HomeMy WebLinkAbout1988-05-09 88-221 ORDER' Date a/Z/Rf Item No. 88-221
Item/Subject: Authorizing City Mangler to Enter into an agreement with Civil
Engineering Services - Old Capelort Sever System.
Responsible Department: Engineering
Commentary:
As part of our sewer rehabilitation program as required by our agreement with
the Maine Department of Environmental Protection. It is necessary that w
Investigate the a system in the Old Capehararea. There has been
'history of sewer backup and street flooding in that area,
s and it i obvious
that the system 1s in need of rehabilitation work. Aprevious contract has
been let for N inspection of this system. _
It is proposed to contract directly with Civil Engineering Services of Brewer
for this project, since they performed an
earlier study for the Bangor Housing
Authority, and aye quite familiar with the system. This is not only considered
to be the most cast effective approach. but should permit us ' to undertake
m
construction work this year because of the "head start'that they have
on the system evaluation.
I
purtment Heed
Managers Comments: ITh uoo, nL.Z"J'ad yS-NFwr'' LCaaoo "7tk�
was Base.. 14 Fvront
a..a,ea, �A�a
n1ti .eaq4; ^.trU" sess,
,rL 4aag P�NWa�O�4 On c4monswBn
Attocieied Information:Onet
Budget Approval: /jy[Tp Lam. pW�q,
D_ ,_ Fina ee t)irc
Legal Approval:'TIs. Pea.rr+..'! sr s;eU ca $eik j.M.
eketorae 'a z7o.Q a ...� 7 (� .� r4 CX
t t,O:N' Qu...b.:.,a pee„�hat ry r<ran
In ydaa ed For
mLf] Referral ❑ Referral
Page_ o
88-221
Introduced by Councilor Tilley, May 9, 1988
:, CITY OF BANGOR
(TITLE.) giber, nutha i ing City Man g r to Enter into n Agreement with
Civil E_j1 of Eervi Old Capshart. SeverSystem
By the Ciey Caused eft1e Cita o(Banger:
ORDE"D, - -
TMT, WHEREAS, there are numerous problems with the existing atom
and sanitary sewers in the Old Capehart area,
resulting in street flooding
and the overloading of the system during atom periods; and
WHEREAS, there are indications that the existing sanitary system receives
considerable amount of storm flow through groundwater infiltration and surface
Inflow; and
WHEREAS, Civil Engineering services of Brewer have conducted previous
investigations of portions of the system under a contract with the Bangor
Housing Authority which have made them familiar with many of the problems
with the sewer system; and
WHEREAS, it is considered necessary as part of the City's overall program
of a rehabilitation program for the 1988 season to develop plana for remedial
actionpertainingto said sewer system;
NOW, THEREFORE, Be It
ORDERED, THAT the City Manager be and hereby is authorized to enter into
contract with Civil Engineering Services dated April 25. 1988, a copy of which
1s on file 1n the Office of the City Clerk to develop a remedial action plan for
the Old Capehart area sewer system.
88-221
IN CITY COUNCIL O R D E R
May 9, 1988
Pa d Title,
C
e � .YfYG1145}i}08.Ce}GY .N1v9i8Ri .GR ..Q9G4C ...
.}R44%R ABi94R4R4.Y{5h .G{??{ E96}944T.1ne
Services - Old Capehart Sewer System
Introducedandfiled by
unciLnan