No preview available
HomeMy WebLinkAbout1988-04-25 88-203 ORDEREme 4/25/88 Item No. 88-203 Authorizing Execution of Agreement for Consulting Item/Subjat: Services - Covering Walkway and Parking Garage Connection Responsible Department: Planning Commentary: The covering of the walkway -is not part of the parking garage construction project. However, the feasibility of covering the walkway and its interconnection must be determined immediately in order to make certain that the garage is built properly to accommodate it. ewt xeee Manager's Comments: —fit te v�-dQU� tm f.�A✓ M--a"y".u-..-wa p.R �Mumi3„-.Tt, QuJ�'w�eQi,d.�.a .. ... Cj.•.7a. Tu..a.a a 4 t ti,� City Mawger Aasaiatetl lnformatipn: p,ga„r p.7$ �,a,., q,q,.,dee,�,�„� Budget Approval: - Fiwvee Dvenor Legal APProval: City sawisor Introduced For Passage First Reading Pap — of ❑ Referral 88-203 Introduced by Councilor Tilley, April 25, 1988 CITY OF BANGOR (TITLE) MfUr Autho i ng. Execution of AgreM=t for Consulting Services - Covering Walkway and Parking Garage Connection ......... ........- ..... _. _._ ........... ..._... By 016 Cite CUYfbH of CUP ofBaroor: THAT WHEREAS, the City Council has authorized the City's. parking consultant, Rich and Associates, Inc. to prepare complete construction documentsand specifications for the construction of the proposed downtown parking garage; and WHEREAS, the proposed parking garage is to be connected with the Pedestrian Bridge over the Kenduskeag Stream and this bridge is to be covered to protect users from adverse weather conditions. NOW, THEREFORE, BE IT ORDERED BY THE CITY COUNCIL. OF THE CITY OF BANGOR THAT the City Manager, on behalf of the City of Bangor, is hereby authorized to execute an Agreement between the City of Bangor and Rich and Associates, Inc., the terms and conditions of which are to be approved by the City Council Finance Committee which provide design services for covering the walkway and connecting it to the parking garage. 88-203 ORDER IN CITY COUNCIL April 25,-1988 Title, Pas @ecbeiiz le6.lkececiam.e£.Aeieemeot .£mi CiLD CLEHR 6em691t30B.$eiY3GGS.:.9QYei30B .WelkeeY and Parking Garage Introduced and filed by m/ ..... ... ...1 Councilman N sl 9 FRICH AND ASSOCIATES, INC. 88-203 ARCHFECTURE • PARKING CONSULTANTS • ENGINEERING 25X0lAHSER ROAD • SOUTHFIELD, MICHIGAN 48030 13131363-5080 March 16, 1988 Mr. John Lord - Planning Officer - City of Bangor City Hail 73 Marlow Bangor, Maine 06601 Re: Proposal to provide preliminary design and study for pedestrian bridge modifications. Dear Mr. Lord: As par your request, I have prepared this letter as a proposal to provide a preliminary design feasibility study and cost estimates for modification to the existing Menduskeag pedestrian bridge to include an entry into the proposed Plaza Parking Structure and .bridging over to the existing Freese's building. Our study will include looking at design implications .for completely covering the existing bridge as well as any extensions to the bridge and will also include cost estimates for same. Another aspect of the study will look at preliminary design Implications for expanding the existing bridge In the Freese's building to include coat estimates, time schedules and different options for design. Our proposal for this work will be on a time basis, not to exceed $15,000 not including reimbursed expenses which will not exceed $1,000. Since i will be able to incorporate trips on the bridge project with the parking deck, the reimbursed expenses will be kept to a minimum. We look forward to beginning this project and would complete a preliminary report within two weeks and would expect a final report a week after. Sincerely, t char` d A Nlch Vice President FEASIBILITYGTUOIES • FUNCTIONALOESIGN • PARKING SECURFIY PLANNING • SITEPtANNING HOBPITAL PARKING PLANNING • DESIGMSUILG 4 DEVELOPMENT& FINANCING THROUGH MEOPARK, ING OPEPATINGSTUDIES • PROFESSIONAL PARKING MANAGEMENT THROUGH PAN AMERICAN MANAGEMENT INC.