Loading...
HomeMy WebLinkAbout1987-06-23 87-236 ORDER8]-236 Introduced by Councilor Shubert, June 23, 1987 A. CITY OF BANGOR (TITLE) (6rbtr,__ AuthorizAng_gxtension. of. City Sanitary Sever System to Springer Drive ------------------- 'BVVW city cw of/ WevafDamon: ORDERED, T&AT the attached report of the City Engineer shoving the estimated cost and recommended asenc for the extension of the existing sanitary sewer n the northeast side of Rogan Road for a distance of 210 feet south- east to Springer Drive be'And hereby is accepted; and be it further ORDERED, THAT the sum of Three Thousand Five Hundred Dollars ($3,500.00) be transferred from the Reserve fon Future Construction - Sewer Account, to pay the City's share of said sewer extension: and be it further ORDERED. THAT said sewer extension be started immediately upon receipt of the privateshat of thecost from the Webber 011 Company, original petitionat j for said extension. In City Council June 23,1987 re£ered to finance committee consider let meeting in july City clerk In City Council July 13,1987 consider July 27,1987 Ciry, Cleft IN CITY COUNCIL July 27, 1987 Consider Ist meeting i An Se CI RR 87-236 ORDER Title, Authorizing Extension of City ...................................... Ssitar aewer System to SpringerDr. x ........................... / duced end le ..d....... . ...... Councilman IN CITY CONNCIL Angust 10, 1987 u son CI LEAK CITY OF BM'GOR, MAINE Engineering Department June 16, 1987 To the Municipal Officers: Reference is made to City Council Order No. 87-186 passed April 27, 1987, directing the City Engineer to doe cost study to extend the existing sanitary sewer system northeast from Hogan Road in a southeasterly direction toward Springer Drive. Surveys, Plans and Cost Estimates have been completed, as follows: The proposed extension would d at Cfi t Affxauahhble located o r the City s on the northeast side comments at Road. and would extend in a southeasterly direction for a distance of 210 feet, consisting of 8 inch pipe, terminating at a manhole. This sewer would replace an existing 6 inch private and would a various properties at the southwesterly end of Springer Drive, including BurgeRing, Paul's Restaurant, and two properties owed by the Webber 011 Company. The total estimated cost of the installation is Seven Thousand Dollars ($7,000.00). of which the City would pay fifty percent, and the remaining $3.500.00 would be assessed against the Webber Oil Company, the petitioner for the sewer extension. Representatives of Webber have indicated their approval of the extension and proposed assessment. It i ended that thea r be installed, since it would eliminate the present situation of numerous property owners connected into a private r under e zed s It i ended that the sewer be installed upon receipt of the private share of thecost._ Class showing the proposed sewer extension are on file in the office of the City Engineer. Respectfully submitted. John E. Frawley, City Engineer