Loading...
HomeMy WebLinkAbout2019-05-29 19-218 Order 05/29/201919-218 05/29/2019 19-218 Engineering Order R14-012 Title, Order Authorizing the City Manager to Sign an Easement to Construct and Maintain Stormwater Structures at 1423 Ohio Street to Improve Water Quality in Capehart Brook This Order would authorize the City Manager to execute a permanent easement for the construction and maintenance of stormwater structures at 1423 Ohio Street. As part of a Maine Department of Environmental Protection grant project for Capehart Brook, the the City plans to install an underground stormwater retention system on property located at 1423 Ohio Street which will treat stormwater from the parking lot and parts of the building roof. This system will reduce pollutants and reduce erosive flows in Capehart Brook. To complete this project the City will need continual access to the property for maintenance of the system. If approved, the City Manager is authorized to execute an easement to the property for construction and maintenance. Infrastructure Committee 05/21/2019 Recommend for passage Consent 05/29/201919-218 CITY OF BANGOR ORDER 05/29/2019 19-218 Tremble Authorizing the City Manager to Sign an Easement to Construct and Maintain Stormwater Structures at 1423 Ohio Street to Improve Water Quality in Capehart Brook WHEREAS, Capehart Brook is listed as an urban impaired stream by the Maine Department of Environmental Protection; and WHEREAS, the City is tasked with restoration of Capehart Brook and other Urban Impaired Streams in Bangor, WHEREAS, this project is described in the Capehart Brook Watershed Management Plan and will contribute to restoration of the Brook, WHEREAS, the City needs to access private property to complete the project, Be it Ordered by the City Council of the City of Bangor that, The City Manager is hereby authorized to execute an easement for stormwater structure construction and maintenance at 1423 Ohio St (M/L R14-012). CD iii HH O 2 !ttti 1/40 I1/4D H r ` OrC Ni'. i H 00 N C0 o 0 ` c 2 H r