HomeMy WebLinkAbout1960-10-24 253-M ORDERIntroduced by Councilor Higgins 253-M
CITY OF BANGOR
MTLEJ (002r, -..Accepting --Report of the.... City. Engineer....on Laygut..oS.' Land
..Son....a..New Approach Road...and. Approach Fills for Relocation of Morse
Bridge.
By City Counsi/ofi City of Bangor:
OEDEEED,
THAT the attached written return of the City Engineer on
the layout of land to be used for a new approach road and for
approach fills along Valley Avenue northerly of the present Morse
Bridge and for land needed for easement purposes at the southerly
and of the existing Morse Bridge as authorized by Council Order
#229-M, be and hereby is accepted and it is further
ORDERED, that the damages as recommended in the report be
approved for payment for full and just compensation for the
described land and that the property owners be so notified.
IN CITY COUNCIL
Oct. 249 1960
Referred to Public Works Committee
ande2 bled by the following yes and
no vote, Councilors voting yes,
Bailey, Barry, Blaisdell, Broom,
Delano, Higgins, Keith. Councilors
voting no, Cross and Whittaker.
WwAg rr
IN'CSTY COUNCIL
Nov. 14, 1960
Taken from table, PASSED by the.
following yea and no vote,
Councilors voting "at Bailey, Brown,
Delano, Gross, NHth, Whittaker.
Councilors voting not Barry, Higgins.
Councilor Blaisdell absent.
ORDER
IN"
253-M
Ac epting,_Peport of City. Engineer_.
on Layout of Land for Nen Approach
B aC _8 Approach Fills for _Relocation
of Worse Bridge.
iatradaced aed Bled by
Description of Land
Beginning at a point formed by the intersection of the east-
erly side line of Valley Avenue and the southeasterly side line
of the existing Morse Bridge right-of-way; thence northerly along
the easterly side line of said Valley Avenue for a distance of
about 900 feet; thence easterly on the northerly property line
of land now or formerly owned by A. David Rapaport to the edge
of Ken uskeag Stream, a distance of about 15 feet; thence south-
erly along the existing shore line of said Kanduskeag Stream to
a point where said shore line crosses the southeasterly side line
of the right-of-way, for Morse Bridge; thence northwesterly along
amid southeasterly right-of-way line of Morse Bridge for a distance
of about 75 feat to the point of beginning and containing approx-
imately 63,000 square feet.
The above described parcel of land contains all of the Droper-
ty owned by A. David Rapaport lying northerly of the prevent
Morse Bridge and easterly of the easterly side line of Valley
Avenue and consists of the area between the easterly right-of-
way line of Valley Avenue and the westerly shore line of Kendus-
keag Strom. No buildings presently exist within t he limits of
the above description.
Second Parcel - Easement only
Beginning at a point famed by the easterly side line of
Harlow Street and the northerly side line of property now owned
by A. David Rapaport; thence northeasterly along the existing
property line, a distance of about 25 feet; thence southwesterly
to the northeasterly edge of Mill Street, so-called, as now exist-
ing, a distance of about 40 feet; thence southerly across Mill
Street and to the northerly edge of the present warehouse, a
die tones of about 60 feet; thence westerly along the northerly
Description of Land Page 2
edge of said warehouse, a distance of about 30 feet; thence
southerly along the westerly edge of said warehouse to the east-
erly side line of Harlow Street, a distance of about 60 feet;
thence northerly along the easterly side line of Harlow Street,
a distance of about 90 feet to the point of beginning, and con-
taining 3,105 square feet.
The above description refers to the area on which awe grading
will be necessary to adjust the approach on Mill Street and the
unloading area at the northerly end of the present warehouse to
the new grade of the bridge at the new location. This easement
is take, for the purpose of permitting the contractor to enter
upon
the premises to complete
this
grading work.
Third
Parcel - Easement Only
Beginning at a point formed by the intersection of the
westerly side line of Harlow Street and the northerly side line
of property now owned by Moriesette Warehouses, Inc.; thence
southwesterly along the property line of said Morissette Ware.
houses, Inc. for a distance of about 45 feet; thence southerly
along the line of an existing stone retaining wall to the edge
of a brick and frame structure formerly known as the "sash m111",
a distance of about 50 feet; thence easterly along said "sash mill"
building to the westerly side line of Harlow Street, a distance
of about 47 feet; thence northerly along the westerly aide line
of said Harlow Street to the point of beginning, a distance of
about 72 feet, end containing 2,448 square feet.
The above described area has been taken for the purpose
of providing temporary access to the wooden bridge after it has
been moved to a temporary location and put in use temporarily
to carry traffic while the new bridge is under construction
Description of Lend Page 3
and also to be used for storage of materials to be used during
the construction of the new bridge.
Thera appeared at the time end place set for the meeting,
the following;
A. David Rapaport
Louis Rapaport
Edward MOGinsis, Office Manager
Paul Atwood, Engineer, representing A. David Rapaport
The City Engineer reed the Council order authorizing the
procedure to be followed by the land taking. The City Engineer
discussed the land values with those present and also advised
them of the assessed valuation of the first parcel described.
It was also pointed out that this land is in ay "B" sone area
and, accordingly, at this time can not be used for business or
commercial purposes. They were also advised the t the Planning
Board, on January 25, 1960, refected a request to rezone this
particular area. From these discussions, the City Engineer makes
the following recommendations:
Parcel Nl
Approximately 63,000 square feet
Assessed valuation go.c0
Recommended damages 900.00
Parcel k2 Easement only
Approximately 3,10$ square feet No damage
Parcel #3 Easement only
Approximately 2,448 square feet
At the request of Mr. Jerome Davlau, Attorney
for Morissette warehouses, Inc., decision on
recommended damages postponed until November 23,
1960 at which time a supplementary report will
be submitted.
A plan showing the above described takings 1s attached.
/Respectfully aUbbmmittteed,
Janes L. MacLeod
SLM:1 City Engineer
Oat. 17. 1960
N inset" b"MMM. you,
geterwille. Kai"
Omtlemml
This is be inform Two that who"" by wirtM of M order
or the City Oasemil of the Oily of Bangor. #221-g. Posted M
Ostobw 10. 1960 di"ating the Oitf foglour to layout lewd
withim tea gw O &te limits for a use tridge location for and m
behalf of the wiei9al offl Bare of the City of Bangor. and
wbe"u you hen been notified that a meting will be hold
Outwear 19. 1960. at 10100 A. g.. TUT. in y offiM far the
VWP"e of dete"Saing bensfitse if myp or ugMin`■ damaged
from the "salt of the above layout, mer therefore. it In
hn"y ag"od that whereas you have asked far additional time
for soon a hearing, you are he"y notified that this haring
will be continued to Wednesday. ■avmbee 2nd. for foo Purposes
indleated.
This emtiamanes is to he withoutM and is not to
eaan
ssiderad a waiver of any her
rights of siParty.
CITY of BANGOR,
To the City Cannell:
Pursuant to an order of the City Caused], paesed.---_Dntolnev..1Q.e.-.19bA+ge.-U9-M
directing the City Engineer to lay out_Saud.-tos.... end........
City Engineer begs leave to report:
That of his Intention to ley out ... gaLd_atnwU...lageELOn-aad-RQ6PAACh...SS11..-gxefl
the City Engineer gave written notice by noticed attached to copies of said order ported for seven
days Prior In the.... 19th.. day .-af-XntnlaP.t-a Std)._ __..-.-_.................—.-._
in two public places in the City of Reagan and in the vicinity of said street, to wit:
One at Harlow Street end of Morse
One at Valley Avenue end of Morse
and else gave notice by meaing the same to be published in the EAsuum DA y News, lairmudilm
newrpapep printed in said city, for one week prior to the... -]9th- -
.-of--oat. .,1960wpy of said order and notices, so pound and published, is herein annexed and
made part of this report.
And that the said City Engineer met at the time and place of meeting specified in the action
and proceeded to ]ay out street location and approach f111 area as follows:
NOTICE
E3
Notice is hereby given that in pursuance of an order of the City Couneii...._.#??_9. .
directing the City Engineer to lay out ---- Land.-Pnn-area.-BRRrnaCh-SRad._�.ccation-
and .. a;cprp ash. f I ,llsfor a new bridge across ICendnalreag Stream
the City Engineer will meet on. .... ....._lYedmadage.--0chuber..L4.t..196Q....................................
at - t 19:09-A__M...A-EDT9... Ql;-thg Rff ice of_Ehe Cit9 Engineer
and will proceed to lay out .._said--brat}..oaa...gpove-dsacribed_..------ _----------- ..
and determine the damages or benedtr any person will sustain by reason thereof and apportion
such damages or teuefifs, it anv according to law, upon the Iota or parcels of land demand of
benefited by such laying out.
Notice is hereby given to all persona interested m the premises to appear at the above men-
tioned tbne and piece of meeting, if they see cause two and there to he heard upon the subject.
_
City Engineer
npaKr.. NtW__-C.Lilaye CITY OF BANGOR, MAINE
...jSEKs�S[£KEfvfz_____ Engineering DePar menf
-------- -------- ------------ __--- --------- _._.
I
II �I
II II
1�
II
�I
I;
II
I I
I
li
I
C
� 3
T
Z %
O
C
H
m
D
O A DAVID RAPAPORr (kN
Ewl
Or Wsw 6~i e
U A. DAVID RA PA PORT
31 05 Sv, FT.
O MORISSETTE WAREHOUSES
IMC.` -
2.448 Sq. Fr.
SCALL 0-200'