HomeMy WebLinkAbout1986-05-28 86-237 ORDERIntroduced by Councilrt arthy May, 28, 1996
_qCITY OF BANGOR
(TITLE.)V1J£11CX, Aoceptl.ng City, Engineer's. Report Final. Cost of Dowd
Road Sanitary Sewer Extension
By be Cary CoaroS of 1a City ofBaaaw:
ORDERED,
THAT the attached report of the City Engineer showing the
actual cost and recommended assessments for the extension of the
sanitary sewer on Dowd Road in a southeasterly direction for a
distance of 490 feet be and hereby is accepted and be it further
ORDERED,
THAT said sewer assessments be deferred or levied as indicated
in said report.
In City Council May 28,1986 86-217
e %�� 0R➢ER
Zty a Title,
e[k
Accepting City Engineer's report
final Coat of Dmd Raid 8aniia L "
..S2N4i RM144941M ..::.................
Introduced and led
s
come, n NiOzN
UI
UI
CITY OF BANGOR, MAINE
Engineering Department
May 14, 1986
To the Municipal Officers:
Reference is made to City Council Order No. 84-347 passed
September 24, 1984 authorising the extension of the existing
sanitary sewer on Doxil Road in a southerly direction to serve
three additional lots owned by the Target Area Development Corp.,
identified as Lots No. 1, No. 2 and No. 3 in the Dowd Industrial
Estates Subdivision.
The sewer extension consisted of the installation of 490
feet of 8 inch pipe and one manhole. The total actual coat of
the sewer installation was $6,656.00, which compares favorably
with the original estimate of $10,700.00. In accordance with
the ori al agreement, the City would pay fifty percent of the
Cos t and the remaining $3028.00 would be assessed against Lots
No. 1, No. 2 and No. 3 in the Dowd Industrial Estates Subdivision
in proportion to the area of each lot. Accordingly, the recom-
mended assessments would be as follows:
Lot No. 1 $1,065.58
Lot No. 2 - 951.75
Lot No. 3 1.310.67
Total $3028.00
It was originally agreed by the City Council that the assess-
ments would be deferred for up to three years, or until each lot
was sold, r ichever is lees, and that ten percent (10%) simple
interest would be added to the assessments for each year that
they were deferred. Since the sewer installation was completed
by June 30 198-52 it is recommended that the three year period
3b
extend to lune , 1988. Furthermore, since Lot No. 2 was sold
to Eremite & Valley, Inc, prior to the completion of the sewer,
it is recommended that the assessment for Lot No. 2 be levied,
with ten percent (30%) interest added for the year that payment
has been deferred. This would result in a current assessment of
$1,046.93 against Lot No. 2.
A plan showing the actual sewer extension is on file in
the office of the City Engineer.
Rq�espeectffuullysubmitted,
John T. EraHley, 41
City Engineer