sprague, Supica,Tremble,Davitt Councilors Voting No: None Passed Cif V CLE