Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2020-01-27 20-062 Order
01/27/202020-062
01/27/2020
20-062
Community Connector
Order
N/A
Title, Order
Authorizing the Planning and Construction of a Transit Hub to be Located in Pickering Square
This order would authorize staff to take the necessary actions to plan and construct a bus hub in
Pickering Square in conjunction with plans for redevelopment of the bridge and open space portion
of Pickering.
Independent transit studies, conducted in 2014 and 2019, recommended the area at Pickering
Square for the continued location for the transit hub. In June of 2019 the Parking Garage located at
Pickering Square underwent modifications resulting in the demolition of an existing waiting area for
bus passengers. The city subsequently applied for and was successful in receiving $1.286 million
dollars to construct a new transit hub. If approved, the planning and construction would take place
in conjunction with other planned improvements to Pickering including providing better pedestrian
accommodations and contiguous open space.
The design concept for the hub was recently discussed at Council Workshops on December 30, 2019
and January 13, 2020. These discussions included an overview of the design as well as a recap of
previous discussions for alternative placement of the transit hub, dating back to 2016.
Council Workshop
01/13/2020
Recommend for passage
54
Consent
01/27/202020-062
CITY OF BANGOR ORDER
01/27/2020
20-062
Nichols
Authorizing the Planning and Construction of a Transit Hub to be Located in Pickering Square
Whereas; the City of Bangor operates bus services connecting multiple communities in the area, and
Whereas; two independent transit studies have been completed, recommending the area at Pickering Square
be utilized as a transit hub, and
Whereas; the existing waiting area for bus passengers at Pickering Square have been demolished during
recent upgrades to the Parking Garage, and
Whereas; the city applied for and was successful in receiving $1.286 million in grant funds, through the
Federal Transit Authority, to construct a new transit hub, and
Whereas; staff has created a concept design allowing for a transit hub and more square footage of useful
green space at Pickering Square.
Be it Ordered by the City Council of the City of Bangor that, the City Manager is authorized to complete the
planning stages and construction of a transit hub located at Pickering Square.
IN CITY COUNCIL
JANUARY 27,2020
CO 20-062
MOTION MADE AND SECONDED FOR PASSAGE
DOUBTED
VOTE: 5-4
COUNCILORS VOTING YES: NICHOLS, OKAFOR, SCHAEFER, SUPICA, DAVITT
COUNCILORS VOTING NO: FOURNIER, HAWES, SPRAGUE, TREMBLE
PASSED
1-4
CI tLERX