HomeMy WebLinkAbout1985-05-29 85-197 ORDER85-19]
Introduced by Councilor Frankel, Nay 29, 1985
CITY OF BANGOR
(TITLEJ (DrbeF},_Au„thorizing City Manager to. Sign Amendment to
Engineering Contract Domestic Terminal Boot and Other Airgort Work
By de My Omewell of the My of Bangor:
ORDERED,
THAT the City Manager be and hereby is authorized to sign
Supplemental Agreement No. 1, a copy of which is on file in the
City Clerk's Office, amending the original Agreement with Edwards
and Kelsey, Inc. of Boston, Massachusetts dated January 3, 1985,
for the design and inspection of the rehabilitation of the Terminal
Building roof, Airport road signs, the expansion of the commuter
ramp, the installation of a blast fence, and the installation of
security lighting for the general aviation apron at the Bangor
laterastional Airport.
STATEMENT OF FACT:
The Supplemental Agreement involves additional design and
actstrnotion inspection of work which was not anticipated when
the original Engineering Contract was approved. The additional
work is primarily related to the Domestic Terminal, which includes
the analysis and corrective work on various structural members,
additional waterproofing and joint repair attendant to the roof,
windows and skylights, the relocation of the air conditioning
piping, and finish repair and carpeting. The total estimated
cost of the additional work is approximately $65,600.00, with
90% to be paid for by FAA.
In city Council Ray 29,1985 85-197
Refered to Airport & fi:iaice 0 R 0 E R
committee consider next meeting -
Title,
.Authar'.iging, dity Managerto sign
...........:................
City Clerk amendment"to engineering contract
............. I........................
IN CITY COUNCIL Domestic terminal roof and other
June 10, 19B - Airport Work"
Introduced and filed by
esa ea
cxxi. clean iTb^aw 4N
..........
Councilmen
85-397
SUPPLEMENTAL AGREEMENT NO. I
AMENDING THE -
AGREEMENT FOR THE DESIGN, AND INSPECTION OF CONSTRUCTION
FOR THE FOLLOWINGS,...
Rehabilitate Terminal Building Roof. Install Airport Rood
Sign; Expand Commuter Ramp; Install Blast Fence; and
Install Security Lighting for Me General Aviation Apron
Airport Improvement Program
Project No. 3-23-0005-03
At the
Bangor International Airport
Bogor, Maine
This SUPPLEMENTAL AGREEMENT is made and entered into on the
day of . 1985, by and between the City of
Bangor, Maine, hereinafter referred to as the OWNER, and the firm of Edwards
and Kelcey, Inc., 286 Congress Street, Boston, Massachusetts 02210, hereinafter
referred to as the ENGINEER, for design, cpr6truction supervision, resident
lxpection and administrative services in connection with work more specifically
defined herein at the Bangor International Airport. It is understood that this
work is to be carried out under the Federal Aviation Administration`s (FAA)
Airport Improvement Program with participation by the Maine Department of
Transportation, Division of Aeronautics (MOOT).
WITNESSETH: I -
WHEREAS, by an Agreement dated January 3, 1985, the OWNER engaged the
ENGINEER for the design and inspection of construction of Terminal Building
Roof Rehabilitation, Installation of Airport Road Signs, Commuter Ramp Even-
sion, Installation of a Blast Fence, and the Installation of Security Lighting for
the General Aviation Apron at the Bangor International Airport; and
WHEREAS, at the OWNER'S request an evaluation of the Terminal Buildings was
undertaken by the ENGINEER to attempt to identify all of the deficiencies
which may relate to the leaking of the Airport Terminal Buildings; and
WHEREAS, as a result of the abovementioned evaluation a report entitled
B international Airport Domestic
International
rT,areilt
PsedRsadndatNovember 1984herenafter
referred to as the REPORT, attached hereto and made a part hereof, was
submitted by the ENGINEER to the OWNER; and
WHEREAS, as a result of the REPORT, and of discussions between the OWNER
and fine ENGINEER an November 22, 1985, the OWNER has instructed the
ENGINEER to perform Extra Services in accordance with Arficle I of the
Original Agreement, such work being described 08 follows!
• Evaluate the structural integrity of the Domestic Terminal Building and
to provide the OWNER with a written report as to his findings;
• Prepare the preliminary design/study and estimates and to prepare final
designs, controot plans and specifications, construction supervision,
resident inspection and administration of the rehabilitation of the
Terminal Buildings by providing for those improvements listed in
Priority Groups 2, 3 a 4 of the REPORT, more specifically defined as
nd '
D Structural repairs and expansion joints (includes required structural
repairs and expansion joints included in Priority 3.1)
2) Chiller and piping alterations (includes relocation of piping under
roof, Priority Group 2.1)
3) Waterproofing (skylights, wirdows, fascia, recaulking precast
panels, i,sul. walls above concourse ceiling, Pirority Groups 2.2,
2.3,2.4,2.5&3.2)
4) Finish repair and carpeting -concourse level (includes treatment at
structural repairs and Priority Group 4.0
• Accompany the OWNER'S survey crew and assist as necessary in the
compilation of data required by the ENGINEER to undertake the work
specified in ENGINEERdatedAGREEMENT
by and
between the OWNER and the
da
NOWTHEREFORE, in consideration of these. premises and for the fees and
reimbursements named herein, the OWNER and the ENGINEER do hereby
mutually agree as follows:
A. The SCOPE of the Original Agreement is deleted in its entirety and amended to
read as follows:
SCOPE
WHEREAS, the OWNER proposes to:
"Rehabilitate Terminal Building Roof; Install Airport Road Signs; Expand Com-
muter Ramp; Install Fence; Install Security Lighting far the General Aviation
Apron; Perform a Structural Evaluation goal Rehabilitate the Domestic and
International Terminal Buildings" at the Bangor International Airport, Bangor,
Main; and
WHEREAS, the OWNER desires professional engineering services in connection
with the aforesaid improvements:
NOW THEREFORE, the ENGINEER, for the fees and reimbursements named
herein, agrees to furnish the necessary professional engineering services to the
OWNER in accordance with the following articles:
8. ARTICLE A - PROCUREM OF SITE DATA of the Original Agreement is
amended by adding the following paragraph:
C. Field Surveys. All field survey Information will be provided to the Engineer
by the Owner. The Engineer will providegeneral wpervision of the surveying
when requested whether verbally or in writing by the Owner.
C. `ARTICLE G - BASIS OF PAYMENT of the Original Agreement is amended by:
I: deleting the wards "lump sum" and "lump sum of" from para. a. Engineering
Fee.
2. adding the following paragraphs:
a.UJ Engineering Fa. The Owner herby agrees to pay the Engineer
for services included in Articles A, B, C, and D required to Perform a
Structural Ewhmtim and Rehabilitate the Domestic ond International
Terminal Buildings, the fee arrived at is as follows (see also Exhibit'G' and
1-11, Fee Derivation):
.(2.)assert Fee. The Owner hereby agrees to pay the Engineer
for servsVMITu-idM ,n Article A, paragraph c. the fee arrived at as
follows: "
Evaluation & Rebob.
Rddb.
Total
Preliminary Design/
$ 4,587
$ 2,332
$ 61919
Evaluation
615.84
Subconsukant Services
- —
Final Design/Evoluation
8,034
9,292
17,326
Bidding Period -
524
644
1,168
Expenses
10,550
6,_600 -
I�150
$ 1,394
$23,695
$18,868
$42,563
.(2.)assert Fee. The Owner hereby agrees to pay the Engineer
for servsVMITu-idM ,n Article A, paragraph c. the fee arrived at as
follows: "
b.(IJCwatructian Sucervision
Total
Article F required to
Actual Direct
and Rehabilitate the
Category Rote Hours Payroll
Direct Payroll
Engineer $15.00 32 $ 480.00
Overhead Cost (1.20)
615.84
Subconsukant Services
- —
Fixed Fee
164.38
Expenses
- 363.44
Fee -
$1,623.66
b.(IJCwatructian Sucervision
Fee. The estimated Engineering Fee for
Article F required to
A� a Stractaral Ewlwtion
and Rehabilitate the
Danrw rtc and International Terminal Buidirga,
is as follows:
(Based an a
I5 -week construction period, constructing the Raaf Work and
Other Work
concurrently.)
Structural
Other
Evaluation & Rehab.
Rehab.
Total
Direct Payroll
$ 1,004
$ 1,394
$ 2,398
Overhead Cost (1.283)
1,285
1,964
3,249
Subconsultant Services
600
1,500
2,100
Fixed Fee
343
504
847
Eiaenses
2,100
1,200
3,300
Estimated Fee
$ 5,332
$ 6,562
$11,894
C.O.) bxmection Fee. The estimated Resident Engineering Fee
Nidmt
for Article f• regairetl fo
brin o Btruclural Evaluation and Rehabilitate
the Dan,em6c and International
Terminal @aildings is as follows: (Based an
a 12 -week construction period,
constructing the Roof Work and Other Work
concurrently.
Structural Other
Evaluation 6 R hvab Rehab. Total
Direct Payroll
$ 1,4]6 $ 1,512 $ 2,988.
Overhead Cast (1.283)
1,889 1,936 3,825
Suhcomultant Services
-
Fixed Fee -
505 516 - 1,021
Expenses
840 840 1,680
Estimated Fee
$ 4,710 $ 4,8d4 $ 9,514
D. Except as herein modified, the Original Agreement dated January 3, 1985
including any amendments or revisions thereto not modified herein, remains in
dding $65,599.66rce and ffor a total amended fee originalt that the $198,315.665132,]I6 is amended by
In WITNESS WHEREOF, the Parties hereto have made and executed this
SUPPLEMENTAL AGREEMENT the day and year first written above.
CITY OF BANGOR EDWARDS AND KELCEY, INC.
By By
John Flynn Richard A'
City Manager Vice President
BANGOR INTERNATIONAL AIRPORT
DOMESTIC AND INTERNATIONAL TERMINAL BURDINGS
PROPOSED REPAIRS AND IMPROVEMENTS
November 27, 1984
Priority. - Order of Magnitude
Group Description Costs (Ergr. B Cost)
- I. Domestic and International Terminal ROof -
Work as described in conceptual engineering report entitled
"BTA Bangor Maims Internatiodated Augustan20 1984, nd s coverl and Domestic ed
Roof Replacement",
tr Edwards work,
Kelcey, Inc. proposed engineering con-
tract/roof work, submitted on July 11, 1984
Domestic Terminal
1.1 Remove, store and reset chiller and piping.
-. 1.2 Strip roofing, add tapered isultion for positive drainage.
1.3 Rerobf with vabssively applied, non -ballasted membrane.
1.4 Flash and cap parapets and penetrations.
1.5 Revise drainage and recout Pedestrian entrance canopy.
1.6 Remove and replace membrane surface on observation deck.
1.7 Reflash skylights over boarding corridor.
1.8 Remlder standing seam copper, increase freeboard of flash-
ing, add snow cleats. _
International Terminal
1.9 Curb details, alter metal wall panels, counter and cap
flashing details.
1.10 Finger pier cap floshing.
1.11 Roofing repair on bridge.
GROUP 1 TOTAL $335,000 to $400900
2, OTF WOW RELATING TO LEAKAGE
Domestic Terminal
2.1 Relocation of chiller piping below roof _ $25,000''-25%
-2.2 Repair or replace vaulted skylight $35,000* -25%
2.3 Repair or replace skylights over boarding corridor $20,000'* -25%
2.4 Windows at boarding lounges and corridor. $30,000'* -25%
Remove, cat drip at head, add head flashing,
replace fogged insulating glass, reinstall
International Terminal
25 Revise aluminum fascia at boarding ramp towers $ 6,0Nt25%
and bents, finger pier
GROUP 2 TOTAL $116,000`-25%
3, MISCELLANEOUS WOW
Domestic Terminal
3.1 6yare an joints at boarding lounges, stairs $60,000{25%
and bridge
3:2 Recaulking precast concrete pools $20,000'-25%
GROUP 3 TOTAL $80,000'-25%
4. -FINISH WORK
4.1Carpet Domestic Terminal Concourse �OOOWANCE
GROUP 4 TOTAL $40,000
5. ENERGY STUDY
5.1 Review energy audit, design improvements ENGINEERING
ALLOWANCE
GROUP 5 TOTAL $10,0 TORUCS
CONCOST
SUMMARY
(e) Alternative 1. includes cost of Energy Study (only)
does not carry on allowance for cast of Energy
Improvements.
Costs
Recommeded
PriorityEstimated
Low
"gh
Alternatives
Group
Description
1,+
I.
Domestic and International Terminal Roof-
$335,00
$370,00
116,000
$400,00
145,00
2.
Other Work Relating to Leakage -
87,00
60,00
0,00
10,00
3.
Miscellaneous
40,000
40,000
10,00
4.
5.
Finish Work
Energy Study ('I
10_0010,000
10,000
TOTAL
$532,00
$616,000
$695,00
Funding Breakdown:
FAA
$133,0
$154
$
175,]50
STATE
0
,00
8GR
133,00
159,000
173,750
2.
1.
Domestic and International Terminal Roof
$335,00
$370,00
116,00
$400,00
145,00
2.
Other Work Relating to Leakage
8],00
60,00
0,00
100,000
3.
Miscellaneous
-
X03.
W, Goo
IG''000.
4.
Finish Work
TOTAL
$522,00
$606,00
$05,000
Funding Breakdown:.
FAA
$261,000
$303,000
$342,500
STATE
130,
500
130,00
BGR
151,5
171,250
3-.
1.
Domestic and International Terminal Roof
$335,00
$370,00
116,00
$400,000
145,00
2.
Other Work Relating to Leakage
87,00
y
SOU
IO0, 00
4.
Finish Work
TOTAL
$462,000
$526,00
$585,00
Funding Breakdown:
FAA
$231,00
$263,00
$292,500
STATE.115,500
131,50
146,250
BGR
115,500
131,500
1469250
(e) Alternative 1. includes cost of Energy Study (only)
does not carry on allowance for cast of Energy
Improvements.
W7MWMV
FEE DERIVATION FOR STRl1CTURAL EVALUATION AND REHABILITATION
Preliminary
Final
Bidding
C nsftuction
Residerd
Deign
Design
Period
Period
inspection
Caragary
Rate
Hrs. Payroll
Fire. Payroll
Hrs. Payroll
Hrs. Payroll
Hrs. Payroll
Associate
$25
40 $1,200
64 $ 1,600
8 $ 200
32 $ 800
2
Prin. Engr.
23
Sr. Ergr.
IB
24 432
8 144
80 $1,440
Engineer
15
Asst. Engn
12
Sr. Drafter
15
16 240
64 960
4 60
Drafter
11
Tech. Steno
9
8 72
8 72
4 36
Total Payroll
$1,512
$ 3,064
$ 200
$1,004
$1,476
E&K Ovhd.(1.28)
2,477
3,922
256
1,285
1,889.
Direct Costs
'$3,909
$ 6,986
$ 456
$2,289
$3,365
Fixed Fee -
598
1,048
68
343
505
Total Fee
$4,587
$ 8,034
$ 524
$2,632
$3,870
ESTIMATED EXPENSES:
Subconsalt. Em.
$2,000
$ 7,000
$ 600
Resident Insp. Exp.
$ 840
@ $420/week
1 500
Lab Test.& Reports
Z00
Plum, Specs, Repro
950
400
600
Travel& Subsist.
_
Subtotal
$7,537
$15,634
$ 524
$5,332
$4,710
Total Estimated Fee for Structural Evaluation orri Rehabilitation - $33,937
EXHIBIT H - OTHER REHABILITATION WORK
FEE DERIVATION FOR CHILLER & PIPING ALTERATIONS
RELOCATE PIPING UNDER ROOF
"
Preliminary
Final
BiM lm
Construction
Resident
Design
Design
Period
Period
lospection
CateOary Rate
Hrs. Payroll
Hrs.. Payroll
Has. Payroll
Hrs Payroll
Hrs. Payroll
$25
8 $ 200
20 $ 500
4 $ 100
1 $
AssoCiate
Prin. Engr. 23
-
-
8 144
40 730
Sr. Engr. 18
Engineer 15
-
Asrt. Engr. 12
Sr. Drafter IS
4 60
8 120
4 60
Drafter
Tech. Steno 9
4 36
4 36
$ 260
$ 656
$ '0
$ 304
$ 756
Total Payroll
333
840
389
968
E&K Odd. (1.28)
$
724
$1258
Direct Casts
$ 588
$ 1$ 134
IN
Fixed Fee
$ 0
$ 797
$1,982
Total Fee
$ 681
$ 1,720
ESTIMATED EXPENSES:
.
Supeoneslf. Exp.
$1,000
$ 1,000
$ 500
Resident Exp.
$ 420
week
500
Lab Test.& Reports
100
Pians, Specs, Repro.
200
Travel & S,bsist.
$ 0
$1,]97
$2,402
S total
$1,681
$ 3,020
Total Estimated Fee for Otho R,, abilitation
Work far Chiller
& P'piN Alterations
- $8,900
EXHIBIT H - OTHER REHABILITATION WORK
FEES MON FOR � 8 INSUL PIAIJELS ABOVE WINDOWS, FASCIA,
Preliminary
Final
Bidding
Period
Construction
Period
Resider
Inspection
sign
Design
Rote
Hrs. Payroll
Hrs. Payroll
Hm Payroll
Firs Payroll Hm
Payroll
r:aiegary
1 $
$25
16 $ 400
36 $ 900
4 100
32 $ 800
Associate
Prin. Engr. 23
18
12 216
40 720
Sr. Engn-
_
Engineer IS
-
Asst. En9r• -12
IS
8 120
80 1,200
4 60
12 180
Sr. Drafter
Drafter II
-
4 36
Tech. Steres g
24 216
4 36
Total Payroll
$ SO
665
$ 21532
y
$ 196
250
$ 960
1,409
$ 756
%8'
E&K Ovid. (1.28
5__866
52355 369
$I 0724
Direct Costs
$1'178 $
$ 67
258
Fixed Fee
$1,363
$ 6,639
$ 513
$2,724
$1,982
Total Fee
ESTIMATED EXPENSES:
$I
$ 1,500
$ 500
$I, 000
Subconsuit. Exp.
,000
Resident Inse. Exp.
..
$ 420
@ $420/week
500
Lab Test.& Reports
200
Plans, Specs,
Repro.
400
200
200
Travel & Subsist.
$2,763
$ 8,539
$1,013
$4,424
$2,402
Subtotal
Total Estimated Fee fee 011ier Rdwbilitotion Work far Waterproofing - Skyli9lds, Windows,
Fascia,
Recaulkiig Precast Panels, & 1nsul.
Panels Ab Ceiliig - $19,141
EXHIBIT H - OTHER REHABILITATION WORK
FEE DERIVATION FOR FINISHWORK & CARPETING
Total Eainated Fee for Other Re abilitation Work for Finishwank & Carpetirg - $2,193
Preliminary
Firwl
Bidding
Construction
Resident
Design
Design
Period
Period
Impaction
CafeloorY
First.
F
Fk P%50
H4
Hrs. Payroll
Associate
$25
$%50
$a 200
$�Io0ll
Prin. Engr.
23
Sr. Engr.
18
Engineer
IS
-
Asst. Egr.
12
Sr. Drafter
IS
4 60
8
120
2 30
Drafter
II
Tech. Steno
9
.4
36
Total Payroll
$ I10
$ 356
$ 50
$ 130
_
E&K Ovhd.(1.28)
140
456
64
166
Direct Costs
250
812
114
296
Fined Fee
3B
_122
17
45
Total Fee
$ 288
$ 933
$ 131
$ 341
ESTIMATED EXPENSES:
Subconsalt. Exp.
$ 500
Resident Imp. Exp.
a $420/week
Lab Test.& Reports
Plans, Specs, Repro.
Travel & Subsist.
Subtotal
$ 288
$ 1,433
- - $ 131
$ 341
Total Eainated Fee for Other Re abilitation Work for Finishwank & Carpetirg - $2,193