Loading...
HomeMy WebLinkAbout1987-03-23 87-116 ORDER81-116 Introduced by Councilor Sullivan, March 23, 1987 CITY OF BANGOR (TUTEE.) (Prb2ri .Meepting City Engine Report - Final Co11 er of, Springet Drive By the City Couma(l ofnw Cita of Bawer: ORDERED, THAT the attached report of the City Engineer relative to the final coat of the installation of a street light system on Springer Drive extending approxi - merely 1,200 feet east from Hogan Road be and hereby is accepted; and be it further ORDERED, THAT the assessment for said installation be levied as noted therein; and be it further ORDERED, THAT the sum Of Eight Thousand Nine Hundred Dollars ($8,900.00) be trans- ferred from the General Reserve Fwd for Future Construction to Account No. 52-60-20 (5224) to cover the cost of the street light installation. 87-116 In City Council March 23,1987 ! 0 R D E R refer to finance committee ? Title, consider next meeting' Accaptir,g City Enginee Ns report .:.................................... final coat of Sgeioder Drive Streatagating City Clerk Introduced nd filed by Councilman In Ciiy Council April 1.5,1987 Passed y C;e 87-116 CITY OF BANGOR, MAINE Engineering Department To the Municipal Officers: March 17, 1987 Reference is made to City Council Order No. 85-370 passed October 26, 1985, authorizing the installation of a street light system on Springer Drive extending approximately 1,200 feet east from Eagan Road. The original installation was petitioned for by the Springer Realty Company, since the Bangor Hydro-ElectrfC Company did not locate a pole line within the Springer Drive right-of-way. All work has been completed, including the installation of one wood pole and seven aluminum poles with concrete bases, and approximately 1.200 feet of underground conduit and wire, rata total cost, including engineering. of $8.900.00. This is somewhat in excess of the original estimate of $6.900.00, primarily due to severe weatber conditions during the time of Installation in November and December of1985. It was originally anticipated that the previous project budget which was established for the construction of the Springer Drive roadway and sanitary sever, by Council Order No. 85-183 passed May 13, 1985, would be sufficient Locover the additional cost of the street lighting, so that no additional appropriation was made: however, the bids received for paving were higher than anticipated, so that the original budget was exhausted. Accordingly, an additional appropriation of $8,900.00 will be required to cover the lighting oat, with fifty percent. or $4,450.00 to be reimbursed to the City by an assessment against Springer Malty Company. Respectfully submitted, ��lCity Engineer