HomeMy WebLinkAbout1980-11-12 81-10 ORDER81-10
Introduced by Councilor naldacci,. xovem y 12,
1980
CITY OF BANGOR
(TITLE.) (ffirberr--Directing City Engineer to Make Cost Study -,,Hog= .
Road Sewer Extension to MarIt Home Aveale
By the City C00%W of the We of Reeser.
ORDERED,
THAT the attached petition from the Maine Department of
Transportation requesting a study to determine the coat of
extending the Hogan Road Sewer to the MDOT buildings at Mount
Hope Avenue be and hereby is accepted, and be it further
ORDERED, That the City Engineer conduct the necessary
surveys, -prepare Plans and Cost Estimates, together with a
list of possible assessments, and refer his findings to the
City Council for further action.
In b'ity
Council November 12,10 81-10
Passed
-
.0 R 0 E R
80
�V
—6
T ue
'City
i
tc?
01 u6 tiRTR er to .Make Coat
CIryC(ERn'.
Clerk
n r
C
y
++
-_ 9uu(}y HogevRoed to Mount Hope Ave.
r
r r
o ed, and led by �.
C ouncilmen
i
STATE OF MAINE e1-10
DEPARTMENT OF TRANSPORTATION
GEgYaE N UWaE1L Ananw I wcrose mwv iu WK m. Uu . Waam O'Mal
Oct. 23, 1980
Nr. Sohn Frawley
City Rngineer
city Hall
Sector, Maine 04401
Dear Sir;
Ibis is to request that a study be smae to determine the feasi—
bility of extending the Hogan Rd. sewer (shortly to be constructed to
"Village Schema) to serve the NeOTbuildings at 219 Rogan Rd.
Our present pooped sewage system to the Wt. Hope line fails Ore,
quently due to blown fuses and pump burnout. we suspect test over-
loading on the Nt. Hope line might be one of the causes.
We would appreciate any Consideration you could give us in this
matter.
Yours very truly,
�i^"G -
DFG/p$r David F. Gri eer
Division Eng
cc N.C. Rieael
W.J. mun