Loading...
HomeMy WebLinkAbout1985-01-14 85-77 ORDER85-77 Introduced by Councilor Cox, Sanuary 14, 1985 CITY OF BANGOR OITLEJ MrDHr, - BxnalCost of...__ Bellevue Avenue Extension Construction By City CMned of the Oft ofBmnyor. ORDERED, THAT the attached report of the City Engineer showing the. actual costa for the reconstructton of Bellevue Avenue Extension approximately 500 feet from Garland Street in a northerly directionq including a sanitary sewer, be and hereby is accepted; and be it further OHDE j THAT the assessments be levied as recommended therein. -1- 85-77 If circ COUNCIL O R D E R Janvary.14, 1985 C .}1 10 Passed ,Tice, ryr�p �/ 9y Ac agtin4 City BMineei's Report CIGLBR% a ................... I................ Final Cwt of Bellevue Avenue Extension .I y ...................................... - Constxuction .. Introduced d ed by .. - .../, A.......... Cowcilman ClT OF.BANGOR, MAINE Engineering Department January 9, 1985 To the Municipal Officers: Reference is made to City Council Order No. 84-297 passed August 13, 1984, authorizing the construction of Bellevue Avenue to acceptable standards for a distance of approximately 500 feet north from Garland Street, as requested by a petition from the abutting property owners. All work has been completed, as follows: The existing roadway had insufficient gravel base and ali- ment, thereby requiring complete excavation and replacement. The new roadway was constructed to a width of 20 feet for a total length of 479 feet, which a T-shaped turnaround at the northerly end. An existing roadway culvert was removed, as well as two existing driveway culverts,. since they were in very poor condition, and were not effectively handling the surface drainage. Two new catch basins were installed, one at the corner of Garland Street, and one approxi- mately 300 feet north from Garland Street. In addition, the new roadway was graded so as to better channel the flow of surface water to the catch basins. The naw roadway consists of a 12 inch gravel subbase, with a 3 inch select gravel base and a 3 inch bituminous concrete surface. Driveway aprons were regraded to meet the new road grade, and were provided with a 6 inch gravel base and a 2 inch bituminous concrete surface. All adjacent areas disturbed by the construction and regrading were provided with 4 inches of loam and seed. The total actual cost of the roadway construction was $16,102.52, which compared favorably with the original estimate of $22,660.00. Chapter VI, Article 4, Section 2.4 of the Laws and Ordinances of the City of Bangor permits the assessment of one-third of the cost of the construction of existing unaccepted streets; therefore, the City's share of the roadway construction would be $10,735.02, and the amount to be assessed against the abutting property owners 75 Bellevue Avenue. It is felt that they benefit equally, so that their individual assessments would be $1,341.88. An 8 inch sanitary sewer was also installed, to replace an existing private sewer serving the Schiro property, which was reportably in questionable condition, and was not large enough for conversion to a public sewer; also, Dr. Aloupis requested sanitary sewer service to serve his property. The new City sewer consisted of 416 feet of 8 inch PVC pipe and one manhole, connected to the street end of the existing service from the Schiro property. -2- In addition, a 4 inch lateral wan installed to the property line of Dr. Aloupis. The total actualooat of the sewer installation, including a 4 inch service line to the Aloupis property, was $11,916.42, which compared favorably with the original estimate of $12,900.00. The 4 inch lateral to the Aloupis property line cost $450.00. in accordance with State Statutes, fifty percent of the cost of sanitary sewers may be assessed against the properties benefitted, so that the City's share, excluding the 4 inch lateral, would be $5,733.21. The remaining fifty percent was assessed equally against the proper- ties of Schiro and Aloupis, since the other properties received no benefit, being already connected to the Garland Street sewer. The total cost of the 4 inch lateral to the Aloupia property line would be assessed to Alcupia. Accordingly, total actual coats and recommended assessments are as follows: ROADWAY 2/3 CityeShare a $10,735.02 Marion Laeger $1,341.88 John R. Graham 1,341.88 Rachel D. Schiro 1,341.88 Vance A. Aloupis 1.341.88 Total Private Share 5.367.51 Total Roadway Cost $16,102.53 SEWER City Share, 50% $ 5,733.21 Private Share, 50% Rachel D. Schiro $ 23866.61 Vance A. Aloupis 3.316.61 (inc. service line) 6.183.22 Total Sewer Coat, including service lateral $119916.42 It is recommended that the assessments be levied as described above. It is further recommended that action be initiated to accept the new street as a public way. Respectfully submitted, J\obnl-^'TV.`-Fr Cit Engineer -3-