Date October 24, 1988 Item No.—Aa-A-4.5
Item/SubjeoC Authorizing City Manager to Enter into a Contract with
Casey 6 Godfrey - Pavement Evaluation Survey
Responsible Department: 1, Engineering
. Commentary:
Casey d Godfrey have been hired by BACTS to do a pavement evaluation study
of all Federal roads within the City of Bangor, to be funded through MOT with
Federal funds. Installs an opportunity to have the Consultant also do the
remaining local roads ata cost estimated not toe eed $7;000.00. Lt would
be beneficial to have the local road survey done by the same Consultant to
be
consistent with the criteria used for the Federal roadsurvey, and the
resulting data will be used' to establish a computer program for establishing
afuture maintenance program.
Oepmiment Held_
Manager's CommentrC, � A t✓ 1 a
. F�
4m
Associated Information:34
Budget Approval: JR
11bt. ron'.e Fi.+J� Fine get
Legal Approval:
etry 5alrerrw
Introduced For
Dt
FirsReading Page_ of
fe Reading
Referral
88-445
ArignN to Cw«eH« Tilley October 24, 1988
CITY OF BANGOR
(TITLE.) @rbtrf n.on i3ng City Mager to Enter into, a Contract with Casey a
By the Cifp Cweaii Nae Glty ofDanw.
ORDERM,
TUT, WHEREAS, the Bangor Area Comprehensive planning Study will Include
aFederally-funded pavement evaluation serves of all Federal roads within the
limits of the City of Bangor under a Contract with Casey 6. Godfrey, Consulting
Engineers fran:.Gardiner, Maine, which will be used as a basis for prioritizing
improvemenis to Federal roads within the City as part of the RACTS program: and
WHEREAS, it would be in the interests of the City to extend thesurvey to
include all local roads, to be used a a basis of establishing the City's annual
street improvement program: and
WHEREAS. Casey 6 Godfrey have indicated a willingness to submit a proposal
to extend their survey to include local roads. the cost of which would be borne
by each of the participating communities;
NOW, THEREFORE. Be It
ORDERED., THAT the City Mager be and hereby is authorized to accept a
proposal £fom Casey 6 Godfrey not to exceed p7.000.Oo to undertake said study
to include the remaining streets in the City of Bangor; and be 10 further
ORDERED, THAT the coat of said study be included in the present appropriation
for Street Imptovements, Account No. 52-60-20 (5097).
Iv City Council October 24,1988
Passed
4'
ty k
88-445
ORDER
11 Title,
Autbori¢ing City Manager to Enter into
......................................
contract with Casey & Godfrey Pavenex2
Evaluation Sury
.......... moi .....................
cA
Cumignedto
..Co�nilman