HomeMy WebLinkAbout1988-09-26 88-414 ORDERData 9/26/88 fleet No.88-414_
Item/6ubjecL Authorizing City ravager to Enter into Agreement with Wright &
Pierce - Meadowbdook Sewer System Evaluation and Design
Responsible Department: Engineering
Commentary:
This work is necessary to fulfill auportion of our obligations
under the Consent Decree with the Maine Department of Environmental
Protection. The Meadwbrook Sewer System evaluation will develop a
long-range strategy for the separation of atormwacer from the system.
so as to eventually eliminate the periodic overflow of combined sewage
Into the Kenduskeag Stream. The final design of the Meadowbrook log
diversion is also a condition of the Consent Decree, the construction
of which must be completed by December 1, 1989.
IXpartnoa Heed
Manager's Command:.. I /I Igbag�,I
o n
orm,
Associated Information:
Budget Approval: jysna fri&ek idD
_"Yt
Legal Approval:
Introduced For -
®Paauge
❑First Reading Paga_of_
❑ Referral
88-414.
Aoipted to Cm,mdar Tilley September 26, 1988
CITY OF BANGOR
(nTLE) (0Thri Authorizing City Manager to Enter into Agreement With
_Wright. i.Pferce.-. MeadmAroek.. Sewet.System..E.valuation. and Design .1 ......
By the City Counou of the City ofBa*ae!:
ORDEnD, -
TUT the City Manager be aW hereby is authorized to enter into
an Agreement
with Wright -Pierce, Inc. of Topsham, Maine for consulting
engineering
s
s relating to the evaluation of the Meadowbraok Storm
Sewer System, including the preliminary and final design of a stormwater
diversion line from the Meadowbrook Bag area to Rendunkeag Stream., a copy '
of. said: Agreement being on file in the City Clerk's Office.
88-414
ORDER
In City Cwncil Sepi be 26, f988
Passed Title,
AutFprizitvj city Manager toF ter. into
Agreement with Wright S Pierce Meador i
Ci Clerk
S tan lyati
d' A mp" to
.... r' .T .........
�J Councilman