Loading...
HomeMy WebLinkAbout1985-04-08 85-162 ORDER85-162 Introduced by Councilor MCCeuthy, April 8, 1905 _ CITY OF BANGOR. (TITLE.) Nyril2r,.... Authoriging Amendment No. 1_to Agreemeat,_with Hoyle., Tanner & Associates, Inc. - Air Carrier Ramp Drainage Structures Rehabilitation st Bangor International Airport BY t&5 City C z oftAu City OfBalenw. ORDERED, THAT the City Manager be and hereby is authorised to sign Amendment No. 1 to the Agreement for professional services with Boyle, Termer & Associates, Inc. pertaining to the study and preliminary design of rehabilitation work on the drainage struc- tures on the heavy duty apron at Bangor International Airport, e copy of said Amendment being on file in the Office of the City Clerk. STATEMEBT OF FACT: The Agreement with Boyle, Turner & Associates, Inc. provides for the study and preliminary design of a solution to the movement of the concrete pavement on the heavy duty apron at Bangor Inter- national Airport, including rehabilitation of the existing drainage trenches. The proposed Amendment, in the amount of $5,225.00, would allow for the excavation of the concrete pavement in three locations, and the investigation and evaluation of the joints in those locations, to be incorporated into the overall study. This Mork was not originally anticipated as part of the original engineering Agreement, and will result in additional cost. i es "O.R D E R �t9FC 9N In City cou cil April 6,]9&5 Cfyp bA./ '�JJ Passed Title AUthOrizing AasMacot 'No 1 to Agreemeat Moyle er s Associates Inc. '- Ci y Clark $ii C3YiiBi 99PP.4@iW44 Uvwt90es " ReAab;litation at Bangor International `/ noduced and filed w g i AMENDMENT N0. l TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES AIR CARRIER RAMP DRAINAGE STRUCTURES REHABILITATION ADAP Project No. 6-23-0005-09, Contract No. 2 and ASP Project No, 3-23-0005-01, Contract No, 2 BANGOR INTERNATIONAL AIRPORT -' - - This AGREENENT..made and entered into at Penobscot County, Maine, effective the 26th day of Fetiruary-"' ;'1985'; ^by -and between the City of Bangor, Maine (hereinafter called the OWNER) and the firm of Hoyle, Tanner 6 Associates, Inc., Consulting Engineers, Londonderry, New Hampshire (hereinafter called the CONSULTANT). WITNESSETH: WHEREAS, the OWNER is the owner and operator. of Bangor Interna- tional Airport, Bangor, Maine, and WHEREAS, the OWNER and the CONSULTANT have entered into an agreement for Engineering Services dated Tune 1, 1983 fora - design study to determine feasible solutions to the problem of failure of the transverse trench -type reinforced concrete drain- age structures located in the area of the main ramp used for civil air carrier operations both domestic and international. The foregoing to be hereinafter referred to as the STUDY; and WHEREAS, ADAP Project No. 6-23-0005-09 and AIP Project No. 3-23-0005-01 provides monies for the STUDY; and WHEREAS, the STUDY has been approved by the FAA, the Maine DOT and local government agencies; and WHEREAS, the CONSULTANT, in the course of the STUDY, has identi- fied the need to examine the subsurface condition of the joints in the existing Portland cement concrete pavement; and WHEREAS, said examination was not included in the scope of work in the agreement between the OWNER and the CONSULTANT for the STUDY; and - WHEREAS, the OWNER, with the concurrence of the FAA, the Maine DOT, and local goverment agencies, wishes to undertake the examination of the subsurface condition of the joints; and WHEREAS, the services of a professional°engineer or engineering Firm are recuired by the ONMER to evaluate the subsurface condi- tion othe-joints; and WHEREAS, such services are of a distinct professional and non-com- petitive nature; and the OWNER has selected the CONSULTANT to provide the required services as a continuation of engineering services already completed; NOW THEREFORE, in consideration of these premises, the CONSULTANT and the OWNER agree to amend their AGREEMENT dated the 1st day of June, 1983, as follows: e ADD the following Article: ARTICLE XIII. SCOPE OF SERVICES - EXAM"INATION OF SUBSURFACE JOINT CONDITION The CONSULTANT shall undertake the examination of the subsurface condition of the joints in the existing Portland cement concrete pavement of the main amp at Bangor International Airport. The CONSULTANT•s work under this ARTICLE shall include: - e. Contracting with and supervising the work of a subcontractor for the full depth removal ofPortland"cementconcrete _. pavement inorderto expose the joint for examination; restoration of the Portland concrete pavement upon comple- tion of the examination; removal of the existing joint sealer from the top < inches t of the joint to permit measurement of the joint width; and resealing of the joint uponcompletionof the measurements. e Field measurement and photographing of the existing joints exposed for examination. - e Coordination of the above described work with the OWNER. All materials and construction methods used in the restoration of the Portland cement concrete pavement shall conform to the applicable sections of FAA AC150/5370-10. • Under ARTICLE II., Paragraph B. ^Compensation for Study Phase' add the following: 2. For providing services under ARTICLE XIII. SCOPE OF SERVICES - EXAMINATION OF SUBSURFACE JOINT CONDITION, the amount of five thousand two hundred twenty-five and 00/100 dollars 155,225.001 which includes a fixed fee payment in the amount of $375.00. e Revise ARTICLE VI. TIME FOR COMPLETION to read as follows: The CONSULTANT shall complete all work under ARTICLE I and ARTICLE XIII of this AGREEMENT including temporary patching of the portland cement concrete pavement by March 31, 1985. Permanent restoration of the Portland cement concrete pavement shallbe completed as soon as weather conditions permit. Exhibit C is hereby revised by the addition of the estimated - costa for ARTICLE XIII. All other items and conditions of the agreement remain unchanged. IN WITNESS WHEREOF, the parties hereto have affixed their hands and seals at Penobscot County, effective the date first above written. CITY OF BANGOR, MAINE (GWNER) By: ATTEST: BOYLE, TANNER 6 ASSOCIATES. INC. (CONSULTANT) Ey: % ATTEST- Cl,� J es O. Boothroyd for Vice President EXHIBIT C AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES AIR CARRIER RAMP DRAINAGE STRUCTURES REHABILITATION ADAP Project No. 6-23-0005-09, Contract No. 2 and AIP Project No. 3-23-0005-02, Contract No. 2 BANGOR INTERNATIONAL AIRPORT ARTICLE .XIII. SCOPE OF SERVICES - EXAMINATION OF SUBSURFACE JOINT COCO INS Project Engineer 12 his @ $17.00 - $ 204.00 Senior Structural Engineer 16 bra @ $30.00 = 480.00 Structural Engineer 16 bra @ $16.00 m 256.00 Direct Labor = $ 940.00 Payroll Overhead (40.78 X Labor) = 383.00 General 6 Admin. Overhead (128.08 X Labor) _ 1,203.00 Subtotal _ $2,526.00 Miscellaneous Direct Non -Salary Expenses Travel $ W00.00 Subsistence and Expenses = 300.00 Subtotal _ $ 700.00 SUBCONTRACTOR Remove and replace section of joint full depth 3 ea. @ $500.00 = $1,500.00 Remove and reseal joint 4"f Deep 25 IF @ $5.00 125.00 Subtotal = $1,625.00 Total Estimated Actual Costs _ $4,851.00 Use: Acutal Cost not to Exceed = - $4,850.00 Fixed Fee = 375.00 Total = $5,225.00