Loading...
HomeMy WebLinkAbout1986-08-11 86-238 ORDERIntroduced by Councilor McCarthy May 38, 1986 CITY OF BANGOR (TITLE) (®rbCr, Accepting City Engineer's Report - Final Cost of Neaduskeag Avenue Sewer Extension North from Broadway Lateral Sewer ....._..__ I ...... I..... —, _. ........... _._ __.. By the Ciao Cannel of the City Of Dealer: ORDERED. THAT the attached report of the City Engineer showing the actual cost of extending the sanitary sewer approximately 11400 feet north from the Broadway Lateral Sewer be and hereby is accepted; and be it further ORDERED, THAT the assessments be deferred as noted therein, and that a refund be made to the Bangor Baptist Church covering the balance of their initial deposit for the sewer extension. In c Council May 28.1986. - B-. ea d OR R OER cy Cie Title, .. BSFEPtY49.SiFY. GP9jnpgr„s xepgrs„TInal Cost of Fo:. YSkeag a extension . .......................... I........... North from Broadway lateral Mover Introduced and it ad qy .Vr. ✓ i.1...... t COWC11ID3n N N G CITY OF BANGOR, MAINE Engineering Department May 13, 1986 To the Municipal Officers: Reference is made to City Council Order No. 81-285 passed September 28, 1981 which authorized the extension of the sanitary sewer in a northerly direction an Nenduskeag Avenue from the Broadway Lateral Sewer, as the result of a petition from the Bangor Baptist Church. All work has been completed, consisting of the installation of 1,400 feet of 8 inch sewer and five manholes. The actual coat of the sewer installation was $33,230.00, which compared favorably with the original estimated coat of $392750.00. In accordance with the original agreement, the City would pay fifty percent of the coat and the remaining amount would be assessed proportionately against the properties bene- fitted, as follows: Name Frontage Aasesameut EAST SIDE Dorothea H. Grant 225' $1,291.77 (non -assessable) Bangor Baptist Church 1119' $69424.39 WEST SIDE Roy S. Patten 32O' $1,837.18 (non -assessable) Francis J. Woodhead 300' $1,722.36 Florence F. Wood 490' $2,813.18 George E. Kelliher 125' $ 717.65 Clara Bridges 315' $1,808.47 The non -assessable shares indicated above are the result of the previous extension of the Broadway Lateral Sewer across the subject properties, for which free entry into the sewer was granted by the City in exchange for sewer easements; accordingly, the pro rated assessments would be paid by the City. All of the above listed property owners were originally opposed to the sewer extension, except for the Bangor Baptist Church, the original petitioner. The original Council author- ization to construct the sewer provided that the Church would prepay the total private share, and that the assessments against the properties of those opposed would be deferred until sewer entry is requested, with simple interest charged at the rate -1- 06-230 of twelve percent (12%) for the first ten years, or until sewer entry is requested, whichever is leas. At such time as any of those owners with deferred assessments desire to enter the sewer, then the assessment, plus interest, would be paid, and eighty percent (80%) would be reimbursed to the Bangor Baptist Church. The original prepayment by the Bangor Baptist Church amounted to $16,000.00. Since the total private share was $13,486.00, e refund of $2,514.00 should be made to the Church. It is recom- mended that the remaining assessments be deferred until sewer entry is requested under the conditions described above provided that a suitable Subordinate Agreement is executed by the property owners whose assessments are to be deferred. Plane showing the actual sewer installation are on file in the office of the City Engineer. Respectfully submitted, John T. Frawley, City Engineer .2_