Loading...
HomeMy WebLinkAbout1985-02-25 85-122 ORDER85-122 Introduced by Councilor NcCazthy, February 25, 1965 CITY OF BANGOR QITLLJ 00tr n t nE clty aog r to m c ex study - Pine Meadows Subdivision Roads and Severn By the City Consul of Us OCR of Burger: ORDERED, THAT the attached petition from the Soucy -Black Agency of Bangor requesting a study to determine the cost of constructing the roads, sanitary and storm sewers in the proposed subdivision on Pushes Road being hereby is accepted. AND BE IT FURTHER ORDERED THAT the City Engineer be and hereby -1s authorised to prepare the necessary cost estimates, to- gether with a list of possible a ents, and to submit a report to the City Council for further action. IS Otykeoancil £ebeuazy 25,1985 85-122 Passed Bj CR DER F1. sem, Title, cl9 6� io W�ct zyc 1 a Directing City Engineer to do Cost Study r e. FAAt Meadows Subdkmaisn Aoads and Severs II�n//traduced and filed by `` Co c loran 85-122 D4 Soucy - Black Agency :ea state Ste :, Ballor, r iim owm 2o7/94ae711 tre gom., aoo, m e W WIN 1,wm February 20, 1985 Mr. JOtm Flynn City Manager Bangor, Maina 04401 Dear Mr. Flynn: Re: Pine Meadows Sub -Division Fins at Push Fuad Bangor, Maine I hereby request a oast study of reads, senor and whatever is necessary for the above mentioned subdivision to qualify as a dedicated residential suCdivision for the City of Bangor.