Loading...
HomeMy WebLinkAbout1984-01-09 84-68 ORDER84-68 Introduced by Councilor cox, Canonry 9, 1984 CITY OF BANGOR (TITLE) VIYTi�Yt—_T.{a afer for Elections and Voter Registration .............. By Nie Me Cussed! ofW My of Beeper: ORDERED, THAT the sum of $5,300.00 be transferred from the Contingent Account (61-01) to the City Clerk's budget (12-02 5 12-04). Statement of Fact: The 1984 appropriation contained monies for two (2) elections not including the special referendum in November. The additional election, plus the re- districting, will necessitate the above additional funding. In city counoil Tenuary 9,1984 Passed 1. iSy Clec 84-68 ORDER Title, Transfer for %,%tion aiW Voter Registration ................f,:4 r::..l.............. Intr filed by ........unci.... �I houncilman V CITY OF BANGOR CENML SO2VICF COST ESTRMTE P MT Change Over an Voting Signs Relettecing (29) Voting Signs Sive 24" x 30" 300.00 B[i'ting Postcards 150.00 450.00 VOTO2 RWISTRATION Bostage for 16,000 postcards .12c each 920.00 Coat of labels 60.00 9W.00 JUNE PRIMARY COST 3,175.00 CITY OF BANGOR PUBLIC WORKS DSPARTNENT COST ESTIMATE PRCZXT Change Wer on Voting Signe EnaPs 6 Hott Corputed by: Phil Damien Date: 12/6/83 Transporting, Sailing dcSn signs, and repainting 40 Hrs. Labor 283.60 Equipment Coat 20.00 Material Cost 35.00 Building (10) New Voting Signs and Painting 40 Hrs. Labor 283.60 Material coat 50.00 equipment coat 5.00 Building (4) Ramps for Handicap Labor 98.00 Material Cost 125.00 F Uipment cast 25.00 Hot Topping 2 Ramp Areas Labor 40.00 Naterial Coat 110.00 $uipment Cost 75.00 40a Overhead on Labor 2B2.o0 PUBLIC WORKS COST 1,432.20 CITY OF BANGOR PUBLIC WORKS DEPARTMENT COSrT/� ESTIMATE PROJECT �N �rGLt O`<j� ON :�6T�iv(r—SI GNS—K3AAPS$N.lo'� DAM/Bi✓ /rte J COMPUTED By DATE �' SHEETOF� OuantiN Dmaription Unit Priw Total Cwt T A Rl'roG .(YA/D/iN OcwN p uipy/NT co, rIyATCI(/ Lc o 3 t- o o GL r.✓G /O N�I✓YoTii✓6 -r%ONS ND A/%✓ NG e st COT Of/Rl f4ROe� aQ3, 60 r �/�xENr Corr s-oa �- �P- Grp s siZF 30 U' L p N� yJ A P✓' kR H>�/D cAP `esmn 9�.�ca zoo tl hFNT eo ,T RAP tf"S. 47d"A/44 c:xrT ro-dd E- V/i° r)VT cost Sb. U L S �3Z.Z0 z. ve 7 7 S'- irp a 7.ao 7-0 00'(3 s.0 (11so.°°) /40 ewl +SO.se lai lvc sz-T tl A- 6 W7"'7icp%