Loading...
HomeMy WebLinkAbout2019-03-11 19-108 Order 03/11/201919-108 03/11/2019 19-108 Water Quality Management Order N/A Title, Order Authorizing Execution of a Contract with Wright Pierce for Emergency Generator Design Services in the Amount of $116,200 The WWTP has requested proposals for design services for an Emergency Generator to provide power to the WWTP during emergency power outages. The City of Bangor’s discharge permit, requires the WWTP be capable of treating wastewater during power outages, by supplying “alternate power supplies”. In the past Emera had multiple feeds into the plant to allow for a switchover should one power supply fail. However, the backup feeds have deteriorated and are no longer an option. Therefore, the WWTP is moving forward with the plans for the installation of an on-site generator. There were six bids for this project ranging from $31,330 to $209,532. After reviewing the proposals, staff recommendation is to award the contract to Wright-Pierce in the amount of $116,200. Wright-Pierce is an Engineering Company that primarily focuses on water, wastewater, and infrastructure projects for municipal and private clients. Their proposal clearly demonstrated their extensive relevant experience and their attention to detail, including building designs and understanding of electrical systems and cost-savings available in design of a backup power system. Finance Committee 03/04/2019 Recommend for passage 50 Consent 03/11/201919-108 CITY OF BANGOR ORDER 03/11/2019 19-108 Nealley Authorizing Execution of a Contract with Wright Pierce for Emergency Generator Design Services in the Amount of $116,200 Be it Ordered by the City Council of the City of Bangor that, the Finance Director is hereby authorized to execute a contract with Wright Pierce for emergency generator design services at the wastewater treatment plant in the amount of $116,200. IN CITY COUNCIL MARCH 11, 2019 CO 19-108 PASSED (/ � f CITY CLERK