HomeMy WebLinkAbout1981-07-27 81-227 ORDERIntroduced by Councilor Soucy, duly 27, 1961
_ CITY OF BANGOR
(TITLE.) Plyrbtrr._Authoriming Replacement of„e, Portion o£„the MdWei4S
By dw CsW CouvoU of the City of Bangor.
ORDERED,
THAT WfEERREEAS, the Eastern Maine Medical Center is planning
the construction of a parking lot between State Street and the
entrance road to the Hospital, over a portion of the existing
Carr Brook Sewer, and
WHEEEAS, said parking lot construction will require the
placement of fill over said sewer to an additional depth of
approximately 12 feet, and
WHEREAS, the existing 36” sewer is constructed of brick,
is almost ninety years old, and may not have sufficient strength
to withstand the load of the additional fill,
NOW, THEBES ORE, be it
CRDERED, that the affected length of said sewer, amounting
to approximately 100 feet, be replaced with new pipe, the total
cost of said replacement estimated to be Six. Thousand Dollars
($6,000.00), and to be shared equally by the City of Bangor and
the Easters Maine Medical Center, and be it further
ORDEEED, thaf said work be accomplisbed upon receipt of the
Eastern Maine Medical Center's share of the cost of said replace-
ment.
STATEMENT OF FACT:
This sewer was originally to be replaced as part of the.
construction of the Penobscot East Interceptor Sewer Extension,
and the funds for replacement have already been appropriated by
the City; this project is not eligible for State or Federal
participation of cost. The scheduling of the work as part of
the Penobscot East Interceptor Sewer contract would delay com-
pletion of the parking lot by the EMMC.
81-22]
In City council July 27,1981 0 R E R
Passed'_.a6 22. F24
Title,
s.
Authoriziandg 8tP3aTerepta a6 a Potion COYLLERM
Git9 e[k ......................
Of the Ezfiring Carr Btook inner
Introduced. andCon