Loading...
HomeMy WebLinkAbout1988-05-09 88-221 ORDER' Date a/Z/Rf Item No. 88-221 Item/Subject: Authorizing City Mangler to Enter into an agreement with Civil Engineering Services - Old Capelort Sever System. Responsible Department: Engineering Commentary: As part of our sewer rehabilitation program as required by our agreement with the Maine Department of Environmental Protection. It is necessary that w Investigate the a system in the Old Capehararea. There has been 'history of sewer backup and street flooding in that area, s and it i obvious that the system 1s in need of rehabilitation work. Aprevious contract has been let for N inspection of this system. _ It is proposed to contract directly with Civil Engineering Services of Brewer for this project, since they performed an earlier study for the Bangor Housing Authority, and aye quite familiar with the system. This is not only considered to be the most cast effective approach. but should permit us ' to undertake m construction work this year because of the "head start'that they have on the system evaluation. I purtment Heed Managers Comments: ITh uoo, nL.Z"J'ad yS-NFwr'' LCaaoo "7tk� was Base.. 14 Fvront a..a,ea, �A�a n1ti .eaq4; ^.trU" sess, ,rL 4aag P�NWa�O�4 On c4monswBn Attocieied Information:Onet Budget Approval: /jy[Tp Lam. pW�q, D_ ,_ Fina ee t)irc Legal Approval:'TIs. Pea.rr+..'! sr s;eU ca $eik j.M. eketorae 'a z7o.Q a ...� 7 (� .� r4 CX t t,O:N' Qu...b.:.,a pee„�hat ry r<ran In ydaa ed For mLf] Referral ❑ Referral Page_ o 88-221 Introduced by Councilor Tilley, May 9, 1988 :, CITY OF BANGOR (TITLE.) giber, nutha i ing City Man g r to Enter into n Agreement with Civil E_j1 of Eervi Old Capshart. SeverSystem By the Ciey Caused eft1e Cita o(Banger: ORDE"D, - - TMT, WHEREAS, there are numerous problems with the existing atom and sanitary sewers in the Old Capehart area, resulting in street flooding and the overloading of the system during atom periods; and WHEREAS, there are indications that the existing sanitary system receives considerable amount of storm flow through groundwater infiltration and surface Inflow; and WHEREAS, Civil Engineering services of Brewer have conducted previous investigations of portions of the system under a contract with the Bangor Housing Authority which have made them familiar with many of the problems with the sewer system; and WHEREAS, it is considered necessary as part of the City's overall program of a rehabilitation program for the 1988 season to develop plana for remedial actionpertainingto said sewer system; NOW, THEREFORE, Be It ORDERED, THAT the City Manager be and hereby is authorized to enter into contract with Civil Engineering Services dated April 25. 1988, a copy of which 1s on file 1n the Office of the City Clerk to develop a remedial action plan for the Old Capehart area sewer system. 88-221 IN CITY COUNCIL O R D E R May 9, 1988 Pa d Title, C e � .YfYG1145}i}08.Ce}GY .N1v9i8Ri .GR ..Q9G4C ... .}R44%R ABi94R4R4.Y{5h .G{??{ E96}944T.1ne Services - Old Capehart Sewer System Introducedandfiled by unciLnan