Loading...
HomeMy WebLinkAbout1982-10-13 82-256 ORDER62-256 Introduced by Councilor Willey, Cctaber 13, 1982 ,5p _ CITY OF BANGOR (TITLE) 0Dr[aer, .I?irecting Pity. Engineer to Undertake Coat Study. - Penjag ewoe Sewer Eztaneion� Westerly of Stillwater Avenue __.. BY tlw CRY Cnowil oftim City ofBana c ORDERED, THAT the attached petition from Civil Engineering Services, an behalf of Carl Snow, requesting astudy to determine the cost of extending. the Penjajawoc Sanitary Sewer to serve property located on Stillwater Avenue approalmately 600 feet west of said Penjajawoc Stream, be and hereby is accepted, and be it further ORDERED, MT the City Engineer perform the necessary surveys., prepare Plans and Cost Estimates, together with a list of possible assess- ments for said sewer extension, and report his findings to the City Council for further action. In City Council 'October 13,1982 Councilor Zendzian Abstained. pp Passed 0lPiri99SSl!.. ; xd ��.. Tine, D itv C k f.¢S1iR9.G11,k.E PB LRYYl..S 9. y.Rderf ak e. C/lY trCfi,,, Cost.SfudY Pe n l aja�woc sewer Exfe ns ion ......: ................................ - Wes}er lY of Stillwater Avenue nd filed by - i � Councilme 82-256 f' S CIVIL ENGINEERING SERVICES 809 WILSON STGEET VVEWEO, MAIN[ 04119 October 4, 1982 Mr. John Frawley, P.E. City Engineer City Hall Bangor, Maine 04401 Subject: Stillwater Office Complex Dear John: The purpose of this letter is to request a review by the City of the extension of its sewer along Penjejawock Stream to the proposed Stillwater Professional Office Complex.. Attached, please find photo copies of the proposed site and of the adjacent area. These define thelocationof the site and approximate abutting property locations. The proposal at this time call for 1 - 2400 square foot professional office buildings. It is our understanding that there is no charge for the City's work at this time; however, the cost will become part of the total project cost to be recovered from sewer abutters once the sewer is installed. If additional information is necessary from our office at this time, do not hesitate to contact me. JWP/sw Ver truly mes N. Parker, ,P.E. roject Manager TELEONONE 207�69NS24