HomeMy WebLinkAbout1962-10-22 256-P ORDERdeavodas 256-v
�7 y4le lnlroduced by Councilor Rramtae: Oct* 22: 1962
CITY OF BANGOR
(iI(TITLE.)VG
�pTjY¢x 1 .......... t ptsce rtf Cit Engineer Re: Proposed odlin Road Swear
.-Asp9
Y
BY tM City Counn! ofpw City ofBongor:
_ ORDERED,
THAT the attached report of .the. City Engineer at the proposed
Cd11n Road sewer north of the Interstate Highway be and hereby is
ac ented.
RECEIVE®
1962 CCT 18 N111: 61
CITY CLERK'S OFFICE
IN CITY COUNCIL
Cut. 22, 1962
Referred to Public Works Committee al
tabled by the following yes and no vote
Councilors voting Voi Bailey, Barry,
Brountas, Bram, gross, Higgins, Whittaker.
Councilors voting Put Blaisdell 6 brountas.
WWIYYkIliu WO0
MKWf-NF*LWT7:
IN CITY COUNCIL
Nov. 16, 1962
Taken from table, referred to Public Works
Committee, tabled.
IBM
,'%T67a N ,74
IN CITY COUNCIL
Nov. 26, 1962
Taken from table, City Engineer's report
read, referred to Public Works Cow liter,
tabled.
256-P
0RBRR
Title,
Report of City. Engineer Pa �.Ptopomed
(Alin Road Sexar
.....................................
Introduc9f and Piles
Co®o3�lmm�
IN CITY COIMCIL
Dec. lo, 1962
Taken from table, PASS®
CITY K
CITY OF BARGOR, MAINE
Engineering Department
Nov. 26, 1962
To: The Municipal Officers
Z�4,P
Pursuant to City Council Order 254-P, passed October 8,
1962, directing the Acting City Engineer to prepare plane and
coat estimates together with a list of possible assessments for
a new sewer to serve property on Odlin Road north of the Inter-
state Highway, a report wee submitted which provided for the con-
struction of 900 feet of sewer at a total estimated cost of eleven
thousand four hundred dollars (411,400). The main purpose of this
sewer is to serve a new Howard Johnson Restaurant on Odlin Road.
It has since come to the attention of this office that the
length of sewer required Is considerably lees than the original
proposal and, therefore, the following revised report is submitted:
The proposed new Installation will start at an existing manhole
on the Industrial Park trunk sewer on Odlin Head southerly of the
Interstate Highway and will extend in a northerly direction across
the Interstate Highway and along Odlin Road. Me installation will
require 660 feet of 8 inch vitrified clay pipe and two new manholes.
The total estimated cost of this installation amounte to nine
thousand sir hundred dollars({9,600) of which amount 75%9 or seven
thousand two hundred dollars ($7,200), may be assessed against the
property benefited. A list of possible assessments follows:
Possible
Name Parcel Frontage Assessments
WEST SIDE
State of Maine 1 350' 41,720.13
(non -assessable)
Barbara Simpson 1 280' 1,376.12
United States Gov't 1 100' 491.47
(non -assessable)
EAST SIDE
State of Maine 1 435' 2,137.88
(non -assessable)
Henry H, Page 1 300' 1,474.40
Upon completion of the revisions to the original design and
coat estimate, each of the atutting property owners subject to
assessment was advised of his proportionate share of the estimated
cost of the proposed sewer and "a requested to Indicate his approval
or opposition to the new sewer.
Parcels Total
Frontage Percent
In favor 1 300' 20.5%
Opposed 1 280' 19.1,%
No reply 0 0 0
Son -assessable 3 885' 60.4%
Inasmuch as the sewer Is necessary to serve a proposed new
restaurant which would be of benefit to the community, it is recom-
mended that the sewer be constructed. However, due to the approach
of the winter season which would hinder construction at this time
and, since the need for the sewer is not Immediate, it is recommended
that construction be postponed until spring.
An accurate revised plan accompanies this report.
Respectfully submitted,
-0n T. P wiite7�,L�,
John T. Frawley
01ty Engineer
JTP:1
Has.
256-P - 2
CITY OF BANGOR, MAINE
Engineering Department
October 18, 1962
To: The Municipal Officers
Pursuant to City Council Order 250-P, passed Oct. 8, 1962,
directing the Acting City Engineer t0 prepare plans and cost esti-
mates together with a list of possible assessments for a new sever
to serve property on Odlin Road north of the Interstate Highway, the
following report Is submitted:
The proposed new installation will start at an existing manhole
on the Industrial Park Trunk Sever on Od11n Road southerly of the
Interstate Highway and will extend in a northerly direction across
the Interstate Highway and along Cilia Road. The new installation
will require 900 feet of 8 inch vitrified clay pipe and three new
manholes. The total estimated cost Of this installation amounts to
eleven thousand four hundred dollars (',}11,400), of which amount 75%,
or eight thousand five hundred and fifty dollars ('i8,550), may be
assessed against the property benefited. A list of possible assess-
ments follows:
Possible
Name Parcels Frontage Assessments
VEST SIDE
State of Maine 1 350' ,,1456.20
(non -assessable)
Mrs. Barbara Simpson 1 28O' 1164.96
United States Gov't 1 100' 416.06
(non -assessable)
Arthur PI. & Dorothy Kelley 1 290' 1206.58
BAST SIDE
State of Maine 1 435' 1809.85
(non -assessable)
Henry H. Page 2 600 2496.35
Upon completion of the survey and cost estimate, each of the
abutting property owners subject to assessment was sent a written
notice advising them of their proportionate more of the estimated
cost of the proposed sever together with a form t0 be returned on
which they indicated whether they were in favor or opposed to the
construction of the new sewer. Summarized below are the results of
this questionnaire:
256-P - 3
Accurate plans showing the proposed layout accompany this
report.
Respectfully submitted,
Sohn T. Frawley
Acting City Engineer
STF:1
Etc.
Total
Parcels _
Frontage
Percent
In favor
2
6W
570'
29'2%
27.7%
Opposed
2
No reply0
3
885'
43.18
Non -assessable
Accurate plans showing the proposed layout accompany this
report.
Respectfully submitted,
Sohn T. Frawley
Acting City Engineer
STF:1
Etc.
CITY OF B.A G
DD IN ROAD E A F P�
N 2 1 05 TER TAPE 'bE5 1
y... JAi MOV D
PiAN NO 5 63z
L; v
ei_i
e Tp�s e
m - t REvi5ED 'NtlY.Z$�962
' o tied B A R B A A S l M. -
_
✓I _JU
4,
R O A D
A
1
11
1a
i* o''m
�n
u, w1�1
O D
L I
N
CITY OF B.A G
DD IN ROAD E A F P�
N 2 1 05 TER TAPE 'bE5 1
y... JAi MOV D
PiAN NO 5 63z
L; v
ei_i
e Tp�s e
m - t REvi5ED 'NtlY.Z$�962
' o tied B A R B A A S l M. -
_
✓I _JU
4,
R O A D
I IF 111 T 'IT F5 OF -
ARTHUR W. � DOROTHY F. KE_':.EY
fZEV13 E6
NO'A 231902 .
_
-
- CITY
OP BANGOR-
-NGrNEERING DEPARTMENT
ODI iN
ROAD SEWER
NORTH
OF. IMTER5TATE."JS
T-
0 VbZl2.1 iJ VERT
I'-4'
oa [ ocr. 1 is -a
PLAN NO S 3?
;
KEUEEEI.a ESEER Frou
s aNF
NEW roRK POVILEr PIIA sA. o
1
r
'-
-
I
,
Ott
_.
F
-
_-
-
.
J -Z_
_
_
T
-
LAT
I
KEUEEEI.a ESEER Frou
s aNF
NEW roRK POVILEr PIIA sA. o
1
ARTHUR w. d DOROTHY F. X�- 'EY
KKKK
a.?"
NEVFML& Eop.SER CO.