CITY OF BANGOR
(TITLE) is gr, -. Authorizing Extension of Sanitary Sewer Southeast.,
By Re Cin Couwdt ofd a City of Bangor:
ORDERED,
THAT the attached report of the City Engineer showing the
estimated cast and recommended assessments for the extension of
the sanitary sewer on Dowd Road in a southeasterly direction for
a distance of 490 feet be and hereby is accepted; and be it further
ORDEREDr
THAT said sewer extension be constructed as soon as possible;
and be it further
ORDERED
THAT the ads of Ten Thousand Seven Hundred Dollars ($10,900.00)
be transferred from the Reserve for Future Construction - Sewer Fund
to cover the cost of said construction.
-1-
In City Council September 24,1984
Passed /�
GPS 1l4v`-'._._'
Ci C k
84-347
0 R C'ER
Title,
rAtithcAzizng Extension of Sarutery
Sewei Southeast Pro�Dow Roel
Introduced and filed by
, Cowcflnan
CITY OF BANGOR, MAINE
Engineering Department
September 20, 1954
To the Municipal Officers:
Reference is made to City Council Order No. 84-320 passed
August 27, 1984 directing the City Engineer to do a study to
determine the cost of extending the existing sanitary sewer ou
Dowd Road in a southeasterly direction for a distance of 490
feet from its present terminus. The request for the extension
was received from the Bangor Target Area Development Corporation,
intended to replace an existing 6 inch private sewer, so as to
provide service to Lots Be. 1, 2 and 3 in the Dowd Industrial
Estates Subdivision.
The PrO8
sewer extension would consist of the instal..
lation of 490 feet of 8 inch pipe and one manhole. The total
estimated cost of the extension is $10,700.00. Of this amount,
the City would pay fifty percent, and the remaining $5,350.00
would be assessed against the properties benefitted, being Lots
No. 1 2and 3 in said Subdivision, presently owned by the Target
Area bevelopwent Corporation. Pro rated against the area of the
individual Late, the assessments would be as follows:
Lot Be. 1 $l,yl3.00
Lot No. 2 $1030.00
lot No. 3 $2,107.00
Total $5050.00
The Owner of the property has requested that the assessments
be deferred until the property is sold. In this regard, the City
Engineer recommended that the assessments be deferred for not
more than three years, and that ten percent simple interest be
added to the assessments for each year that they are deferred.
Since the installation of a public sewer to serve these Lots
will make them more attractive for purchase, it is recommended
that the sewer be constructed, and that the assessments be deferred
as mentioned above.
Plans showing the proposed sewer extension are on file in the
Office of the City Engineer.
Respectfully
yssubmitted*
dolor T. Prawlj�