Loading...
HomeMy WebLinkAbout1982-10-13 82-257 ORDER82-257 Introduced by Councilor Willey, ectoeen 13, 1982 -CITY OF BANGOR QITLE.) &,Nfr, ABthozivi A9 ,City Manager to. Enter into. Agreement with MDOT - I 395 Bridge Project___,,,, By W City Cuuu¢ Of City ofBanw ORDERED, TBAT the City Manager be and hereby is authorised on beliai£ of the Municipal Officers to enter into the attached Agreement with the Maine Department of Transportation relative to the construction and future maintenance of the I-395 Extension project, as it relates to that portion of the project within the City o£ Bangor. i 82-257 In City Council Ocfber 13,1982 ORDER 'Yfq Xj -? Pt L•d Ronsjigd 1 rest eting¢lvdCammiff Cony�d iT meeting �� ,. AyfhPYl g n Manager QIYe - .Ci ger to anter CliY b_.h� ... .... into Agreement w ith MOOT 1-395 IY irk .•........... I............ Bridge Project -._ In C C L ciber 25, Intro n d filed by an 1982 Arn d ng by a lefing �;.. 7 �1\ Paragraph Ph II Sec. I Counc'lmen Passed as mnended n.PTY rk 82-25] Bangor I'-395 September 28, 1982 Page 1 of S Pages C I TY A C R E M E N T _ TILLS AGREEMENT, made this day of , 1982, by and between the State of Maine acting by and through its Department of Transportation, hereinafter referred to as the State and the City of Bangor; Penobscot County, a body corporate, by and through its City Manager hereinafter referred to as .the. City; Witnesseth, that WHEREAS , the State is planning the extension of Interstate 395 from Bangor into Brewer, and; WHEREAS, the Cityagrees such work is necessary; NOW. THEREFORE, the Parties agree as follows: 1. The State agrees to do the following: A. To award contracts as necessary under Federal Aid Project No. "I-395" hereinafter referred to as the Project, substantially in accordance with the plans prepared by the State in order to construct as 'a controlled access highway that portion of 11I-395" inBangor from the present terminus at Main Street to the Bangor -Brewer City Line. B. To add ramps at\Main Street to make it a fully directional interchange. C. - To construct a bridge over the Penobscot River. D. To construct a drainage system adequate to handle all normal .surface and sub -surface water for the entire Project, and to connect portionsof this drainage system into the existing systems, eliminating any drainage structures deemed unnecessary as part of the Project. Bangor 1.395 September 28, 1982 Page 2 of 5 Pages B. To acquire and pay for all land, rights in land, and buildings necessary to construct and maintain the Project. F. To provide traffic signals at the intersection of Main Street and.Farm Road and at the intersection of. Main. Street and the Connector from westbound off -ramp. G. To provide pavement markings and traffic control signs as necessary on a first-time basis. 1I. ANDtheCity agrees to do and perform the following: A. To approve the layout, controlled access, and construction of Federal Aid Project No. 1-395 described in Item I above under "the State agrees". B. To the terms set forth in the attached Special Provision, "Construction Area". C., To authorize the State to alter or eliminate any drainage or drainagestructures deemed unnecessary as part of the Project. D. To pay or assume any and all costs (if required) for the - treatment and. ultimate -disposal of any discharge from storm drainagesystems constructed as part of the Project. -E. To furnish, install, and assume all future maintenance an.1 powercosts for street lighting at a minimum average intensity of 0.2 foot candies at the ramp terminals on Main Street and Farm Road and at the intersection of Main Street and Farm Road. F. To agree to. the following in regard to traffir signals: 1. 'Assume all maintenance and power costs fortraffic signals and equipment installed or modified as part of the Project. . 2.. Expeditiously correct any deficiencies in the signal when ':required. Bangor I-395 September 28, 1982 Page 3.of 5 Pages 3. Preserve the visibility. of said signals causing any Impairment of visibility to be removed. 4. Make any signal or equipment which shall be removed or replaced in the future the property of the State, without cost AS the State. G. To 'pass such ordinances as may be required to prohibit parking at-thefollowing locations: On both sides of Main Street, from Dillingham Street to the road leading to "Bass Park", and on both sides of Farm Road; from Main Street westerly to the westerly right-of-way line of the Farm .Road off -ramp. H. To eliminate and prohibit disposal of any open sewage within .the Units of the Project. I- To make such changes within the City fire alarm system, City sewers, City water and City street lighting, including service connections, manhole adjustments and other City owned and maintained utility fixtures (if existing) without expense to the State as may be required as a result of the Project, except for those items compensable under Title 23, M.R.S.A. Sections 154.4 25$. Any changes made during the construction of the Project will be coordinated with the contractor's operations. J. To assume all, claims fot an ages to pr vdte�undergTound Stili E/ f tY-tYR rnstallat/i ns where the locations y no be Shown 'on the plans fo/i this Project also to lbres nsible for th removal, replacement, alterationorcation of any existing private underground utility -type installation (such Bangor I-395 September 29, 1982 ////// Page 4 of 5 Pages s res, star sewer, drain pi.(les) may %.necessary to pe//mit ns ction of. the Project within the previously de'scrl ed project limits. K. To be responsible for and to notify all utilities that, except in the case of any emergency, no service opening permits for opening any pavement within the limits of the proposed project will be issued for a period of five (5) years from the date of the Projeet. _ I. To regulate (where the control of utilities using the highways is: delegated to the City), the use by all public and private utilities of any portion of the right-of-way of the highway within the Project in accordance with the Maine Department of Transportation, Bureau of Highways, "Rules, Regulations and Policies-, HIGHWAY OPENING PERMITS", dated July 1, 1978. M. To .bold inviolate the right of way for the Project and agree that no advertisingsigns, posters, billboards, roadside s Cands or other private installation shall be permitted within the said right of way limits and any such beforementioned items now within the limits of the existing right of way shall be removed by or under directionof the City. N. To make the attached "Backfilling Requirements" a pert of all service opening permits for work within the limits of the . Proj att. Aettch: "Rackfiiling Requirements^ - Special Provision . Construction Area" Bangor 1-395 September 28, 1982 Page Sof 5 Pages IN WITNESS WHEREOF THE PARTIES TO THIS AGREEMENT HAVE EXECUTED IN TRIPLICATE. these presents on the day and year first above written,, the State of Maine by its Commissioner of the Department of Transportation, hereunto duly authorized, and theCityof Bangor by its City Manager duly authorized by Council -Order datedan attested true copy being attached hereto and made a part hereof. _ SIGNED, SEALED AND DELIVERED STATE OF MAINE' IN THE PRESENCE OF: DEPARTMENT OF TRANSPORTATION By: George N. Cample,r. Commissioner CITY OF BANGOR By To ynn, an ager APPROVED AS TO FORM: .D.O.T. -Chief Counse ate BACKFILLING REQUIREMENTS Backfill material shall be fine, readily compressible soil or granular material, at or near optimum moisture content, and shali not contain stones larger thatn 3 inches, frozen lumps, chunks or -clay, mineral matter or any other objectionable material. The material shall be uniformly distributed in layers of not more than 8 inches, loose measure and each layer throughly compacted by use e of approved compaction before successive layers are placed. When backfill is being placed around apipe or structure, ,operations shall be so conducted that the £111 is always at approximately the same elevation on both sides of the structure. Water shall be added when necessary to increase the moisture content of the backfill material to obtain compaction. Puddling orjettingof backfill will not be allowed. All sheeting and bracing used during excavation shall be removed by the utility following the completion of the work, and all voids resulting from the use of the sheeting and bracing backfilled where necessary unless otherwise directed by the Department's Engineer. Banger -Brewer SPECIAL PROVISION 1-395 _ OBSTRUCTION AREA A Construction Area, located in the C>ty of Bangor has been established by the Mine State lapartment of Transportation in accordance with the provisions of Title 29, Section 1103, Mine Revised Statutes Annotated. The area is described as follows: (a) The section of highway under construction from St2.162+96.81tc Sts. 330+12.21 of the new construction centerline, plus approaches. (b) State Highway 595 (Rte. 1-395 ) from Sta. 142+96.81 to Sta.330+12.21 of the new construction centerline, plus approaches. The State Department of Transportation or the State's Engineer may issue permits for stated periods of time for moving construction equipment without loads, low -bed trailers with overloads,over-height, over -width or over -length equipment or materials over all State maintained sections described in the "Construction Area" above and i addition may issue Permits for stated periods of time for moving over -might vehicles and loads over the section described in (a) above. The right to revoke such a permit At any time is reserved by the State Department of Transportation and the issuance of such permits shall be subject to any Special Provisions or Supplemental_ Specifications written for this project. A Temporary Permit for each move may be issued by the State pepartment of Transporta- tion or the State's Engineer, for moving Contractor's construction equipment used on to project, whichx ceeds the legal limits (shovels, bulldozers, etc.) to sources of construction notarialover highways maintained by the State reasonably within the area of the project. The Abnicipl Officers of the city of Banger have agreed that a permit will be issued to the Contractor for the purpose of hauling loads in excess of the lim- its as specified in Title 29, Mine Revised Statutes Annotated, on the town ways as -de- scribed in the "Construction Area" and that single move permits will be issued for moving Contractor's construction equipment used on the project which exceeds the legal' limits (shovels, bulldozers, etc.) to sources of construction asterisk over town ways reasonably within the area of the project. In the event it is necessary to transport gravel, borrow or other construction material n legally registered vehicles carrying legal loads over. town ways, a Contractor's gond of not more than Five Thousand Dallar 45,000.00) per mile of traveled length may be required by .the town, the exact amount of said bond to be determined prior to use of any town way. Vie maximum speed limits for trucks on any town way will he twenty-five (25) miles per hour, unless a higher legal limit is specifically agreed upon, in writing, by the Mnmipal Officers concerned. - 1-395 Dxewea -S 395 \\\\\\ fit• � _ DeGDNn state lsiaw gy ed we and Dr aeewithin a within the Conativation Area