Loading...
HomeMy WebLinkAbout1987-03-09 87-107 ORDER87-107 Introduced by Councilor Tilley, March 9, 1987 _ CITY OF BANGOR (TITLE.) (orbs Authorizing City Manager to Enter. into Contract with Webster- B ldw n, -R M1 U,y Cz,explEckl N&28LReCke. Egerstgtinn Study _... ..........__ By the City Cmunuid of the My OfBanpor: ORDERED, MT the City Manager be and hereby Is authorized to enter into a Contract with Webster-Baldwin-ROM1man-Day-Crarnieckf of Bangor, pairs for a study to determine the coat of restoring the Watezworks buildings, a copy of said Contract being on file in the City Clark's Office, subject to the approval of. the Contract by the State Planning Office. STATEMENT OF FACT: This project is pati of a $26.000. Coastal Zone Management Project which has been previously funded. Mis Contract provides for a study of the cost of restoring the existing buildings at the Waterworks, the cost of said study not to exceed $7,000. Twenty percent of the total project coat has been funded locally. 87-107 ORDER Title, Authorizing City Meager to enter into .................................... 4. a Contract with Webster - Baldwin - Cvaznieoki ...................................... Ne tereorks restoration stuffy Introduced and filed by ..... ...ee4 .... cuncibnan In City Cwmil larch 9,1987 Paeaed City IN3P ts° 67-107 44 centra Baldwin aohmamangor, maine 04401. architects engineers 44cemra streetBaldwin baay-car, iecki, 01 architects engineers principals aUn t. Wldwin john m. mhman hoben w. de, nkM1aelL aamiecki azmmms siepM, b. rich alanc bwmley wa0er e. bensman richartl 1. roll.... February 6, 1987 John Frawley, City Engineer Engineering Department CityofBangor 73 Harlow street Bangor, Maine 04401 RF,: Waterworks Restoration Study Dear John: In response to your recent telephone conversation, we would be pleased if renuested to provide only the restoration portion of the Waterworks Buildings Project. As mentioned in our proposal, we would propose an hourly billing with the rates as indicated. A reasonable range of cost for the services as mentioned in your RPP for this phase would be $9,000.00 $8,000.00. In addition we would be glad to act as a Consultant for a second group that may be selected for the reuse portion of the overall project. Again, thank you far the Interest shown in our firm