HomeMy WebLinkAbout1983-02-28 83-106 ORDER83-106
Introduced by Councilor Cox, Pebzuary 28, 1983
_mp CITY OF BANGOR
(TITLE.) of
Sanitary Bever on State Street
By to City Cama! Of Ike pry Of Reeser:
ORDERED,
TRAIT the attached report of the City Engineer showing the
estimated cost and recommended assessments for the extension of
the sanitary sewer on State Street toward Hogan Road be and bereby
is accepted, and be it further
CRDEME ,
TEAT said construction be completed as soon as possible,
with the funding of the City's share to be charged to Capital
Account No. 52-60-20 (5147), Penobscot East Interceptor Sewer.
STATEMENT OF FACT:
A portion of this sewer extending across State Street was
installed as part of the Penobscot East Interceptor Sewer project.
The remaining portion is a lateral sewer to serve a portion of the
frontage north of Hogan Road.
In City Council February 28,1983
Passed
civ clerk
LJ
{
83-106 !
0RbER
Title, ,
AccegtSr� City Engineer s Report
£atenefon of SaAtdry Sewer 5n State St.
'Introduoil co ilea .
oep
u
ti
v
Lj
y
V
CITY OF BANGOR, MAINE
Engineering Department
February 24, 1983
To the Municipal Officers:
Reference is made to City Council Order No. 83-45 passed
December 13, 1982 authorizing the City Engineer to undertake a
study to determine the cost and recommended assessments for the
extension of the sanitary sewer on State Street toward Hogan
Road. Plans and Coat Estimates have been completed, which would
provide for the following:
The proposed extension would consist of the installation of
310 feet of S inch pipe and 1 manhole,at a total cost of $6,000.
In addition, an 8 inch sewer connection under State Street to the
Penobscot East Interceptor Sewer has already been completed as part
of the Interceptor Sewer construction at a cost of $3,330., which
would make a total coat of $9,330. for extending the sewer service.
Of this amount, the City would pay fifty percent, and the remaining
$4,665• would be assessed as follows:
property Omer Frontage Assessment; Response
NORTH SIDE
Forrest H. Grant
778 State Street. 165' $ 672.25 In Favor
Dr. Vence A. Aloupis
792 State Street 148.5' 605.02 In Favor
Thelma M. Clukeeyy
800 state Street 66' 268.90
(Non -assessable)
D & J Corporation
810 State Street 193' 786.33 In Favor
SOUTH SIDE
City of Bangor and
Maine Central Railroad 572.5' 21332.50
(Hon -assessable) -
Total $49665.00
The property of Thelma M. Clukey is considered to be non -
assessable, since she already has a direct private connection
into the Interceptor Sewer.
-1-
It is recommended that the sewer be constructed as soon as
weather conditions permit, and upon receipt of payment of the
estimated assessment from each of the property owners.
Flans showing the proposed sewer installation are an file
in the Office of the City Engineer.
Respectfully s�ub\mitted,
John T. Frewle
City Engineer