HomeMy WebLinkAbout1983-07-11 83-263 ORDER83-263 Introduced by Councilor Willey, slily 11, 19M CITY OF BANGOR (T)P.f.) NYritr,.._Accepting, City.Engineer' s _Report - Estimated Cost. of Street and Sewer Construction, Stillwater professional Park By ale Oily Council of de City of Bunsen ORDERED, TEAT the attached report of the City Engineer showing the estimated costs and recgmmended assessments for the construction of a commercial roadway extending approximately 600 feet north of Stillwater Avenue, and a sanitary sewer, be and hereby is accepted, and be it further ORDERED, THAT the construction of said road and sewer be undertaken upon receipt of the Developer's share of the estimated project cost, and be it illrthet OR➢EAID, THAT the sum of Fourteen Thousand Dollars ($14,000.00) be transferred from Account No. 92-2235, General Reserve Account, to cover the City's share of the roadway cost, and the am of Seven Thousand Dollars (97,000.00) be transferred from Account No. 92-2236, Sewer Reserve Account, to cover the City's share of the sanitary sewer construction. In CS&Y Council July 11,1983 Passed - 0 R 63 R y Title, i AVCAJr.v� CI`:' i Ci Y Clark A al CSt , t.. CITY t:..i r... Estimated cost of Stmet and Sewer _........................:............. constxvctlon,3tillxatar Professional Park Introduced and filed by :iV.-�.... .. .. .. cnnneam c CITY OF BANGOR, MAIMS Engineering Department July 61 1983 To the Municipal Officers: Reference is made to City Council Order No. 83-91 passed February 14, 1983 directing the City Engineer to undertake a cost stud7 for the construction of a commercial subdivision street and sanitary sewer for the proposed Stillwater Professional Park Subdivision on Stillwater Avenue, as petitioned for by Stillwater Professional Office Complex Associates. Plans and Cost Estimates have been prepared, which would provide for the following: The roadway would extend in a northerly direction for a distance of approximately 600 feet to a cul-de-sac, end would have a travel way width of 30 feet, consisting of 3 iaobes of bituminous concrete surface on an 18 inch gravel base. All of the areas disturbed by the construction will be loamed and seeded. Two catch basins will be placed near the northerly and, with a 10 inch culvert outlet pipe. The sanitary sewer would include the installation of 440 feet of 8 inch pipe and 2 manholes, to be connected into a proposed 8 inch sanitary sewer on Stillwater Avenue previously authorized for construction by the City Council. The total estimated cost of the roadway construction is $27,400.00, of which fifty percent would be paid by the City, and the remaining $13,700.00 would be assessed against the Developer. The total estimated cost of the sanitary sewer installation is $13,800.00, fifty percent of which would be paid by the City and the remaining $6,900.00 would bepaid by the Developer. Thus, the total project cost is $41,200.00. with $20,600.00 to be paid by the Developer, and an equal amount by the City. The Developer has been advised that receipt of hie share of the cost will be required prior to the advertising for bide for construction. It is anticipated that the preparation of bid documents, advertising for bids, and construction will take approximately 90 days. The Developer has indicated that he is in favor of the project as described above. It is recommended that the necessary funds be appropriated, and that construction begin as soon as possible. Plans showing the proposed street and sewer construction are on file in the Office of the City Engineer. Respectfully submitted, John T. Frawley, City Engineer