HomeMy WebLinkAbout1987-03-09 87-95 ORDER8]-95 Introduced by Councilor Sullivan, march 9, 19S7 CITY OF BANGOR (TITLE.) 4111YGrt _._Atueptm% Clty_EnEineer's RepPFR. -,Final Gast of. SprIpmar _.. U[ive„Rppp nd Se016arg Sevec.Lonatructioa ......... _._ ........... BY die Cup Cwxnt Of the City OfBanner: ORDERED. THAT the attached report of the City Engineer showing the final costa of the construction of the Springer Drive roadway, storm sever and sanitary sewer construction. be and hereby is accepted; and be it further ORDERED, THAT payment of the City's share In the amount of $63,475.00 be made to Shaw's Supermarkets, Inc. STATEMENT OF PACT: The City agreed to pay fifty percent of the cost of the road and severs by Council Order No. 85-183 passed May 13, 1985, based upon the lowest bid received by Show's, or the City Engineer's estimate, whichever was lower. The total City's share based upon the actual bids received was $64,503.50. CITY OF BANGOR, MAINE Engineering Department Hatch 2, 1987 To the Hunicipal officers: Reference is made to City Council order No. 85-183 passed May 13, 1985, authorizing City participation in the cost of construction of the Springer Drive roadway and sanitary sewer, extending northeast from Hogan Road. All work has been completed, which consisted of the construction of approximately 1,200 feet of roadway extending easterly from Hogan Road on the north side of Interstate Highway I-95, and the extension of sanitary sewer service from the terminus of the existing sewer on Hogan Head. , . Me roadway was constructed with a paved width of 40 feet for approximately 400 feet east from Hogan Road, from which point the paved width is 32 feet, with an a -foot wide gravel shoulder on the southerly side. An asphalt island with granite curbing was constructed at the intersection of said road with Hogan Road. The roadwaconsists of 3 inches of bituminous concrete surface on a 6 inch select gravel base and a 15 Inch sand and gravel subbase. Surface drainage is provided by catch basins along the northerly aide of the road, draining In a southerly direction toward interstate Highway I-95. The sanitary sewer extension consisted of the installation of 887 feet of 8 inch ductile iron pipe and 3 manholes, extending easterly from Hogan Road to a point near the terminus of Springer Drive. Total Actual Cost Original Estimate Road Construction $105,152. $103,850. Sanitary Sewer 23,855. 23,100. Total A29,007. $126,950. Under the terms of Council Order No. 85-183, the City agreed to pay fifty percent of the cost based upon the lowest bid received by Shaw's, r the CICitya Engineer's estimate, whichever was less. nerefore, the City's participation would be based upon 50% of theCity Engineer's original estimate, or $63,475.00. Shaw's Supermarkets, Inc. have submitted a detailed breakdown of all of the costs pertaining to the road and sewer construction, which have been rified by the James W. Sewall Company of Old Town. Accord- ingly. 1t is i ended that the City reimburse Shaw's in the amount of $63,475.Do in accordance with the berme of the original agreement. Plane showing the road and sewer construction are on file in the City Engineer's office. Respectfully submitted,4nk /; ,t1 Y Hlje In City Council March 9,1987 Pa d C1 Clerk �Y 87-95 ORDIR Title, Aacepti� City Engireer's report Final` Cost of Springer Drive road and sanitary ..............tion.................... sever const ellen Introducceed� and filed �filleedd by Councilmen a, Ap !r9 z gFgcc 91 nle9,iP gFgp