HomeMy WebLinkAbout1987-03-09 87-107 ORDER87-107
Introduced by Councilor Tilley, March 9, 1987
_ CITY OF BANGOR
(TITLE.) (orbs Authorizing City Manager to Enter. into Contract with Webster-
B ldw n, -R M1 U,y Cz,explEckl N&28LReCke. Egerstgtinn Study _... ..........__
By the City Cmunuid of the My OfBanpor:
ORDERED,
MT the City Manager be and hereby Is authorized to enter into a
Contract with Webster-Baldwin-ROM1man-Day-Crarnieckf of Bangor, pairs for
a study to determine the coat of restoring the Watezworks buildings, a copy
of said Contract being on file in the City Clark's Office, subject to the
approval of. the Contract by the State Planning Office.
STATEMENT OF FACT:
This project is pati of a $26.000. Coastal Zone Management Project
which has been previously funded. Mis Contract provides for a study of
the cost of restoring the existing buildings at the Waterworks, the cost
of said study not to exceed $7,000. Twenty percent of the total project
coat has been funded locally.
87-107
ORDER
Title,
Authorizing City Meager to enter into
.................................... 4.
a Contract with Webster - Baldwin - Cvaznieoki
......................................
Ne tereorks restoration stuffy
Introduced and filed by
..... ...ee4 ....
cuncibnan
In City Cwmil larch 9,1987
Paeaed
City
IN3P
ts°
67-107
44 centra Baldwin aohmamangor, maine 04401. architects engineers
44cemra streetBaldwin
baay-car, iecki, 01 architects
engineers
principals aUn t. Wldwin john m. mhman hoben w. de, nkM1aelL aamiecki
azmmms siepM, b. rich alanc bwmley wa0er e. bensman richartl 1. roll....
February 6, 1987
John Frawley, City Engineer
Engineering Department
CityofBangor
73 Harlow street
Bangor, Maine 04401
RF,: Waterworks Restoration Study
Dear John:
In response to your recent telephone conversation, we would be
pleased if renuested to provide only the restoration portion of the
Waterworks Buildings Project. As mentioned in our proposal, we
would propose an hourly billing with the rates as indicated. A
reasonable range of cost for the services as mentioned in your RPP
for this phase would be $9,000.00 $8,000.00.
In addition we would be glad to act as a Consultant for a second
group that may be selected for the reuse portion of the overall
project.
Again, thank you far the Interest shown in our firm