Loading...
HomeMy WebLinkAbout1985-08-12 85-281 ORDERIntroduced by Councilor Frankel, August 12, 1985 CITY OF BANGOR (TITLE.) (PrUri... ... Application Bar.. utility- laoation.parnnc -..Banger. Mara _..... Br tU City Coamit of Ma Litz of Bangor. ORDERED, THAT the attached application far utility location permit is hereby granted. Note: Follwiag is tM public street and highway referred to the underground duct line will begin at power pole #22 directly in front of the Bellevue Apartments on lower Main St., from them it will areas -the entrance ramp to I-395 in a direction parallel with m MaiSt, it will continue wider the. existing I-395 overpass and will paws within three feet of the existing bridge piers on the road side, it will continue past power pole #59, across the exit Seeps to I-395 and will terminate on the front lawn of Beale Business College, a few feet from the Beal's sign. No public notice of this application to he mde. in City Council august 12,1985 passed °-c k c%�� City Clerk 85-281 0R➢ER Title, flpplicatiea. Yor.VtA>tY. L94aL1PP.RB[Nit Bangor Hydro Electric Company (Main Street) ....... I .............................. Introduced and filed by - connrilmnn ps'-a�l BANGOR N�S�6i`'. L tTPIC COMPANY 33 State Sheat, P.O. Box 932,,BengonMains 04001 TeL 207-945-5821 May 15, 1985 Russell McKenna City Clerk 73 Harlow Street Bangor, Maine 04401 Dear Mr. McKenna: Enclosed is our application to the Department of Transportation, Bureau of Highways, for locations in Bangor. gem ;.xy truly 4 George Baker Electrical Engineer GB:ec Enclosure