QITLU @rbBr,..A.Mandment to Gontract with Ames Engineers, Inc._...
By Ma Cite Go of Mw City of Deaver:
ORDERED,
TEAT, WHMMWI the City of Bangor has previously contracted
with Ames Ilagineers, Inc. for the design of a snow removal equip-
ment storage building at Bangor International Airport; and
WHEREAS, additional preliminary design work was required as
a result in the increase in the originally estimated size of the
proposed building, on the basis of evaluating total Airport Depart-
ment storage requirements; and
WHEREAS, said additional design required modification of
preliminary plans and additional overtime work by said Ames
Bhgineers to meet Federal Aviation Administration deadlines;
NOW, THEREFORE, Be It
ORDEM, THAT said Contract, dated March 20, 1986, be amended
by increasing the Basic Service Fee from $48,600.00 to $60,471.23•
STATEMENT OF FAOT%
Based upon information contained in an FAA Advisory Circular,
the building size for the preliminary budget application to FAA was
assumed to be 12,8W square feet. Further evaluation by the Consultant
during the schematic design phase indicated that the building size
should be increased to 15,500 square feet to meet the Airport
Department's storage requirements, thereby resulting is additional
design work. The recommended increase in the building size has
been approved by FAA.
86-314
OR➢ER
t
IN CITY CO=L
Title,
JuW 28, 1986
Pa38Amanduent
��
to. Cc t2H t with
A
_�4
N
GtRfi OU
-
CxTv Leah
8r ¢ to..
y .
..
txoduced and
bbQy��//�///
.;
/yfiled
� Comci]Aa✓✓ggrr