Authorizing Execution of Agreement for Maine Department of Transportation Municipal Partnership Agreement
- WIN 21932.09 Broadway (Route 15B)
This order will authorize the City Manager to execute a Municipal Partnership Agreement with the
Maine Department of Transportation for a mill and fill project consisting of a two inch mill and
overlay of existing pavement, resetting of granite curb where necessary to restore curb reveal, and
pedestrian facility and drainage improvements on Broadway, beginning at the intersection of State
Street and extending northerly 0.64 miles to Stillwater Avenue.
The estimated project cost is $950,435.00. The project is a 50/50 project with MaineDOT Municipal
Partnership Initiative funds not to exceed $475,217.50 and the City's contribution of $475,217.50.
Infrastructure Committee
04/16/2019
Recommend for passage
50
Consent
04/22/201919-161
CITY OF BANGOR ORDER
04/22/2019
19-161
Tremble
Authorizing Execution of Agreement for Maine Department of Transportation Municipal Partnership Agreement
- WIN 21932.09 Broadway (Route 15B)
Be it Ordered by the City Council of the City of Bangor that,
The City Manager is hereby authorized and directed to execute an agreement with Maine Department of
Transportation for a Municipal Partnership Agreement for WIN 21932.09 Broadway (Route 15B) Mill and Fill
Project.
19-161
APRIL 22, 2019
Internal Use Only
TEDOCS #:
CTM#:
CSN#:
STATE OF MAINE DEPARTMENT OF TRANSPORTATION
MUNICIPAL PARTNERSHIP AGREEMENT
WIN 21932.09
REGARDING
BANGOR, BROADWAY (ROUTE 15B)
This Cooperative Agreement (AGREEMENT) is entered into by and between the MAINE
DEPARTMENT OF TRANSPORTATION ("MaineDOT" ), an agency of state government with its
principal administrative offices located on Child Street, Augusta, Maine, and the CITY OF BANGOR
("MUNICIPALITY"), a municipality in the State of Maine with offices located at 73 Harlow Street,
BANGOR, ME.
WHEREAS,
BANGOR shall perform a mill and fill project consisting of a 2 -inch mill and overlay of existing
pavement, resetting of granite curb where necessary to restore curb reveal, and pedestrian facility and
drainage improvements on Broadway, beginning at the intersection of State Street and extending
northerly 0.64 miles to Stillwater Avenue (the "Project"). BANGOR estimates this project at
$950,435.00.
BANGOR SHALL:
A. Procure all contracts for and oversee the Project on BROADWAY (ROUTE 15B) for the
Work outlined above.
B. Cause such Work to be performed in accordance with a design by an engineer licensed in the
State of Maine. The Licensed Engineer shall provide a certification to the Municipality and to
MaineDOT that, in his/her professional opinion, the Project as designed will provide a smooth
ride, not reduce the safety, mobility or structural quality of the state [state aid] road. All design
documents must be stamped and signed in accordance with this provision by the Professional
Engineer.
C. Agree to secure all necessary Federal, State and Local permits necessary to complete the work.
BANGOR also agrees to secure any needed property rights in accordance with all applicable
State and Federal Law.
D. Agree that any exceptions to State Design Standards shall be documented as part of this
process. This documentation shall compare the new design to the existing conditions for each
of the exceptions to current design standards. Any such exceptions shall be displayed on the
cover sheet for the Project plans with the signature and PE stamp of the engineer responsible
for the design of the Project.
E. Be responsible, within the Project limits, for the following:
Rev. 11/14/2018
a. Ensuring that the safety of the corridor and the life of the resulting structural and design
elements are equal to or better than existing conditions and design;
b. Ensuring that the structures, roadways and/or design features affected by the Project
work shall, at a minimum, be of improved quality in terms of materials and utility;
c. Ensuring that the Project does not introduce safety hazards;
d. Ensuring that the Project retains the same level of mobility or improves mobility of
travel within the corridor, unless approved traffic calming measures are proposed;
e. Ensuring that the Project does not decrease the life expectancy of this component of
Maine's transportation system; and,
f. Ensuring that the Project meets the current standards of Americans with Disabilities Act
of 1990 (ADA) design requirements.
F. Provide certification through their Engineer to MaineDOT that the Project is complete and was
constructed as designed.
G. Ensure that construction shall commence within EIGHTEEN (18) months and shall be certified
complete within THIRTY-SIX (36) months of execution of this agreement. BANGOR may
forfeit the unpaid balance of this grant if these deadlines are not met or they can not
demonstrate earnest and good faith efforts to meet them.
H. Be responsible for or cause its contractors to be responsible for all damage to public or private
property of any kind resulting from any act, omission, neglect or misconduct of BANGOR or
its contractors, including damage to vehicles passing through the Project limits.
I. Bear all risk of loss relating to the Project and the Work regardless of cause.
MAINEDOT SHALL:
A. Provide a maximum $475,217.50 in State funds supporting the Work stated above.
Reimbursement will be made by the Department at a minimum of 1/3 project completion upon
receipt of supporting cost documentation from the Municipality. Payments will be made per
Appendix A attached. The Department's Region Engineer shall review the costs and certify
their eligibility prior to reimbursement of Municipal Partnership Initiative Funds. Payment by
MaineDOT Municipal Partnership Initiative funds shall not exceed $475,217.50 or 50% of the
actual costs incurred and paid by the Municipality.
B. This project has been approved for Calendar Year 2020. If the Municipality commences
construction of the project as outlined above prior to January 1, 2020, the Municipality assumes
the risk and responsibility for costs incurred, in the event that funding levels fall below
MaineDOT projections. If this occurs, the Municipality will not receive reimbursement from
MaineDOT.
Rev. 11/14/2018
The CITY OF BANGOR and MaineDOT agree to function within all applicable laws, statutes,
regulations, and AGREEMENT provisions; avoid hindering each other's performance; fulfill all
obligations diligently; and cooperate in achievement of the intent of this AGREEMENT.
IN WITNESS, WHEREOF, the parties hereto have executed this AGREEMENT effective on the day
and date last signed.
Dated:
Dated:
Rev. 11/14/2018
LM
CITY OF BANGOR
Catherine M. Conlow
City Manager
STATE OF MAINE
DEPARTMENT OF TRANSPORTATION
Bruce Van Note
Commissioner
APPENDIX A
PROJECT SCOPE AND COST SHARING
MAINE DEPARTMENT OF TRANSPORTATION
Municipal Partnership Initiative Project
MUNICIPALITY OF AVL . C[IIlt
PROPOSED IMPROVEMENTS TO: BROADWAY
STATE PROJECT IDENTIFICATION NUMBER (WIN) _21932.09_
FUNDED CONSTRUCTION YEAR 2020
Proiect Scope: 2 inch mill and overlay
Funding Outline: The Total Project Estimated Cost is $950,435.00, and the Parties agree to share costs through all stages of the Project under the
terms outlined below.
Municipal Share
State Share
Total Cost
Work Element
% $
% $
$
Project Costs
50 0
475.21T50
50 O
475,21T5
950,435.(
PROJECT SHARES
Total Cost of Additional
100%
Work above agreement
estimate
TOTAL ESTIMATED
MUNICIPAL
$475,217.50
REIMBURSEMENT
REIMBURSEMENT SCHEDULE:
Upon 1/3 project completion the municipality may begin invoicing the Department. Preferred invoicing interval is 1/3, 2/3, final. The Department
will accept monthly invoices after 1/3 project completion with a maximum invoice submittal not to exceed 5 invoices.
DESIGN EXCEPTIONS REQUIRED: YES X NO
Design exceptions where required for this project. Please see attached approval from MaineDOT Chief Engineer outlining design exceptions.
H a0 odd 2
�A 0 �O H
C1 z ,! N
t E -N
l tri 0
y - n
1 d \O H
0
d
0
G-)