Loading...
HomeMy WebLinkAbout1984-09-24 84-347 ORDER54-347 Introduced by Councilor Frankel, september 24,1584 CITY OF BANGOR (TITLE) is gr, -. Authorizing Extension of Sanitary Sewer Southeast., By Re Cin Couwdt ofd a City of Bangor: ORDERED, THAT the attached report of the City Engineer showing the estimated cast and recommended assessments for the extension of the sanitary sewer on Dowd Road in a southeasterly direction for a distance of 490 feet be and hereby is accepted; and be it further ORDEREDr THAT said sewer extension be constructed as soon as possible; and be it further ORDERED THAT the ads of Ten Thousand Seven Hundred Dollars ($10,900.00) be transferred from the Reserve for Future Construction - Sewer Fund to cover the cost of said construction. -1- In City Council September 24,1984 Passed /� GPS 1l4v`-'._._' Ci C k 84-347 0 R C'ER Title, rAtithcAzizng Extension of Sarutery Sewei Southeast Pro�Dow Roel Introduced and filed by , Cowcflnan CITY OF BANGOR, MAINE Engineering Department September 20, 1954 To the Municipal Officers: Reference is made to City Council Order No. 84-320 passed August 27, 1984 directing the City Engineer to do a study to determine the cost of extending the existing sanitary sewer ou Dowd Road in a southeasterly direction for a distance of 490 feet from its present terminus. The request for the extension was received from the Bangor Target Area Development Corporation, intended to replace an existing 6 inch private sewer, so as to provide service to Lots Be. 1, 2 and 3 in the Dowd Industrial Estates Subdivision. The PrO8 sewer extension would consist of the instal.. lation of 490 feet of 8 inch pipe and one manhole. The total estimated cost of the extension is $10,700.00. Of this amount, the City would pay fifty percent, and the remaining $5,350.00 would be assessed against the properties benefitted, being Lots No. 1 2and 3 in said Subdivision, presently owned by the Target Area bevelopwent Corporation. Pro rated against the area of the individual Late, the assessments would be as follows: Lot Be. 1 $l,yl3.00 Lot No. 2 $1030.00 lot No. 3 $2,107.00 Total $5050.00 The Owner of the property has requested that the assessments be deferred until the property is sold. In this regard, the City Engineer recommended that the assessments be deferred for not more than three years, and that ten percent simple interest be added to the assessments for each year that they are deferred. Since the installation of a public sewer to serve these Lots will make them more attractive for purchase, it is recommended that the sewer be constructed, and that the assessments be deferred as mentioned above. Plans showing the proposed sewer extension are on file in the Office of the City Engineer. Respectfully yssubmitted* dolor T. Prawlj� Cy�Ciy Engineer _2-