CITY COUNCIL ACTION 05/14/2018 18-191
Council Meeting Date: 05/14/2018
Item No: 18-191
Responsible Dept: Engineering
Requested Action: Order Map/Lot: N/A
Authorizing Execution of Agreement for Maine Department of Transportation Local Project - WIN 20895.00
Modification #2, Ohio Street and Fourteenth Street Intersection Improvements
Summary
This Order will authorize the City Manager to execute a Local Project Agreement Modification #2
with the Maine Department of Transportation to provide additional funding for intersection
improvements at Ohio Street and Fourteenth Street.
On August 28, 2017 under Council Order #17-306, the City Manager was authorized to enter into an
agreement for design of the replacement of traffic signals, installation of pedestrian signals,
rehabilitation of sidewalks and sidewalk ramps, and adjustment of the turning radius.
Modification #2 would increase the funding by $11,062.50 bringing the total project cost to
$222,000. Additionally, it would modify the contract to reflect the State/Federal share of 90% or
$199,800.00 and the City's share of 10% or $22,200.00.
Committee Action
Committee: Infrastructure Committee Meeting Date: 05/08/2018
Action: Recommend for passage For: 5 Against: 0
Staff Comments & Approvals
Agreement Attached.
clt�`!�)kM D `"
City Manager
Introduced for: Consent
20K
City Solicitor
(b�-ts—
Finance Director
CITY OF BANGOR ORDER
Date: 05/14/2018
Item No: 18-191
Assigned to Councilor: Perry
05/14/2018 18-191
Authorizing Execution of Agreement for Maine Department of Transportation Local Project - WIN 20895.00
Modification #2, Ohio Street and Fourteenth Street Intersection Improvements
Be it Ordered by the City Council of the City of Bangor that,
the City Manager is hereby authorized and directed to execute an agreement Modification #2, funding
increase with the Maine Department of Transportation for WIN 20895.00 Ohio Street and Fourteenth Street
Intersection Improvements.
MaineDOT
1.8...1.91.
�MAY 1.4, 201.8
MaineDOT use only
AMS ID: CTM20160523000000000739
CSN: 35956
TEDOCS #:
PROGRAM: Multimodal (OUC 57000)
MAINE DEPARTMENT OF TRANSPORTATION
Modification 2 to a Locally Administered Project Agreement
With the
City of Bangor
Regarding
Improvements to the Intersection of Ohio Street and 14th Street
Modified Total Amount: $222,000.00
Federal Share: $177,600.00
State Share: $22,200.00
Local Share: $22,200.00
Agreement Begin: May 13, 2016
Agreement End: May 31, 2021
MaineDOT Use Only
MaineDOT WIN: 20895.00
Federal Project #: STP -2089(500)
Federal Authorization Date: April 14, 2016
Bangor's Vendor ID: VC1000007010
Bangor's DUNS® Number: 07-173-9692
CFDA #20.205: Highway Planning & Construction
This Modification 2 shall apply to an Agreement with the City of Bangor that was executed on
May 13, 2016 and was modified previously on September 13, 2017. This modification, when
executed, will increase the Agreement by $11,062.50 - to a new total of $222,000 - to reflect
the latest estimate for the Project, as shown below:
ARTICLE 1 - PROJECT OVERVIEW
Section 1 B, "FUNDING," shall be modified to read as follows: BACTS programmed two
hundred twenty-two thousand dollars ($222,000.00) for the Project to be shared as set forth in
Article 3, "Financial Provisions." Project costs exceeding this amount shall require approval
from BACTS and MaineDOT to be eligible for state and federal funding.
ARTICLE 3 - FINANCIAL PROVISIONS
Section 3A, "MAINEDOT SHARE," shall be modified to read as follows: MaineDOT, using
federal and state funding programmed by BACTS, will share in the cost of the Project at the
rate of ninety percent (90%), up to a maximum of one hundred ninety-nine thousand eight
hundred dollars ($199,800.00).
Section 3B, "LOCAL SHARE," shall be modified to read as follows: The City shall share in all
federally eligible Project costs at the rate of ten percent (10%), or an estimated twenty-two
thousand two hundred dollars ($22,200.00). Furthermore, the City shall be fully responsible for
expenditures:
1. Incurred before the date of Notice to Proceed;
2. Deemed ineligible for federal financial participation; and
3. Exceeding the upset limit of this Agreement, as set forth in Section 1 B, "Funding."
City of'Bangor: Agreement Modification 2, WIN 20895.00 Page I of '2
All other terms and conditions of the original Agreement shall remain in place with no gap.
MaineDOT and the City of Bangor, by their duly authorized representatives, have executed
this latest modification to the original Agreement on the date last signed below.
City of Bangor
Catherine M. Conlow, City Manager *
Date:
Maine Department of Transportation
Jeffrey Tweedie, Program Manager*
Multimodal Program
Date:
* I certify that the foregoing signature is true and accurate. I further certify - pursuant to 10 M.R.S.A. §9407 and §9502
- that the signature, if electronic: (a) is intended to have the same force as my manual signature; (b) is unique to me;
(c) is capable of verification; and (d) is under my control.
City of Bangor: Agreement Modification 2, WIN 20895.00 Page 2 of 2
IN CITY COUNCIL
MAY 14, 2018
CO 18-191
PASSED