Loading...
HomeMy WebLinkAbout1986-06-23 86-286 ORDERB6-296 Introduced by Councilor Tilley June 23, 1996 CITY OF BANGOR (TITLE.) MrUr, Authorising Reconstruction of a Portion of Burleigh By Me City Conant of de City Of Remove. ORDERED, THAT, WHEREAS, Burleigh Road, extending northeast from Broadway, is in extremely poor structural condition for a distance of approxd- mately 2,000 feet; and WHEXEAB, the poor condition of said roadway has necessitated considerable expenditures annually for maintenance patching; and WHEREAS, the irregular condition of the road is considered to be detrimental to traffic safety; and WHEREAS, work currently is being undertaken by the Bangor Water District to install a new water main which will require expenditures estimated at 610,250. for trench repair by said District which could better be used toward the reconstruction of the road; NOW, THEREFORE, Be It ORDERED, THAT thepermanent repair of the water line trench be waived upon receipt of 510,250. from the Bangor Water District; sad be it further ORDERED, THAT the sum of Eighty Thousand Dollars ($80,000.) be transferred from the Reserve for Future Construction - General Fund to cover the City share of said construction; and be it further ORDERED, TRAT said roadway be reconstructed for a distance of 21000 feet northeast from Broadway, consisting of a 24 foot wide paved surface with 8 foot gravel shoulders and open ditches on each aide. STATRMENT OF FACT: The total estimated cost of reconstruction is $90000. 7e� R��96 0R0'ER IN CTTT CWNCIL June 23, 1996 eassai � Title, ' ... M WF19iP8 Re pP tF WF.I A 4 A PPFiion RR o£ Burleigb Noel.. 'Innood/ucced and filed by UnCiloaa