Loading...
HomeMy WebLinkAbout1989-09-25 89-395 ORDERDate 9/25/89 v Item No. 89-395 Item/Subject: Authorizing Amendvent to Contract with. Wright -Pierce - Meadowbcook Sewer Responsible Department: Engineering Commentary: The original misign Contract envisioned the design of a separate storm sewer to carry the atom water from the Meadowbrook Bag to the Nenduskeag Stre however. during the design process. it was determined to be more feasible in the long run to design a new sanitary sewer, and to keep the storm water in the existing s c This necessitated additional design work. Also, the original Contract's cope of work did not include the design of the inter- state crossing, which x111 be made by modifying the existing 24 inch combined sewer under I-95 by installing a 12 inch sanitary sewer within the pipe, and r by designing and constructing special structures at either end to connect the sanitary live into the new sanitary sewer. 11pe.origiral Contract did not includeservices during construction. Ic was decided to do the inspection in-house, but it is felt to be necessary to utilize the Consultant in limited contract administration, including monthly meetings, the review of shop drawings, and the preparation of as -built drawings. ' pnnmana xud Managers Comments; uoe �b-etM1 �lY a-n46E ^4i�lasiea 00 tv�Y AlawXr Associated Information: q /. Budget Approval: m a0i.e Legal Approval �n . r Cn soli..tor ' duced For Passage L�First Reading Page _ of ❑Referral 89-395 Aesignedto Councilor Tilley. September 25, 1989 u j CITY OF BANGOR I (TITLE.) Mrbkrr Auchoriting Amendment to Contract with Wright Pierce - Meadowbmok Sewer By dw Citta Cwneit of W City ofBeepor: TI4T, PEERESS, the City of Bangor has previously entered into a Contract with Wright -Pierce, Consulting Engineers for design services relating is the reconstruction and separation of a significant portion of the so-called Meadowbrook Sewer, extending from Kenduskeag Stream to the vicinity of interstate I-95 and Stillwater Avenue, said Contract dated October 6, 1988; and WHEREAS, additionaldesigns a have been required, including the crossing Of Interstate I-95, obtaining test borings, and designing nurhrous vet weather overflotratructures, at an additional design coat of $45,000.00; and WRESTS S, it has been considered desirable to retain the limited services of Wright -Pierce through the bidding and construction phase of the project at a coat act to exceed $25,500.00; BOB, THEREFORE, Be It ORHEREO, THAT the City Manager be and hereby is authorized to execute Amendments to said Wright -Pierce Contract for additional design and services during construction not toexceed $)0,500.00, said additional cost to be charged to the Meadbwbrook Sewer project, Account No. 52-60-20 (5268). 89-395 In City Council September 05,19896 0 R 0 E R Passed Title to Contract with Authorizing Mandan crack i...... Pierce Neadw Mack Scaer Cityleek ...................................... ..........A^/.........//.................. M. �yy�..p: Aamped to Councilman