Loading...
HomeMy WebLinkAbout1989-09-25 89-394 ORDER�11,Un Date 9/25/89 Item No. 89-394 Item/Subject: Buthorizing Ameeement to Contract with Woodard 6 Curren, Inc. - Consulting Engineer Seetices on Secondary Treatment and Sewer Rehab. Responsible Department: Engineering Commentary: This work'iaeary to car" the Secondary Treatment project through the selection of aDesign Engineer. Further tasks will Involve the negotiation of a design Contract, probable upgrading of our Sewer System Evaluation Study, and passible other basks during the design and construction phases,; which cannot be defined at the present time. Manager's Comments: PUA)kswnI&A AW" 2,/r[iLMi�(f 61144✓ City Alcm%er Associated Information: Budget Approval: /`' lA�'rta 1 ��„� �,pn,m / so... Legal Approval: CityCity smirltorr I�uOtuced For LJ Fissage rst Reading Page_ of ❑Referral 89-394 Amigadto Comeilw Tilley, September 25, 1989 CITY OF BANGOR (TITLE.) (Orba, ..-.Authorutug Amemdment to contract with Wnedara a„ Curran, Inc. - ConsultinjEagimeer Services on Secondary Treatment and Sewer Rehabilitation By the aV Couxeil of fir My ofBaagor: I ORDERED. TUT, WHEREAS, the City of Bangor currently has an ongofng Contract with Woodard E Curran, Inc., Consulting Engineers, forservices pertaining to the upgrading of the Bangor Wastewater Treatment Facility to provide secondary treatment, and WHER8As, additional services have been and will be required to continue the process of selecting a design firm for the Secondary Treatment Plant; NOW, THBREPORE, Be It ORDERED, TWAT the existing Contract with Woodard 6 Curran, Inc. be amended by providing for the fdllmmg additional services: 1. For continued negotiations on Consent Agreement issues with the Maine Department of Environmental Protection and the Environmental Protection Agency, an additional amount not to exceed $20,000.00. 2. ,Par assisting City Engineering Department personnel in the preparation and submission of a Facilities Plan as required by said Consent Agreement, including possible follow-up response, a am not to exceed $30,000.00. 3. For a detailed review of a design -build Proposal received from Infilcs Degremont. Inc.. including all necessary follow-up meetings, at an additional sum not to exceed $33,650.00. 4. For the upgrading of the City's Industrial Pretreatment Program to address concerns expressed by EPA, a sum nor to exceed $14.500.00. S. For assistance in the selection of a design firm for the upgrading of the Bangor Wastewater Treatment Facility to provide secondary treatment, an additional sum not to exceed $12,500.00. And be it further CREME, THAT the costs for said additional work be charged to the existing account for Secondary Treatment design, Account We. 52-60-20 (5308). 59-394 Ie City Council September 25, 1989 0 RDE R Passed `"--� Title, it Clerk Anthor$ing Ant toContrast ...................................... with IPo and s Curran Ina. Consulting ,engineer servciis, .. on eecgnam. T gatment M.�s}��f®� Reeha�bi li/t�ation j ......Cil..T� �p.'.'