HomeMy WebLinkAbout1983-02-14 83-82 ORDER83-82
Introduced by Councilor brown, February 14, 1993
CITY OF BANGOR
(TITLE.) Orbtr, Aepla< kzon_Eea at 1 ty x.opa t parmlt -... spag tqa:q-
By eke aty Cattsmi of W air ofBanyor:
ORDERED,
T"T the attached application for utility location peruut is 'hareby
grant l upon coMition Mat h e pole be numbered.
NOTE: Following are the pahlic streets and highways referrl to:
Pinna: aced (Inv. 619) from"appro:iaetely 19M feet
northerly of the junction of Ohio Street, northerly -1 pole
No public notice of this application to be made.
In City Coanoil February 14,1983
Paeeed
4Ci y clerk
83-82
0 ROE R.
Title,
Ayyllcation PorUtility Location Permit
Bangor i(ydro Electric Company
Introducedand �filed by
...................
Councilman
IN IVB= r1 o,�
CI CI�T'f Ule CITY CLL,,.
83-82
• •F AIE P
33 Slate Street P.O. Box 932,8eigar{Hulse 04401 Tal. 20T-8455821
January 26, 1983
Mr. Russell MoKe not
City Clerk - -
Bangor, Maine
73 Carlon Street
Bangor, gains 04401
Bear Mr. McKenna:
Enclosed are our application and pale permit forme for locations
in Bangor.
Cline approved by a majority of the municipal officers or by
aw authorized representative, please
return chose forma marked "BRE
COPY", to the return address noted below, signed and dated with the
recording data, and attested by the Clerk.
Very try yours,
P1A
R. L. Averill
Vranumission and Distribution
Job Coordinator
RETURN ADDRESS AS POLIZeS:
R. L. Averill
T d B Job Coordinator
Bangor Hydro -Electric Compury,
P. 0. Box 932
Bangor, Maine, 04401
RIA:gc
Encl.
UTILITY LOCATION PERHIT
Upon the applicationofBANGOR HYDRtrELRCTRIC CWANY dated January 26, 1983,
requesting permadission to locate certain of its facilities hereinafter described upon along,
over s
and a certain public ways in the City of Bangor , County of Penobscot
State of Haloall as set forth in in application, no newspaper publication having been
made by applicant in connection with said application.Permission is hereby given to said
Bangor Hydro -Electric Company to locate, construct and maintain certain of its facilities
hereinafter described upon, along, o and a certain public ways situate In said
municipality as hereinafter set forth. s Afe permit is granted subject to the provisions
that any person, firm or corporation owning property within the subject municipality which
abuts the applicable way may file objections with the Clerk of the City of Bangor
gains, within ninety (90) days after the installation of the facilities described in said
application, said written objection to state the cause of objection and to be served upon
said Bangor Hydro -Electric Company in hand or by registered or certified well.
LOCATION:
PINBON 8040 (Inv, 619) from approximately 1984 feet
northerly of the junction of Ohio Street, northerly -
One pale.
DESCRIPTION:
The facilities shall consist of a line composed of wood poles and supporta therefor,
crossarms,
wires and/or cables, together with associated appurtenances. The mini -am
sov
clea of the wires and/or cables, other than guy Wires, shall be at least eighteen (18)
feet over the public way. The poles shall be set within the limits of the While way, but
Outside the part thereof customarity used for travel by vehicles. The initial operation
of the facilities will be at 7200/12420 volts three phase. The voltage may be
increased as occasion therefor requires for operation not in excess of 20KV to ground.
Received and Recorded in �a-..-�� � �
Book�� sage 89 Dated
D.tea t Maine
1�9 .. Zola,7 Day , 19�
Atte.
APPLIGTION FOR UTILITY LOGTION PERMIT
i'O: COUNCILMEN - CITY OF BANGOR
BANGOR HYDRO -ELECTRIC CCMPA , a Maine corporation being duly authorized
pursuant to thtiitatT Sfnyaine to generate, sell, distribute Peno�s�iotiy electri-
city in y argot , County of
State aforesaid, hereby applies for a permit to authorize it to locate,nstruct
and maintain certain of its facilities hereinafter described upon, along,
and across certain public ways situate to the municipality hereinbefore referred
to (no public notice of this application to be made),
in accordance with the terms and conditions of Title 35, Section 2482, MRSA as
amended.
LOCATION:
Pinson Road (Inv. 619) from approximately
1984 feet northerly of the junction of Ohio St.,
northerly - one pole.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and support '
therefor, -errens, wires and/or cables together with associated appurtenances.
Me minin,mclearance of the wires and/or Cables, other than guy wires, will be at
least eighteen feet ever the public way. Me poles will be set within the limits
of the public way, but outside the part thereof customarily used {{ tt 1 by
vehicles. The initial operation of the facilities will be at J285/Ip[4%6
vales, °h9Be phase; the voltage will be increased as occasion therefor
requires for operation not in excess of 20 W to ground.
Dated at Bangor s Mame, this bhit DH EL& Collis i
26th day of January lSt3
Co
Job
ir
6 Ma[
Job ibu[ion
- Coordinator
27•E