Loading...
HomeMy WebLinkAbout1984-08-27 84-320 ORDER84-320 Introduced by Councilor Fian"l, Au9uat.27, 1984 CITY OF BANGOR QIREd WIDHTy.--Directing City,,,Engineer To. -Do Cost 6tudy,- Dowd Road By tri Cit CoawaN of tie City of Enter: ORDERED, THAT the attached petition from the Bangor Target Area Development Corporation requesting a study to determine the cost of extending the existing 8. inch sanitary sewer on Dowd Road in an easterly direction to provide City sewer service for Lots No. 1, 2 and 3 be and hereby. is accepted; and be it further ORDERED, THAT the City Engineer conduct the necessary surveys, prepare Plans and Cost Estimates, together with a list of possible assessmentsfor said sewer extension and report his findings to the City Conseil for further action. STATEMENT OF FACT: The proposed sewer extension would replace an existing 6 inch private sewer, which would provide the needed additional capacity and the required direct access for Lots No. 1 and 2 into the City sewer system. In City Council August 27.1964 - Passed C1er 84-320 ORDER., ,Bisecting City Engineartodc Coat ................c ............. Study Dowd road Seripr extension Introduced and filed by 04 Lp Councilman �4 pp b P7� IA%BgNO @FM yon 84-320 BANGOR TARGET AREA 4) ®® G ® ® °m a 40 DEVELOPMENT CORPORATION G:wmml1 prulnpmum Mill. / Gp HallMe Mxr / 12071 9144&4 August 23, 1984 - John Frawley City Engineer - city Eon Bangor, Maine 04401 War John: This is to request construction of so eight -inch City sr from the southerly most manhole on Bond Road easterly to the NZTdT property line. The construction length is estimated roughly at 477 feet. It will improve _ sever service to City specifications for Lots 1, 2 and 3 of the Wall edustrial Estates subdivision, and will also pick up the telephone building The project will replace an Inadequate six-inch private sewer inherited by Target Corporation from previous owners, the condition of which is now_ questionable, and remove aserious development cast and service problem for the above mentioned l0ts,especially Jet 81. It will also eliminate the need for any further road openings for sewer service on Bowl Road, with the one exception at Lot Y5. Target is prepared to pay _its fifty Sxcent coat, providI_g the assessments _ _ sale with three lot -ld deferred until sale. Lot #1 Is now ready for axle with au industrial building planned bye developer, and Lot d2 is expected to be sold within thirty Lays of the first sale. - As the first developer is prepared to start constructions as soon as - possible, your speedy attention to this request and Me expedit}_ous action of the City Council will be appreciated. - - - Sincerely, 1 S� Edward C. McKeon Bcn: jar