HomeMy WebLinkAbout2019-05-29 19-218 Order
05/29/201919-218
05/29/2019
19-218
Engineering
Order
R14-012
Title, Order
Authorizing the City Manager to Sign an Easement to Construct and Maintain Stormwater Structures at 1423
Ohio Street to Improve Water Quality in Capehart Brook
This Order would authorize the City Manager to execute a permanent easement for the construction
and maintenance of stormwater structures at 1423 Ohio Street.
As part of a Maine Department of Environmental Protection grant project for Capehart Brook, the
the City plans to install an underground stormwater retention system on property located at 1423
Ohio Street which will treat stormwater from the parking lot and parts of the building roof. This
system will reduce pollutants and reduce erosive flows in Capehart Brook. To complete this project
the City will need continual access to the property for maintenance of the system. If approved, the
City Manager is authorized to execute an easement to the property for construction and
maintenance.
Infrastructure Committee
05/21/2019
Recommend for passage
Consent
05/29/201919-218
CITY OF BANGOR ORDER
05/29/2019
19-218
Tremble
Authorizing the City Manager to Sign an Easement to Construct and Maintain Stormwater Structures at 1423
Ohio Street to Improve Water Quality in Capehart Brook
WHEREAS, Capehart Brook is listed as an urban impaired stream by the Maine Department of Environmental
Protection; and
WHEREAS, the City is tasked with restoration of Capehart Brook and other Urban Impaired Streams in Bangor,
WHEREAS, this project is described in the Capehart Brook Watershed Management Plan and will contribute to
restoration of the Brook,
WHEREAS, the City needs to access private property to complete the project,
Be it Ordered by the City Council of the City of Bangor that,
The City Manager is hereby authorized to execute an easement for stormwater structure construction and
maintenance at 1423 Ohio St (M/L R14-012).
CD iii
HH O 2
!ttti 1/40 I1/4D H
r ` OrC
Ni'.
i H
00 N C0
o 0
` c 2
H
r