'Date 10/24/88 Item No. 88-444
Item/Subject: Springer Drive Sewer Extension
Responsible Department engineering
Commentary:
The Liberty Group of Portland, under a corporation know as Stillwater
Avenue. Lead Associates. is proposing to construct a 56-lot commercial
ial
subdivision n the former Babcock Palm located northeast from the end
of Springer Drive, which is located approximately 1.500 feet northeast
from the present terminus of the sanitary sewer
n Springer Drive.oand
which will also require an additional 1,600 feet of "s extending
across their site which could. eventually beveitendei'm serve the Chase
Road - Stillwater Avenue area. Since the subject sewer requires the
crossing of land owed by others, and since it follows the route
previously proposed by the City for the eventual a we irextension
to the Chase Road area, the a should be c nsidered as eventually part
or the City) sewer system. Before the developer can get preliminary and
final subdivision plan approval from the PlanningBoard, the Board will
have to be assured that the City sever
will be extended a ary to
serve the project, which will require the crossing of property owed
by others;
This Resolve does act remit the City to pay for any po if of the
construction. which is part of a previous Council
Order, wherein a cost study is presently being a Deportment Hmd
Manager's COmmenie:
*undertaken: it is merely to Insure that the developers can have access
to the public sewer system, and to satisfy the Planning Board that such
provision is being made.
coy'""'S"
Associated Information;
Budget Approval: N ,
Picasso Dvactu
Legal Approval:
CirySolivitm '
Introduced For
®passage
O First Reading Pop _of_
❑Referral -
Passed as amended 10-24-88
86-444
Assigned to Councilor Tilley, October 24, 1988
3 OF •
(TITLE.)*.. Springer Drive Sever Bxte1 11naion
By the cup camadl afthe MYof11anper:
B L"D, TRAT, WBSRP.AS, Stillwater Avenue Land Associates of Portland,
Maine is preparing to submit a preliminary plan of a commercial subdivision
to the Bangor Planning Board, said subdivision located approximately 1,500
feet northeast from the present terminus of the City sever system on Springer
Drive; add
WHEREAS, said commercial subdivision will require an extension of the
City sanitary sewer system; add
WHEREAS. the location of said sanitary sewer s proposed on the preliminary
subdivision plan coincides with a preliminary location of the sanitary sever
system previously established by the City Engineering Department, which will
provide future service to the Chase Road and Outer Stillwater Avenue area. and
WHEREAS, thePlanningBoard will require assurance from the City Council
that the City sewer system will be extended as show on maid plan when the
subdivision is constructed;
NOW, THEREFORE. Be It
RESOLVED. THAT the City Council hereby agrees that the proposed sever layout
e shown on a plan prepared by Webster-Baldwin-Rohman-nay-Cxarnieckientitled
as
Park. Bangor, Maine" Plan No. C-1 Revised September R). 1980 would
constitute an extension of the City sewer system, and would be laid out and
constructed by the City of Bangor or St's agents, subject to the condition that
A'8'.XA�TE :BEIh'F9ip:
o
The City is nott committed
mitted to contribute tweed any cost of said sever at this
time
08-444
Assigned to Councilor Tilley, October 24, 1988
CITY OF BANGOR
(TITLE.)iesulba springer Drive sewer Extension
y_ ............. ............ ... ___... ..._..._.._._.._........... _._.._......_.._.._..
av Ne city ConnN o(Ne afy ofaaepr.
aaaOLVKA THAT, WHEREAS.:Stillwater Avenue Land Associates of Portland,
Maine is preparing to submit a preliminary plan of a commercial subdivision
to the Bangor Planning Board, said subdivision located approximately 1,500
feet northeast from the present terminus of the City sewer system on Springer
Drive; and
SIEMENS. said commercial subdivision Will require an extension of the
City sanitary sewer system; and
WHEREAS, the location of said sanitary e s proposed on the preliminary
subdivision plan coincides with a preliminary location of the sanitary sewer
system previously established by the City Engineering Department, which will
provide future service to the Chase Brad add Outer Stillwater Avenue area, and
WHEREAS:. the' Planning Board will require assurance from the City Council
that the City sewer system will be extended asshown on said plan when the
subdivision is cons M Brad;
NOW, THEREFORE, Be It
RESOLVED, THAT the City Council hereby agrees that the proposed sewer layout
as shown o a plan prepared by Webster-Baldwin-Rnbman-Day-Csarnlecklentitled
Stillwater Park, Bangor, Maine" Plan No. C-1 Revised September 27, 1988 would
constitute an extension of the City sewer system, and would be laid out and
constructed by the City of Bangor or it's agents, subject to the condition that
the City does not commit to contribute toward the cast of construction of said
sewer at this time.
88-444
E E 5 0 L VE
�'-Id lty:'-Connell October 24,1988 springer Drive sewer Extension
.Amended need Passed
Amended in the Zed to last line
The City Isnotcommitted to contribute
toward any cost of said sewer at ^ ^'
this time