HomeMy WebLinkAbout1986-03-24 86-129 ORDER86-129
Introduced by Councilor mCarthy, Mattb 39, 1986
CITY OF BANGOR
(TITLE.) Wrl
By the City Coaeeil of City ofBanyol:
ORDERED,
THAT, WEXIMAS, the:City Council, by Council Order No. 86-16
passed November 25, 1985, authorized the City Manager to enter into
a Memorandum of Understanding with the Maine Department of Trans-
portation for the resurfacing of Main Street between Interstate
Highway 1-395 and Union Street; and
WHEREAS; the Maine Department of Transportation, upon petition
by the City, ,has expanded the scope of the proposed project to
include new curbing and traffic medians{
Now, TH:RMHE, HE IT
ORDERED, THAT the City Manager be and hereby is authorized to
enter into a revised Memorandum of Understanding with said Maine
Department of Transportation, a copyof said Agreement being on
file in the Office of the City Clerk.
STATEMENT OF FACT:
The total estimated cost of the project in $750,000.00, with
12.45% to be paid by the City.
In City Council March 24,1906
Pezed to finance committee
oon nett meeting
Cityrzz
C1
IN CITY COUNCIL
April 14, 1986
Referred to Public Safety Coumittee
Consider next meeting.
aaa
^lfv cveex
In City Council April 22,1986
consider next meeting
refered to Public Safety Comm.
4C y Clerk
In City Council MAY 1211986
/Coynssider next ting
�/
CYty CS ex meeting
in City Council May 28,1986
/C!onnnnnniidder next meeting
'city Clem O
86429q
. O R D6E R
Title,
"
Authorizing City Manager to enter into a
revised agredbent with MDOT Main street
impxavemneta •....:......••.•.....:
dt[dd4 ed s d file
In City Council June 9'1986
Pani
ity Cl�k
66-129
MEMORANDUM OF UNDERSTANDING
Between the
STATE OF MAINE
and the
CITY OF BANGOR
Regarding
Federal Aid Project No. F-043-1(47)
PIN 2642.00
WHEREAS a project to improve Main Street in Bangor, consisting of
widening (on 5 -lane portion), some milling, overlay, curb adjustment
and replacement, beginning 0.17 mile northeasterly of Interstate 395
at Dutton Street at the end of Federal Aid Project No. 1-395-8(88)
and extending northeasterly 0.97 mile to union Street, has been
included in the 1986-1987 Transportation Investment Program contin-
gent upon one-half of the non -Federal share of the total project
cost being provided by the local community, and;
WHEREAS it is necessary for the STATE OF MAINE, acting by and
through its Department of Transportation, hereinafter referred tows
the Department, and the CITY OF BANGOR, hereinafter referred to as
the Municipality, to agree to a coordination and reimbursement pro-
cedure for this project, and;
WHEREAS the Municipality must indicate its commitment to this pro-
ject by signing the original copy of this Memorandum in the spaces
provided and returning it to the Maine Department of Transportation,
State House Station ji16, Augusta, Maine 04333, Attn: Richard A.
Coleman, Chief Engineer, prior to the advancement of preconstruction
activities;
NOW THEREFORE, the parties agree to the coordination and reimburse-
ment procedure for this project as follows:
MEMORANDUM OF UNDERSTANDING Page 2
A. DEFINITIONS
1. PROGRAMMED COST: The estimated cost of the project as
developed during the planning phase. This amount is
intended for planning purposes only since it is based
upon preliminary information. The Programmed Cost of
this project is $750,000. This cost figure will be
amended and updated based upon a detailed estimate once
the project development process is completed prior to
advertising for bids.
2. TOTAL ESTIMATED COST: The updated and more detailed
estimated cost of the project as determined at the com-
pletion of the project development process prior to
advertising for bids. This cost figure is based upon
the detailed Engineer's Estimate and includes in ad-
dition to construction items, all engineering and right
of way costs necessary to satisfactorily complete the
project. It sball become the basis for determining the
upper limit of the Municipal Share of the project cost
to be paid by the Municipality as hereinafter provided.
J. MUNICIPAL SHARE: �Tbet portion of the project cost to be
paid by the Municipality based upon one-half of the
non -Federal share of the Total Estimated Cost of the
project as determined prior to advertising OR immediate-
ly following contract award, whichever is LESS.
4. NON-FEDERAL SHARE: The Federal participation rate for
this project is 75.1% of the total project cost, there-
fore, one-half of the non -Federal share for this project
can be figured at the rate of 12.45%.
MEMORANDUM of UNDERSTANDING Page 3
B. REIMBURSEMENT
Prior to the advancement of the project development pro-
cess, the Municipality shall forward the signed original
copy of this Memorandum to the Department, thereby acknow-
ledging that the level of local funding towards this pro-
ject as stated herein is acceptable to the Municipality.
The Department shall complete the signature process and
return a copy of the fully signed Memorandum to the Muni-
cipality.
Upon completion of the project development process and
prior to advertising for bids, the Department shall notify
the Municipality of the Total Estimated Cost of the pro-
ject as determined inaccordance with Paragraph A.2 above,
which shall become abasis for determining the Municipal
Share, this basis may be modified later if the bid prices
as a result of contract award are LESS than estimated
prior thereto, in which event, the LOWER of the two cost
figures shall be used as the final basis for determining
the Municipal Share. An Agreement may be required for
this project prior to advertising for bids. The Municipal
Share and the basis for its computation shall be contained
an such an agreement or in a letter if no agreement is
required.
3. According to preliminary estimates this project is
scheduled for advertising in June of 1987 and based upon
past schedules, the contract for the construction thereof
should be awarded 3 to 4 weeks subsequent thereto, at
which time, the Department shall advise the Municipality
of the amount and basis for the Municipal Share then due.
MEMORANDUM OF UNDERSTANDING Page 4
4. The total financial obligation of the Municipality towards
this project shall be completed upon payment of the Muni-
cipal Share as hereinbefore provided, EXCEPT for any addi-
tional cost resulting from changes requested by the Muni-
cipality during the construction phase,nwhich event,
the Municipality shall be expected to pay all of the non -
Federal share of the additional cost therefor.
C. PROJECT DEVELOPMENT
During the public participation process, the Department shall
arrange for a meeting with the Municipality to review the
details of the project. Additional reviews
ews may be requested
by either party at any point during theproject development
process.
2. Upon completion of the project development process an Agree-
ment may be prepared by the Department and forwarded to the
Municipality formalizing the funding arrangement outlined
herein and setting forth additional terms and conditions
required of the parties hereto prior to advancing this pro-
ject to the construction phase. In the event no agreement is
required, a letter may be substituted therefor indicating the
Municipal Share due upon contract award.
3. The Department and the Municipality hereby retain the right
to terminate the project at any time prior to the acquisition
of right of way. it is expressly understood that this pro-
ject will NOT be terminated by the Municipality subsequent to
the acquisition of right of way WITHOUT first obtaining the
approval of the Department.
a. In the event the project is terminated at the request of
the Municipality prior to the completion of con-
struction, the Municipality shall become responsible for
the entire non -Federal share of the total expenditures
incurred against the project at the time of termination.
MEMORANDUM OF UNDERSTANDING Page 5
b. In the event the project is terminated by the Depart-
ment, the Department shall become responsible for the
entire non -Federal share of the total expenditures in-
curred against the project at the time of termination.
C. In the event the project is terminated by mutual consent
of the parties hereto, the Municipality shall become
responsible for one-half of the non -Federal Share of the
total expenditures incurred against the project at the
time of termination, consistent with the Municipal Share
set forth in Paragraph A.3 above, and the Department
shall become responsible for the balance of the non -
Federal share of the expenditures so incurred.
D. APPROVAL
1. This Memorandum becomes effective upon approval and signature
of the parties hereto.
2. By the Department o , 19_
MAINE DEPARTMENT OF TRANSPORTATION
Dana F. Connors. Commissioner
By:
Richard
Chief Engineer
3. By the Municipality on . 19_
CITY OF BANGOR
By:
John W. Flynn
City Manager