HomeMy WebLinkAbout1982-06-14 82-160 ORDERIntroduced by Councilor Jordan, June 14, 1982
CITY OF BANGOR
(TITLE) (Orbs, Authorizing the"Extension of the Penjajawoc Newer,__
492 Feet North Prom Bas or Mall Boulevard
BY t/u City Caunaid of Me (ilty ofBanyor.
ORDERED,
THAT the attached report of the City Engineer showing the
estimated cost and recommended assessments for the extension of
the sanitary sewer for a distance of 492 feet north from Bangor
Mall Boulevard be and hereby is accepted, and be it further
ORDERED,.
THAT construction of said sewer extension begin as soon
as possible, and be it further
ORDERED,
THAT the sum of Hine Thousand Two Hundred Dollars ($9,200.00)
be transferred from the Reserve for Future Construction - Newer
Account to cover the City's share of the proposed sewer extension.
In City Council Tune 14,1982
passed as amended
Amended in the 2nd paragraph,
By deleting the ward possible
And add the .words thedevelopers
share is receivel after the words
as soon as I I
62-160
ORDER
Title,
A�thorieiny the E%tension o.f. Ne Feng? j wars
Sewer 492 Feet worth from Bangor Mall
...................................
Boulevard
Fnt oduced and filed by
G/J/ Coonci
CITY OF BANGOR, MAINE
Engineering Department
June 10, 1982
To the Municipal Officers:
Reference is made to City Council Order No. 82-127 passed
April 26, 1982, directing the City Engineer to make a study to
determine the cost of extending the existing sanitary sewer
approximately 500 feet north from Bangor Mall Boulevard along
Penjejawoc Stream. Said study was initiated as a result of a
petition received from Stephen Begged, who plans to construct
s restaurant in the area between Bangor Mall Boulevard and
Stillwater Avenue, thus requiring the sewer extension.
Surveys, Plans and Cost Estimates have been completed,
which would indicate the following: The proposed extension
would consist of the installation of 492 feet of 10 inch pipe
and 2 manholes, commencing at the existing sewer on Bangor Mall
Boulevard, and extending north along Penjejawoc Stream toward
StillwaterAvenue.
The total estimated cost of the sewer installation is
$169920.00. A 10 inch sewer is required, since this line will
serve as a future collector for the Stillwater Avenue area.
In accordance with previous practice, the assessments would be
based upon a normal 8-inc2o sewer, since the additional size is
not required by the Petitioner. Since the difference in cost
between an 8 inch pipe and a 10 inch pipe is $3.00 per foot,
then the total adjusted cost for determining. a fair assessment
would be $15,440.00. Of this amount, the City would pay 50%,
and the remaining $`),720.00 would be assessed against the
property benefited, being the land owned by the Petitioner,
Stephen Nagger.
Since the sewer is necessary to permit the construction
of the proposed restaurant, and since it is anticipated that
sewer service will soon be required along Stillwater Avenue,
it is recommended that the sewer be installed as described
above.
A Plan showing the proposed sewer installation is on file
in the Office of the City Engineer.
Respectfully submitted,
J Frawley,
City Engineer